CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011 Agenda 1. 2. 3. 4. 5. 6. Progress since last meeting Issues, opportunities and risks arising during the previous.
Download ReportTranscript CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011 Agenda 1. 2. 3. 4. 5. 6. Progress since last meeting Issues, opportunities and risks arising during the previous.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011 Agenda 1. 2. 3. 4. 5. 6. Progress since last meeting Issues, opportunities and risks arising during the previous week Verify progress against stakeholder expectations General issues discussion Action items for individuals Expected work output during next week © 2011 Electric Power Research Institute, Inc. All rights reserved. 2 Progress Since Last Call • Mark Ortiz furnished VPN client for Consumers server – Windows 64 bit version available EPRI FTP site – Windows 32 bit version also needed • Sample messages created © 2011 Electric Power Research Institute, Inc. All rights reserved. 3 Paris CIM Interop Test Last Week © 2011 Electric Power Research Institute, Inc. All rights reserved. 4 Meter Outage System Test ECITP 2.05 / 2.06 Systems Under Test Validate Outage Reporting Meter CREATED (EndDeviceEvents) 2000 Meter outages, 1000 comm failures MR-MDM / MDMS (Optional) AMI Network Item(s) Tested Item used in test © 2011 Electric Power Research Institute, Inc. All rights reserved. 5 CREATED (EndDeviceEvents) NO-FLT OMS Outage Management Part 9 Message Mapping Test Procedures Systems Under Test Service Messages Operati ons Payload XSD • 1.05 Meter MDMS, Outage Nominal OMS Conformance Created Create Reply Create Reply Create Reply EndDeviceEvents MeterServiceRequest (Message) EndDeviceControls (Message) MeterReadings MeterReadings • 1.06 Meter Outage Message and XML Errors XSD created EndDeviceEvents MeterServiceRequest MeterServiceRequest EndDeviceControls EndDeviceControls MeterReadings MeterReadings • 2.05 Meter Outage Nominal Interoperability • 2.06 Meter Outage System Errors © 2011 Electric Power Research Institute, Inc. All rights reserved. 6 EndDeviceEventsMessage MeterServiceRequestsMessage MeterServiceRequestsMessage EndDeviceControlsMessage EndDeviceControlsMessage MeterReadingsMessage MeterReadingsMessage CIM Common Message Structure © 2011 Electric Power Research Institute, Inc. All rights reserved. 7 UML for EndDeviceControls Messages © 2011 Electric Power Research Institute, Inc. All rights reserved. 8 Sample CreateEndDeviceEvents Message <?xml version="1.0" encoding="UTF-8"?> <CIMCommonMsg:CreateEndDeviceEvents xmlns:Payload="http://iec.ch/TC57/2010/EndDeviceEvents#" xmlns:CIMCommonMsg="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" xmlns:MessageHeader="http://www.iec.ch/TC57/2010/schema/message" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage file:///c:/EnerNex/EndDeviceEventsMessage.xsd" version="1.0.0" > <CIMCommonMsg:Header> <MessageHeader:Verb>Create</MessageHeader:Verb> <MessageHeader:Noun>EndDeviceEvent</MessageHeader:Noun> <MessageHeader:Timestamp>2011-05-10T12:00:00-05:00</MessageHeader:Timestamp> <MessageHeader:Source> source_identifier of requesting machine </MessageHeader:Source> </CIMCommonMsg:Header> </CIMCommonMsg:CreateEndDeviceEvents> • Need Sample “Initiate Service” message © 2011 Electric Power Research Institute, Inc. All rights reserved. 9 Sample “Last Gasp” Meter Power Outage EndDeviceEvent Message <?xml version="1.0"?> <CIMCommonMsg:EndDeviceEventsResponseMessage xmlns:Payload="http://iec.ch/TC57/2010/EndDeviceEvents#" xmlns:CIMCommonMsg="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" xmlns:MessageHeader="http://www.iec.ch/TC57/2010/schema/message" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage file:///c:/EnerNex/EndDeviceEventsMessage.xsd" version="1.0.0" > <CIMCommonMsg:Header> <MessageHeader:Verb>Created</MessageHeader:Verb> <MessageHeader:Noun>EndDeviceEvent</MessageHeader:Noun> <MessageHeader:Timestamp>2011-05-10T12:00:00-05:00</MessageHeader:Timestamp> </CIMCommonMsg:Header> <Payload:EndDeviceEvent> <Payload:createdDateTime>2011-11-04T18:52:50.001-05:00</Payload:createdDateTime> <Payload:EndDeviceEventType>3.26.17.85</Payload:EndDeviceEventType> <Payload:description>Meter Last Gasp loss of power </Payload:description> <Payload:Assets> <Payload:mRID>3dc53ee5-777e-50b4-8699-a1c224f45f3d</Payload:mRID> <Payload:Names> <Payload:name>Meter23253</Payload:name> </Payload:Names> </Payload:Assets> </Payload:EndDeviceEvent> </CIMCommonMsg:EndDeviceEventsResponseMessage> © 2011 Electric Power Research Institute, Inc. All rights reserved. 10 Open Action Items Assignee Action Status John Simmins Work with internal resources to separate lab network completely from the EPRI operational network. In process Mark Ortiz Provide written procedures on access to Consumer’s DMZ network and server In process Kay Stefferud Contract Mark Ortiz to request written procedures to access the Consumers server. In process Margaret Goodrich Mark Ortiz Review sample abstract test case. Send Kay excel spreadsheet with test set-up information. In process In process © 2011 Electric Power Research Institute, Inc. All rights reserved. 11 Expected Work Output During the Next Week • Meeting with Consumers (Mark) and EnerNex (Kay) –Consumer server login process • Continue Sample Messages –Sample message from IOP would be helpful • Process to connect multiple test sites needs to be dry run © 2011 Electric Power Research Institute, Inc. All rights reserved. 12 Together…Shaping the Future of Electricity © 2011 Electric Power Research Institute, Inc. All rights reserved. 13