International Civil Aviation Organization SIP/ASBU/2012-WP/7 Global Air Navigation Plan (GANP) – Framework for global planning H.
Download ReportTranscript International Civil Aviation Organization SIP/ASBU/2012-WP/7 Global Air Navigation Plan (GANP) – Framework for global planning H.
International Civil Aviation Organization SIP/ASBU/2012-WP/7 Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi 21-25 May 2012) Outline • • • • • Planning mechanisms Development of revised GANP What is new in the revised GANP What are the policy changes International agreement at the ANConf/12 ICAO SIP 2012- ASBU workshop 2 Planning Mechanisms… Partners ICAO Planning Levels Global Deliverables Guidance Global plan ICAO policy Regional planning Regional groups Regional plan Global plan Subregional/ or Multinational groups Subregional or Multinational Subregional plan or Multinational Regional plan States National National plan Regional plan ICAO SIP 2012- ASBU workshop Planning Mechanisms Planning Partners Levels Airspace users Regional, national Service Global, providers regional, national Industry Global, regional, national 4 Deliverables User-driven plan Serviceprovider plan Guidance Regional and national plans Global, regional and national plans Manufacturer Global, plan regional and national plans ICAO SIP 2012- ASBU workshop ICAO HQ GLOBAL ANP Global Plan, Regional Plans and National plans Online Interactive Planning Tools General Planning Principles REGIONAL ANP National Plans Volume I Volume II Basic part of Air Navigation Plan Facilities and Services Implementation Document Action Contribution line Harmonization 5 PIRGS ROs ICAO SIP 2012- ASBU workshop STATES What is Global Plan? • Strategic Document for regional and national planning for air navigation infrastructure • Serves as global guidance for PIRGs • Maturity process – First developed as global coordinated plan for CNS/ATM Systems in 1992 – In 1998 the Global Plan for CNS/ATM systems released – In 2006, the Global Plan for Air Navigation Systems was developed – In 2012, revised Global Plan will be presented during 12 ANConf that will contain ASBU methodology • Refers to five major disciplines – ATM, CNS, MET, AIM and AGA ICAO SIP 2012- ASBU workshop 6 ICAO SIP 2012- ASBU workshop 7 GANP- Contents Global Air Navigation Plan Outline Chapter 1: Current State of Global Air navigation Chapter 2: Global Air Navigation Policy Chapter 3: Standardization – ASBU Block 0 and 1 Chapter 4. Continued R and D – ASBU Blocks 2 and 3 Chapter 5: Implementation Chapter 6: Aviation System Performance Appendix: Roadmaps, Air Navigation Report Form, PIRGs structure All related guidance material for regional planning will be available online linked to Global Plan – Examples: List of Homogenous ATM areas and Major traffic flows, Guidance on Economic, Financial, Organizational and International cooperative aspects, guidance on environmental benefits. ICAO SIP 2012- ASBU workshop 8 PFF re-designated as ANRF SAMPLE TEMPLATE AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE INCREASED INTEROPERABILITY, EFFICIENCY AND CAPACITY THROUGH GROUND-GROUND INTEGRATION (ASBU B0-25) Performance Improvement Area 2: Globally Interoperable Systems and Data – Through Globally Interoperable System Wide Information Management Main Key Performance Areas (KPA) Applicable Access & Equity N Capacity Efficiency Environment Safety Y Y Y N Implementation Progress ASBU B0-25 Elements including baseline 1. ATC system with FDPS functionality and a surveillance data processing system 2. NEW Flight Plan 2012 Implementation Status 3. AIDC 4. AMHS/IPS Implementation Roadblocks Elements including baseline Ground system Implementation Avionics Implementation Procedures Availability Operational Approvals 1. ATC system with FDPS functionality and a surveillance data processing system 2. NEW Flight Plan 2012 3. AIDC 4. AMHS/IPS Remarks, if any ————————— ICAO SIP 2012- ASBU workshop 9 Manage Assess Identify homogenous areas/traffic flows/terminal areas/aerodromes Review National Plans requirements List States/FIRs IDENTIFY GAPS Consider current/foreseen traffic population. ASBUs Elaborate Set Performance Objectives Consider forecasts of average and peak aircraft movements. Survey Aerodrome characteristics, ATM Infrastructure including Human Resource availability Consider civil/military access and SUA