LAL Site Report Michel Jouvin LAL / IN2P3 [email protected] General News LAL has a new director : Guy Wormser Strong support to GRID effort GRID group.
Download ReportTranscript LAL Site Report Michel Jouvin LAL / IN2P3 [email protected] General News LAL has a new director : Guy Wormser Strong support to GRID effort GRID group.
LAL Site Report Michel Jouvin LAL / IN2P3 [email protected] General News LAL has a new director : Guy Wormser Strong support to GRID effort GRID group officially « blessed » Leader : Cal Loomis (permanent position) Coordination of LAL grid related efforts Formerly G. Wormser Not EGEE/LCG only : XtremWeb (collabarotion with CS) Computing engineers AND experiments members Involved in GRIF project 12/10/2005 LAL Site Report - HEPix - SLAC 2005 Main Resources Electronic CAD (20 Sun CPUs) DS20 HDS 9570 FC 9 TB •NFS •SMB •Appletalk •www •Mail •Print Linux Experiments (60 CPUs) GRID Fram (50 CPUs) DS20e Gb Ethernet Xterm Alpha Experiments (8 CPUs) Mac (100) PC (300) 100 Mb 10 Mb 12/10/2005 LAL Site Report - HEPix - SLAC 2005 LSF Cluster 100 Go HDS 9570 3 TB Main HW Changes 20 dual Opteron 2,2Ghz installed 1/3 for GRIF T2 6TB installed, 9TB on order ½ for GRIF T2 2 Linux machines connected to SAN (QL2340) Single attachment, plan to look for path failover later SRM based SE using LCG DPM (2 disk servers) SATA extension to HDS 9570V 12/10/2005 Acceptable cost : 12 k€ for 4,5 TB (Raid5) Very easy and flexible integration in current LAL infrastructure LAL Site Report - HEPix - SLAC 2005 OS Updates Scientific Linux everywhere (3.0.5) Currently installed on all new machines (i386 or amd64, 32 bits) Upgrade of RH 7.2/9 machines (25) by the end of year Will be done with Quattor (fresh installation) Deploying LCG UI on all LAL physics servers (20) Done with Quattor : easy to install and maintain VOMS with local VOs for non LHC users 12/10/2005 LAL Site Report - HEPix - SLAC 2005 Quattor In production for GRID and non GRID machines Easy and flexible sharing of configuration information, removing duplication Upgrade SL 3.0.4 3.0.5 done with Quattor Currently reinstalling all pre-Quattor machines Original CDB not used, replaced by SVN + http Starting multi-sites usage for GRIF 1 day Quattor tutorial held Sept. 30th DAPNIA : ½ day to setup specific configuration and install 2 test nodes 12/10/2005 Common configuration database, 1 Quattor server/node LAL Site Report - HEPix - SLAC 2005 Collaborative Tools : SPIP Web collaborative edition : SPIP A « Content Management » solution Collaborative/concurrent edition of Web pages Easy site structure/navigation (re)organization URLs independant of site structure Forums Look and feel customized through CSS Individual authentication and privileges Basic workflow LAL implemented a Plone-like (http://grif.fr) and a CNRS-like (http://www.lal.in2p3.fr) look and feel Used by several LAL groups Main LAL Web site, GRIF Web site, LAL support 12/10/2005 LAL Site Report - HEPix - SLAC 2005 Collaborative Tools : Trac Tools for project management integrating A WiKi (based on MoinMoin) : http://projects.edgewall.com/trac An issue tracker (trouble ticket system) A roadmap manager based on milestones A SVN browser Very clean plug-in API (0.9+) : all main features are plug-ins Ticket submission through Web or email Same model as Eclipse : Trac core is just a plug-in manager Cross reference between all types of information Very attractive when you need documentation + action follow-up 12/10/2005 SW development, computing operations, GRIF… LAL Site Report - HEPix - SLAC 2005 Collaborative Tools : Agenda At the very beginning LAL director wants to publish its agenda… Web-based agenda sharing Currently using phpICalendar WebDAV upload/download of ICS files 12/10/2005 Compatible with a lot of clients : Mac, Sunbird, Mulberry… Interoperable with CERN CDS Agenda and (InDiCo) Difficult sharing between multiple writers (file granularity) LAL Site Report - HEPix - SLAC 2005 Windows Infrastructure IN2P3 forest still very successfull New machines installed with WXP SP2 12 labs in production Move of LAL AD domain to IN2P3 forest still delayed : lack of manpower Running well, management cost very low… No migration plan for WXP SP1 Can be done on demand with SMS Antivirus : successful move to McAfee + : MSI deployment 12/10/2005 LAL Site Report - HEPix - SLAC 2005