NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND CONTROL STATUS IN CZECH REPUBLIC AND RECOMMENDATIONS TO IAEA JIRI PLISKA I&С ENERGO Technical Working Group on.
Download ReportTranscript NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND CONTROL STATUS IN CZECH REPUBLIC AND RECOMMENDATIONS TO IAEA JIRI PLISKA I&С ENERGO Technical Working Group on.
NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND CONTROL STATUS IN CZECH REPUBLIC AND RECOMMENDATIONS TO IAEA JIRI PLISKA I&С ENERGO Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 CONTENT Major projects at the NPP Dukovany and NPP Temelin I&С system refurbishment project at the NPP Dukovany Other I&С projects at the NPP Dukovany Recommendation to IAEA www.ic-energo.eu 2 Main projects NPP Dukovany – two important and closely interlinked longterm projects of large scale: 16 TERA safely; to achieve yearly production of 16 TWh by 2013 Long Time Operation (LTO); to operate NPP beyond the designed service life term = 2015 it means to 2025 or 2035 or 2045 NPP Temelin 15 TERA safely; to achieve yearly production of 15 TWh by 2012 All of those projects incorporate a number of partial projects and They are a part of a general business plan of the ČEZ – Reduction of emissions and increase in efficiency www.ic-energo.eu 3 16 TERA Safely The main goal of the project is an increase in efficiency and power output – to achieve yearly production of 16 TWh by 2013 and to maintain it for at least 20 years by utilization: reserves of NPP Dukovany original project, experience of personnel with the management of outage on condition that the nuclear power plant retains its place among the best rated nuclear plants in the world, especially in the field of safety and operation indicators. Project involves a number of partial projects aimed at increasing the output and production by means of equipment modernization, reduction of outage time and improvements in Load Factor (LF) These partial projects are incorporated under a single umbrella project. www.ic-energo.eu 4 16 TERA Safely (continue) The project partial goals involve: an increase in output of the individual blocks to 500 MWe, a reduction of outages by 35 days a year on average The modifications to equipment include mainly: a replacement of the LP parts of the turbines a replacement of the HP parts of the turbines a modernization of the block transformers and the transformer monitoring system a modification of the generator stators changes of algorithms I&C M1, M2 an upgrade of the core surveillance system Scorpio www.ic-energo.eu 5 ARCHITECTURE OVERVIEW Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization RSB B/N new cabinet (Alert and inform indication) PPR1 Ac RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) I&C project involves those unit control systems : •RSBP – Primary circuit systems and equipment part (M3) •RSBT – Turbine part (M4) •RSBS – Secondary circuit systems and equipment part (M5) •IS DIAG – diagnostic and information system for M345 •MCR / ECR – corresponding modifications to the main PPR2 PPR3 PPRN control rooms and emergency control rooms DIAG new cabinet S HMI RSBT Nonoperative part of MCR workstation DIAG RSBP new cabinet MOV Conventional HMI RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac S S Ac RSBS new cabinet S RSBT modified cabinet Ac RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBT new cabinet (Room 341) RSBS new cabinet S Ac S Ac S S www.ic-energo.eu S S Turbine hydraulics 6 ARCHITECTURE OVERVIEW Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N DIAG new cabinet PPR1 RSBP new cabinet S Ac RSB B/N B/N RSBT new cabinet Platforms,new Safety CRSB (,cabinet N): cabinet category A, B, new new cabinet (Balance-of-plant (Alert and inform indication) (Primary system)system ZAT–RA, (Room 341) HW for Technological level (A) – Automating system) HW for Technological level (B) – Automating system ZAT–PRIMIS, HW for Technological level (C) – Automating system ZAT–DV, HW for Process level (C) – Automating system ZAT–FS with computer stations and servers of industrial design, HW for Operator (HSI) level (C) – Automating system ZAT–FS with computer PPR3 PPRN stations of industrialPPR2 design, SW for Technological level (B) – Operating system OS–9000 and applications for creating, managing and maintaining of projects PERTINAX IDE, SW for Process level (C) – Operating system MSW/XP and a highperformance industrial RSBP computer (VS) with computing modules, RSBS RSBT RSBSserver RSBT RSBP RSBS RSBP RSBS new modified new new modified new new new new SW forcabinet Operator (HMI)cabinet level (C) – Operating system MSW/XP andcabinet MS SQL cabinet cabinet cabinet cabinet cabinet cabinet server, Wonderware InTouch and