CNS/ATM Success Factors
Approval
ANPp
Planning
Global
Development
National
Regional
15 May 98
Worldwide CNS/ATM Conference
Project
Management
Operations
Implementation
ANPp
Maintenance
Transition
Rio de Janeiro, Brazil
Planning for Success: Lessons from 5 Years of Projects
 Satisfying
Regional Differences while Maintaining
Interoperability with Global Approach
 Cost-benefit
& Business Case for adopting FANS,
CNS/ATM elements for all stakeholders’
 Need
for “implementation orientated” regional
coalitions for achieving real progress
 Team-Centered,
Human Resources Management,
Planning & Training
 Plan
15 May 98
and manage full system life-cycle solution
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Focus on Technical System Component Design
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Focus on Technical System Component Design
(RNP 5) Basic RNAV ‘98 / 8.33 kHz VHF ‘99 / (RNP 1) Data Link Comm ‘01
(RNP 10) ‘98/
(RNP 10) ‘98/
ADS-A, RNP-4 CPDLC ‘03
ADS-A, RNP-4 CPDLC ‘03
Reduced Vertical Separation Minimums (RVSM) ‘98
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Focus on Technical System Component Design
Typical CNS/ATM Transition Table
Rqmt
Planning
Documents
ICAO COM/
DIV-Apr 95
MNC Statement
Technical
Documents
SARPs Annex 10
EUROCAE MOPS ED23B
RTCA MOPS, DO-186A
VHF DL
ACARS,
Mode 2
(AVPAC),
Mode 3
(TDMA)
HFDL
ICAO COM/
DIV-Apr 95
NAS Arch Plan
Draft VDL SARPs
ARINC 716-9, 750-1
TDMA draft MASPs
Mode 2 draft MOPS
ICAO AMCP/4
Mar 96
SATCOM
ATS SR&O
IPACG/9
FAA/JCAB
Strategic Oceanic
Plan
All ADS/CPDLC
Plans
Draft SARPs, to be completed
late 97
ARINC 753, 635, 634
Draft MASPs and MOPS, to be
completed late 97
AMSS SARPs, Annex 10
ARINC Char 741
RTCA DO-210C,215A,222
FAA Notice N8110.58
8.33 kHz
VHF
CMU
15 May 98
ARINC Char 758
ARINC Report 660
Carriage
Documents
Eurocontrol 8.33
Implementation Plan,
8.33 kHz User Guide
AIC IFR 6/96 (Ger)
Potential
Solutions
See Radio Slide
UHF alternative
Dates/ Confidence
Eur - Jan 99
(High)
CONUS TDMA 2004-2010
(Low)
Europe Mode 2
~2005 (Low)
ICAO Annex 11
proposal
ARC-190/CP2024B
Pacific 2003-2005
(Med-High)
NAT >2000
(Low-Med)
Aero-H
Aero-I
UHF SATCOM (?)
Iridium (?)
Pacific 2003-2005
(Med-High)
NAT >2000
(Low-Med)
Allied Signal
Collins CMU-900
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Airport Analysis Lacks Work Systems
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Work Task/Systems Analysis
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Large System Development
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Full Life-cycle Project Planning Process
Approval
ANPp
Planning
Global
Development
National
Project
Management
Implementation
Regional
15 May 98
Operations
ANPp
Maintenance
Transition
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
Conclusions
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
CNS/ATM Implementation Specialist
Develop a new accredited job skill

“Bridge” between
Planning and Operations
CNS/ATM
Implementation
Specialist
Modular training approach
Would not replace consultants, but improve their
effectiveness and reduce risk
Approval
ANPp
Planning
Global
Development
National
Project
Management
Operations
Implementation
Regional
ANPp
Maintenance
Transition
CNS/ATM Implementation Specialist
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil
[email protected]
15 May 98
Worldwide CNS/ATM Conference
Rio de Janeiro, Brazil