SAOCOM Mission Update Laura Frulla CONAE February, 2015 Mission Update  Mission Critical Design Review (M-CDR) in Nov.

Download Report

Transcript SAOCOM Mission Update Laura Frulla CONAE February, 2015 Mission Update  Mission Critical Design Review (M-CDR) in Nov.

SAOCOM Mission Update
Laura Frulla
CONAE
1
February, 2015
Mission Update
 Mission Critical Design Review (M-CDR) in Nov. 2013
 Passed OK
 Flight Segment Qualification Review Step 1: July 2015
 SAR Instrument Qualification Review: July 2015
 Flight Segment Qualification Review Step 2: July 2016
 Ground Segment Qualification Review: July 2016
 Launch Readiness Review PFM: November 2016
 Launch schedule:
 SAOCOM 1A: November 2016
 SAOCOM 1B: October 2017
2
February, 2015
SAR Instrument EM
SAR Antenna Panel EM stage 2
SAR CE EM1 –
Dummy load
SAR CE
EM1
6
February, 2015
Antenna Deployment
7
February, 2015
Product Tree
Ref: SAO-MIS-HB-00001-A
12
February, 2015
Products Processing Levels
 RAW data products (data stream),
 Level 0 products (Annotated RAW data-AR)
 Level 1 products
 Level 1A: Single Look Complex-SLC,
 Level 1B: Detected Image-DI,
 Level 1C: Ground Ellipsoid Corrected-GEC (default),
 Level 1D: Geocoded Terrain Corrected-GTC.
 Higher level products
14
February, 2015
SAOCOM Science Team and Applications Component
PI
L. Frulla
Deputies
G.R. Ortega- J. Milovich
Announcements of Opportunity Projects
PIs of the different projects
Science Team
M. Thibeault
External Calibration
M. Thibeault/Deputy: T. Zajc
Soil Moisture
D. Dadamia
Field Campaign
A. Soldano
Support System for Decision
Making in Agriculture
Risk Hydrological Emergency
Management
H. Lozza
M. Uriburu
Wheat Head Blight Disease
Forecast System
SAS
M. Acuña
Interferometry
M. Azcueta
Deputy: N. Grunfeld
SIS
Oil Spill and Object Detection
M. Jáuregui/Deputy: M. Camuyrano
Science Processors
A. Lorenzo
SOS
DEM
A. Soldano/Deputy: N. Grunfeld
Snow Cover Estimations
N. Grunfeld
Biomass and Forest Carbon Capture
A. Lorenzo
15
February, 2015
SAR CALVAL – Sites Status
Institutional agreements (2 of 3 main sites defined)
Main Sites
• El Sosneado (Malargue): Agreed for CR and PARC
and partially installed
• CASLEO (San Juan): Agreed for CR, PARC
agreement ongoing
• El Alambrado (Malargue): under study, first contacts
made
Support Sites
• DS3 (Malargue): back up option, first contacts made
• CETT (Cordoba): commissioning site and PARC
testing site, partially installed
• Tierra del Fuego (Tolhuin)
16
February, 2015