Successful CNS/ATM Project Implementation: Human Resource and Training Needs Dr. Frank T.
Download ReportTranscript Successful CNS/ATM Project Implementation: Human Resource and Training Needs Dr. Frank T.
Successful CNS/ATM Project Implementation: Human Resource and Training Needs Dr. Frank T. Ruggiero Project Director FANS Stakeholders’ Group IATA Headquarters, Montreal, Quebec [email protected] 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil CNS/ATM Success Factors Approval ANPp Planning Global Development National Regional 15 May 98 Worldwide CNS/ATM Conference Project Management Operations Implementation ANPp Maintenance Transition Rio de Janeiro, Brazil Planning for Success: Lessons from 5 Years of Projects Satisfying Regional Differences while Maintaining Interoperability with Global Approach Cost-benefit & Business Case for adopting FANS, CNS/ATM elements for all stakeholders’ Need for “implementation orientated” regional coalitions for achieving real progress Team-Centered, Human Resources Management, Planning & Training Plan 15 May 98 and manage full system life-cycle solution Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Focus on Technical System Component Design 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Focus on Technical System Component Design (RNP 5) Basic RNAV ‘98 / 8.33 kHz VHF ‘99 / (RNP 1) Data Link Comm ‘01 (RNP 10) ‘98/ (RNP 10) ‘98/ ADS-A, RNP-4 CPDLC ‘03 ADS-A, RNP-4 CPDLC ‘03 Reduced Vertical Separation Minimums (RVSM) ‘98 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Focus on Technical System Component Design Typical CNS/ATM Transition Table Rqmt Planning Documents ICAO COM/ DIV-Apr 95 MNC Statement Technical Documents SARPs Annex 10 EUROCAE MOPS ED23B RTCA MOPS, DO-186A VHF DL ACARS, Mode 2 (AVPAC), Mode 3 (TDMA) HFDL ICAO COM/ DIV-Apr 95 NAS Arch Plan Draft VDL SARPs ARINC 716-9, 750-1 TDMA draft MASPs Mode 2 draft MOPS ICAO AMCP/4 Mar 96 SATCOM ATS SR&O IPACG/9 FAA/JCAB Strategic Oceanic Plan All ADS/CPDLC Plans Draft SARPs, to be completed late 97 ARINC 753, 635, 634 Draft MASPs and MOPS, to be completed late 97 AMSS SARPs, Annex 10 ARINC Char 741 RTCA DO-210C,215A,222 FAA Notice N8110.58 8.33 kHz VHF CMU 15 May 98 ARINC Char 758 ARINC Report 660 Carriage Documents Eurocontrol 8.33 Implementation Plan, 8.33 kHz User Guide AIC IFR 6/96 (Ger) Potential Solutions See Radio Slide UHF alternative Dates/ Confidence Eur - Jan 99 (High) CONUS TDMA 2004-2010 (Low) Europe Mode 2 ~2005 (Low) ICAO Annex 11 proposal ARC-190/CP2024B Pacific 2003-2005 (Med-High) NAT >2000 (Low-Med) Aero-H Aero-I UHF SATCOM (?) Iridium (?) Pacific 2003-2005 (Med-High) NAT >2000 (Low-Med) Allied Signal Collins CMU-900 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Airport Analysis Lacks Work Systems 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Work Task/Systems Analysis 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Large System Development 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Full Life-cycle Project Planning Process Approval ANPp Planning Global Development National Project Management Implementation Regional 15 May 98 Operations ANPp Maintenance Transition Worldwide CNS/ATM Conference Rio de Janeiro, Brazil Conclusions 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil CNS/ATM Implementation Specialist Develop a new accredited job skill “Bridge” between Planning and Operations CNS/ATM Implementation Specialist Modular training approach Would not replace consultants, but improve their effectiveness and reduce risk Approval ANPp Planning Global Development National Project Management Operations Implementation Regional ANPp Maintenance Transition CNS/ATM Implementation Specialist 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil [email protected] 15 May 98 Worldwide CNS/ATM Conference Rio de Janeiro, Brazil