SAOCOM Mission Update Laura Frulla CONAE February, 2015 Mission Update Mission Critical Design Review (M-CDR) in Nov.
Download ReportTranscript SAOCOM Mission Update Laura Frulla CONAE February, 2015 Mission Update Mission Critical Design Review (M-CDR) in Nov.
SAOCOM Mission Update Laura Frulla CONAE 1 February, 2015 Mission Update Mission Critical Design Review (M-CDR) in Nov. 2013 Passed OK Flight Segment Qualification Review Step 1: July 2015 SAR Instrument Qualification Review: July 2015 Flight Segment Qualification Review Step 2: July 2016 Ground Segment Qualification Review: July 2016 Launch Readiness Review PFM: November 2016 Launch schedule: SAOCOM 1A: November 2016 SAOCOM 1B: October 2017 2 February, 2015 SAR Instrument EM SAR Antenna Panel EM stage 2 SAR CE EM1 – Dummy load SAR CE EM1 6 February, 2015 Antenna Deployment 7 February, 2015 Product Tree Ref: SAO-MIS-HB-00001-A 12 February, 2015 Products Processing Levels RAW data products (data stream), Level 0 products (Annotated RAW data-AR) Level 1 products Level 1A: Single Look Complex-SLC, Level 1B: Detected Image-DI, Level 1C: Ground Ellipsoid Corrected-GEC (default), Level 1D: Geocoded Terrain Corrected-GTC. Higher level products 14 February, 2015 SAOCOM Science Team and Applications Component PI L. Frulla Deputies G.R. Ortega- J. Milovich Announcements of Opportunity Projects PIs of the different projects Science Team M. Thibeault External Calibration M. Thibeault/Deputy: T. Zajc Soil Moisture D. Dadamia Field Campaign A. Soldano Support System for Decision Making in Agriculture Risk Hydrological Emergency Management H. Lozza M. Uriburu Wheat Head Blight Disease Forecast System SAS M. Acuña Interferometry M. Azcueta Deputy: N. Grunfeld SIS Oil Spill and Object Detection M. Jáuregui/Deputy: M. Camuyrano Science Processors A. Lorenzo SOS DEM A. Soldano/Deputy: N. Grunfeld Snow Cover Estimations N. Grunfeld Biomass and Forest Carbon Capture A. Lorenzo 15 February, 2015 SAR CALVAL – Sites Status Institutional agreements (2 of 3 main sites defined) Main Sites • El Sosneado (Malargue): Agreed for CR and PARC and partially installed • CASLEO (San Juan): Agreed for CR, PARC agreement ongoing • El Alambrado (Malargue): under study, first contacts made Support Sites • DS3 (Malargue): back up option, first contacts made • CETT (Cordoba): commissioning site and PARC testing site, partially installed • Tierra del Fuego (Tolhuin) 16 February, 2015