Wonderware Industrial SQL server. S S Ac S S Ac S Ac S Ac S Ac S Ac S Ac S Ac S S www.ic-energo.eu S S Turbine hydraulics 7 ARCHITECTURE OVERVIEW Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization RSB B/N new cabinet Concept: (Alert and inform indication) PPR1 PPR2 Ac RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) Concept maintains the existing concept of division into three mutually independent systems (divisions), non-system, MCR, ECR DIAG new cabinet S HMI RSBT Nonoperative part of MCR workstation DIAG RSBP new cabinet MOV Conventional HMI RSBS new cabinet S RSBT modified cabinet PPR3 RSBP new cabinet S Ac S S RSBT new cabinet (Room 341) Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S Ac S S www.ic-energo.eu S S Turbine hydraulics 8 ARCHITECTURE OVERVIEW Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet Disposition, Function: (Alert and inform indication) RSB B/N new cabinet (Primary system) Disposition of new systems remain the one DIAG new cabinet RSB B/N new cabinet (Balance-of-plant same in system) comparison RSBT new cabinet (Room 341) to current Scope of functions is maintained with an exception: - new turbine regulation (shift of the limit between the electric and hydraulic part of the turbine regulation) PPR2 PPR3 PPRN - self-diagnostics - periodic testing PPR1 RSBP new cabinet S MOV Conventional HMI Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac S S Ac RSBS new cabinet S RSBT modified cabinet Ac RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S Ac S S www.ic-energo.eu S S Turbine hydraulics 9 ARCHITECTURE OVERVIEW Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 RSBP new cabinet S Ac RSBS new cabinet S Communication: PPR2 PPR3 PPRN •deterministic, independent on technology state communication •redundant optical ring for safety category B •redundant optical ring for safety category C •SDL from category system RSBS of lower RSBT RSBPsystem RSBSof higher RSBT safety RSBP RSBS to the RSBP modified new new modified new new new new category cabinet cabinet cabinet cabinet cabinet cabinet cabinet cabinet S Ac S S Ac S Ac S Ac S Ac S Ac S Ac S Ac S S www.ic-energo.eu S S Turbine hydraulics 10 M345 Refurbishment (continue) Schedule: •2009 •2010 •2011 •Unit •B1 •Unit •B4 - short outage www.ic-energo.eu •Unit •B2 •Unit •B3 •2012 •2013 •2014 •2015 •Number of shutdow ns 3+2 3+1 3+2 3+2 - long outage 11 Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac 1st OUTAGE Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac 2nd OUTAGE Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac 3rd OUTAGE Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac 4th OUTAGE Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac 5th OUTAGE Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac FINAL Main Control Room / Emergency Control Room Workstation DIAG Alert indication / Alarm Inform indication PCS Signalization MOV Conventional HMI HMI RSBT Nonoperative part of MCR workstation DIAG RSB B/N new cabinet (Alert and inform indication) RSB B/N new cabinet (Balance-of-plant system) RSB B/N new cabinet (Primary system) RSBT new cabinet (Room 341) DIAG new cabinet PPR1 PPR2 RSBP new cabinet S Ac RSBS new cabinet S RSBT modified cabinet RSBP new cabinet S Ac PPR3 S S Ac RSBS new cabinet S RSBT modified cabinet Ac PPRN RSBP new cabinet S Ac RSBS new cabinet S Ac RSBP new cabinet S Ac RSBS new cabinet S Ac S S S S S Turbine hydraulics Ac Others I&С projects at NPP Dukovany Cabling management system Transformer monitoring system On-line monitoring system SCORPIO system modernization www.ic-energo.eu 19 Recommendation to IAEA Cabling management system Topic Common language for unified description of complex cabling systems. Motivation Cabling system belongs to the critical subsystems of NPPs. It covers both electric systems and I&C systems. Goal To create a common language for unified description of complex cabling systems using the ISO 15926 approach and principles. (Generic Data Model and Reference Data Library) www.ic-energo.eu 20 Recommendation to IAEA (continue) Measurement reliability and accuracy Topic Measurement reliability and accuracy enhancement Motivation Measurement reliability and accuracy is a permanent and serious requirement of I&C system functions to ensure safety, reliability and economic goals of NPP operators Goal To elaborate an analysis of available methods based on advanced data processing and process simulation and designed to improve measurement reliability and accuracy. On the basis on this analysis to give recommendation and guideline for using these methods to operators, regulators and vendors www.ic-energo.eu 21 Thanks for attention Jiri PLISKA telefon: +420 602 723 934 e-mail: [email protected] www.ic-energo.eu