Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL September 15, 2008
Download ReportTranscript Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL September 15, 2008
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL September 15, 2008 Status (1) • MZ, MAG, and SV visited vendor on Friday, Sept. 12 • Discussed options and agreed upon plan to move forward — complete magnet 2 first, then open magnet 1 and fix it — modifications to include o improved thermal connection between stage 1 of coolers and shield o improved design of liquid He piping to minimize risk of frozen nitrogen plug – enter cold mass vessel from 7 o’clock position (now it is 6 o’clock) – enlarge He tubes to 0.5-in. – redesign manifold to eliminate low spots o generate written cool-down procedure o modify stand to eliminate interference with iron disk bracket – favored approach will make magnet stands for magnets 1 and 2 have different positions is this an issue for interface with false floor? September 15, 2008 MICO: Zisman 2 Status (2) • Magnet 1 will subsequently get the same modifications — will also correct alignment errors when magnet is opened up • Schedule — aim for completing magnet 2 by early November o somewhat skeptical that this will happen on time — magnet 1 should be ready about 2 months after magnet 2 • Implications of schedule — it does not seem likely that magnet 2 could be run at RAL before the end of the year even if we skip magnetic measurements at FNAL o unless we can shorten the 6-week preparation time by several weeks – this potentially leads to resource conflicts with decay solenoid repair if that cannot be accomplished in October — Executive Board needs to decide priorities September 15, 2008 MICO: Zisman 3 Commissioning Needs (1) • Need to get Decay Solenoid power supply operating — and then begin tests of magnet o use signs and barricades if no indicator light — need DL help for this — potential to interfere with DSA roof job if we’re not careful o could do off-hours after PSU is fully operable • Need to develop optics for electron beam (Tilley, Apollonio) — used for calibrating CKOV and TOFs o must extend all the way past Q9 (i.e., into the Hall) • Need to extend permission to operate target parasitically during ISIS user run September 15, 2008 MICO: Zisman 4 Commissioning Needs (2) • Need to make beam loss measurements to compare with model calculations (Adams, Dobbs) — also need extended run at “enhanced” loss rates to determine activation effects of a given instantaneous loss rate • Need to test MBS once installed — logic of interlock to ISIS needs definition o maybe already done (?) • Need to incorporate key ISIS BLMs and BPMs into MICE target data stream — and eventually into DAQ stream — cables are available, but need to be connected on both ends September 15, 2008 MICO: Zisman 5 Issues • Need suitable lock-off on DS PSU (safety issue) ...hope springs eternal o ideally, should look the same as the other big PSUs • Need network access to e-log from RAL-VIS network — Gareth Smith (PPD) trying to get this sorted out — this is a real pain and MUST get fixed soon! • Need to decide how to proceed with off-line target — best guess: magnetic and mechanical axes are misaligned o need to confirm this or find another explanation – it is clear that we still do not have sufficient understanding of target requirements • Need to resolve need to lock Hall when target operating and MBS is closed September 15, 2008 MICO: Zisman 6