requirements Assess costs & revenue parameters Elaborate/refine scenarios Perform/integrate initial CBA/ sensitivity analysis Estimate Estimate new economic parameters Implement Review Start: review user needs (e.g. capacity, delays, routes, etc.) Develop implementation mechanisms Develop consensus with users Amend Regional Plans Develop human resources plan Evaluate acceptance by users Perform implementation tasks Estimate human resources requirements Flow chart for regional and national planning End: Validate and End: Validate and monitor monitor End: Validate and monitor Performance Metrics Air Navigation Reports What is new in the revised Global Plan? International Civil Aviation Organization No 1 Current version Upcoming revised version (Nov 2006) (Nov 2012) Scope covers only ground Scope extends to airspace equipment for ANSPs users and regulators involving Airlines and CAAs 2 P (paper)–based E (electronic)–based ICAO SIP 2012- ASBU workshop What is new in the revised Global Plan? International Civil Aviation Organization No Current version (Nov 2006) Upcoming revised version (Nov 2012) 3 Does not support planning tools for its implementation Detailed guidance available online on the related website 4 Addresses individual improvements through GPIs Addresses a package of improvements through ASBU Modules encompassing all GPIs ICAO SIP 2012- ASBU workshop What is new in the revised Global Plan? International Civil Aviation Organization No 5 6 Current version Upcoming revised version (Nov 2006) (Nov 2012) No individual roadmap for Separate technology roadmaps enablers for C, N, S and IM Aircraft equipage not specified Avionics roadmap included ICAO SIP 2012- ASBU workshop What is new in the revised Global Plan? International Civil Aviation Organization No Current version (Nov 2006) Upcoming revised version (Nov 2012) 9 Global plan was not Global Plan reviewed by presented to Industry forum GANIS 10 Implementation was based on near term and medium terms Implementation is based on near, medium and long terms through Blocks 0, 1, 2 and 3 timeframes ICAO SIP 2012- ASBU workshop What is new in the revised Global Plan? International Civil Aviation Organization No 11 Current version (Nov 2006) Upcoming revised version (Nov 2012) Supported by paper based Supported by web based Regional ANPs Regional ANPs, called eANPs 12 Quantification of fuel savings and corresponding environmental benefits are not available ICAO Fuel Savings Estimation Tool (IFSET) will be a part of the revised global plan ICAO SIP 2012- ASBU workshop What are the policy changes? • Regulators will now be part of regional and national air navigation planning process by supporting required regulatory needs for ASBU modules • Regulator role will be both oversight and support for implementation • Regional agreement for the implementation of ASBUs will be reflected in the respective regional air navigation plans through PIRG process • Nation planning will also follow ASBU methodology thus deriving all benefits for all the entities including regulators • The FASID part of the regional plans is now needed to reflect ground systems, avionics as well as regulatory procedures to implement the respective ASBU modules. This process ensures commitment by all States and ANS partners for the implementation work programme. ICAO SIP 2012- ASBU workshop 16 Revised GANP -International Agreement at AN-Conf/12 • AN-Conf/12 in Montréal, 19-30 November 2012 • Global Air Navigation Plan (Global ANP) revision – Revision 2012; to be released on 30 June 2012 – First Global Air Navigation Report planned for 2014 • Regional Air Navigation Plan (online format known as eANP) revision – 2012 – ICAO is progressing towards development of online version of Regional Plans, called e-ANPs for all the regions and will include ASBU methodology. The Regional e-ANPs will be an online interactive plan with access rights to States, International organizations and Regional offices and will be made available at the AN-Conf/12. ICAO SIP 2012-ASBU workshops 17 Synergies between GANP and GASP Combined Synergies between GANP and Global Aviation Safety Plan (GASP) A 4 page document describes System of systems Explains development of Safety and Air Navigation Reports Informs update process for both GANP and GASP ICAO SIP 2012-ASBU workshops 18 ICAO SIP 2012- ASBU workshop 19