GSM-R Applications in Turkey's High Speed Train Lines

Nuri Hakan Ekmekci TCDD, Etude, Project and Investment Department Electrification and Signalization Division

Content

GSM-R Projects in Turkey Tunnel Coverage Applications GSM-R QoS tests

GSM-R Projects: Projects Map

• • *Taken from 11th transportation, maritime and communication council report, june 2013.

Already, about 480 km of HS tracks deployed/contracted for GSM-R system.

Also, GSM-R has beginned to be installed on Conventional Rail lines to replace old analog radio systems.

GSM-R Projects (Completed): Ankara Eskişehir-İnönü-NSS Part Line Characteristics:

– 276 km, Double Track – Speed: 250km/h, ETCS Level 2 (ETCS Level 1 as fallback)

GSM-R Project Data (NSS Part)

– Vendor: NSN – NSS system components: • MSC/VLR, HLR/AuC, (R99 version), GPRS, IN, SMS-C, Dispatcher PBX, AcK, Dispatcher Consoles, VRS, OMC-S – For ETCS Level 2, 3 RBC connected to MSC

Ank. İst. BSS GSM-R Projects (Completed): -NSS Part Architecture Ankara Eskişehir-İnönü RBCs Ankara OMC-R

LAN

OMC-S

S M S C

R B C R B C R B C

MSC/ VLR

Disp. PBX Ank. Kon. BSS

AcK HLR/ AUC IN VRS

Ankara-Konya RBCs

R B C R B C

ISDN BRI/PRI E1 Ethernet/IP, Fr Conn.

SGSN GPRS Part GGSN

Eskişehir(İnönü)-Koseköy RBCs

R B C R B C

GSM-R Projects (Completed): Ankara Eskişehir -İnönüPhase I BSS Part GSM-R Project Data (BSS Part)

– Double Layer Radio Coverage (Co-Sited) • -85dBm, -75dBm, -92dBm and -77dBm target coverage levels for trains, stations/shunting yards, handheld portables and tunnels, respectively.

– #BTS sites:37 for each for each radio layer (total=74) – 2 BSC and TRAU for double layer coverage – OMC-R for BSS management

GSM-R Projects: BSS Architecture For Co-sited Double Coverage Site 1

BTS BTS SDH

Site 2

BTS BTS SDH

Site 3

BTS BTS SDH

Site 4

BTS BTS SDH

Site 5

BTS BTS SDH

Site 6

BTS BTS SDH

Site 7

BTS BTS SDH

Site 8

BTS BTS SDH

Site 9

BTS BTS SDH

Site 10

BTS BTS SDH

Site 11

BTS BTS SDH

Site 12

BTS BTS SDH

Site 13

BTS BTS SDH

Site 14

BTS BTS SDH

Each Layer of BTSs are connected to seperate BSC&TRAU. Also BTSs are looped (max. 5 BTS) to increase reliability BSC& TRAU #1 BSC& TRAU #2

MSC

GSM-R Projects (Completed): Ankara-Konya

Line Characteristics:

– Approximately 212km, double track, 1 Tunnel of approx. 2km length – Speed: 250km/h, ETCS Level 2 (Level 1 as fallback)

GSM-R Project Data

– Vendor: Kapsch – Single Layer Radio Coverage •

Eirene SRS 3.2.3 compliant: -92dBm, -94dBm, -99dBm, -82dBm target coverage level for trains, shunting,handheld portables and tunnels, respectively.

– Integrated into existing NSS – OMC-R for BSS – 1 BSC and 1 TRAU, 21 BTS – 2 RBC connected to MSC

GSM-R Projects (On-Going): Ankara İstanbul Phase II İnönü Köseköy Section

Line Characteristics:

Approximately 150 km, several tunnels of total length approx. 60 km Speed: 250km/h speed, ETCS Level 2 (Level 1 as fallback)

GSM-R Project Data

Vendor: NSNDouble Layer Radio Coverage (Co-sited for open area, interleaved in

tunnels):

-92dBm, -94dBm, -99dBm, - 82dBm target coverage levels for trains,

shunting and handheld portables and tunnels respectively

BTSs are connected to existing BSCs (Phase I), BSS Integrated into existing

NSS

# BTS sites: 44 (22 each layer), Each Layer connected to different BSCs,Tunnel Coverage: F/O Repeaters, Leaky Feeder, Mu’s and OMC for Repater

system

2 RBC will be connected to MSC

GSM-R Projects (On-Going): KÖSEKÖY-GEBZE-İstanbul (Haydarpaşa) Section Line Characteristics:

Approx. 100 km(coverage requirement for GSM-R ), 10 tunnels

of total length approx. 2701 m

160km/h speed, ETCS Level 1

GSM-R Project Data

Vendor: KapschDouble Layer Radio Coverage (Interleaved using 1 BSC): -85dBm, -82dBm, -99dBm target coverage level for trains,

station/shunting yards and handheld portables, respectively

In case of one BTS failure, -92dBm coverage requirementWill be integrated into existing NSS1 BSC

GSM-R Projects : Köseköy-Gebze BSS Architecture

Against failure of one BTS site following scheme is adopted.

-85dBm -92dBm

Site 1

BTS

Site 2

BTS

Site 3

BTS

Site 4

BTS

Site 5

BTS BTS

BSC& TRAU MSC

TUNNEL COVERAGE APPLICATIONS-I

To raise the reliability of tunnel coverage system, • the donor signals of two-adjacent BTS sites signal is fed to each repeater.

• Additionally, inside the tunnels each RU is placed to ensure coverage even if one RU fails (interleaved coverage)

BTS L-B BTS L-A MU L-A

Site #1

R U

Leaky Feeder Cable

R U R U R U MU L-B BTS L-A BTS L-B

Site #2

TUNNEL COVERAGE APPLICATIONS-II

Tunnel coverage scheme using antennas: 1 tunnel approx. 2km length Drive Test Result for Coverage Coverage requirement >-82dBm is met. Tunnel coverage also tested for subset 093 for data

GSM-R QoS Drive Tests Applications For Voice Quality;

– Coverage level, RxQual – Handover success rate, Handover execution delay – Connection establishment delay (also for ETCS data) – Cell (re)selection/HO ping pong – Call Set up success rate, Connection Drop Rate (also for ETCS data) – In Tunnel Coverage – Handheld Units Coverage

For Data (in accordance with Subset 093);

– Data transmission interference rate – Transfer delay of user data frame – Connection loss rate (data) – Network registration delay

Thanks for listening