International Civil Aviation Organization Block 1 Overview Rubén Oscar González Air Navigation Commissioner International Civil Aviation Organization.
Download ReportTranscript International Civil Aviation Organization Block 1 Overview Rubén Oscar González Air Navigation Commissioner International Civil Aviation Organization.
International Civil Aviation Organization Block 1 Overview Rubén Oscar González Air Navigation Commissioner International Civil Aviation Organization Block 1 Overview Performance Improvement Areas Block 0 Block 1 Block 2 Block 3 (2013) (2018) (2023) (2028 & >) Airport Operations Globally Interoperable Systems and Data Optimum Capacity and Flexible Flights Efficient Flight Path Preparatory Workshop for AN-Conf/12 2 Block 1 – PIAs and Modules • 4 Main Performance improvement areas – Airport operations (6 modules) – Globally interoperable systems & data (4 modules) – Optimum capacity & flexible flights (4 modules) – Efficient flight path (3 modules) • Block 1 will serve as the enabler and foundation for the envisioned future aviation systems. Preparatory Workshop for AN-Conf/12 3 Block Maturity Lifecycle **** Planning Decisions based on business case and validation results as developed during the previous phase B3 B2 SIMPLIFIED LIFECYCLE V0 2018 Identification of Needs V1 V1 Concept Definition V2 V2 R&D B0 Feasibility V3 V3 Pre-Industrial Development and Integration V4 V4 Implementation Industrialisation V5 V5 Decision Operations B1 Deployment V6 V6 Decision Operations V7 V7 Decision Decommissioning Decision Standardisation activities IOC Initial Operational Capability Block 1 will see critical ANSP capabilities synchronized. Preparatory Workshop for AN-Conf/12 4 Block 1 Across the Phases of Flight Performance Improvement Areas Airport Operations Globally Interoperable Systems and Data Optimum Capacity and Flexible Flights Efficient Flight Path B1-30 - Service Improvement through Integration of all Digital ATM Information B1-105 – Enhanced Operational Decisions through Integrated Meteorological Information (Planning & Near-term Service) B1-31 - Performance Improvement through the application of System Wide Information Management (SWIM) B1-35 - Enhanced Flow Performance through Network Operational Planning B1-40 - Improved Traffic ToC B1-15 - Improved Airport Operations through Departure, Surface and Arrival Management Synchronisation and Initial Trajectory-Based Operation B1-85 - Increased Capacity & Efficiency through Interval Management B1-102 – Ground-Based Safety Nets on Approach ToD B1-10 - Improved Operations through Free Routing B1-90 - Initial Integration of Remotely B1-05 - Improved Flexibility & Efficiency in Descent Profiles (OPDs) B1-65 - Optimised Airport Accessibility CTA Piloted Aircraft (RPA) Systems into Nonsegregated Airspace B1-80 - Optimised Airport Operations through A-CDM Total Airport Management B1-25 - Increased Interoperability, Efficiency & Capacity though FF-ICE/1 application before Departure B1-70 - Increased Runway Throughput through Dynamic Wake Turbulence Separation B1-81 - Remotely Operated Aerodrome Control Management B1-75 - Enhanced Safety & Efficiency of Surface Operations Preparatory Workshop for AN-Conf/12 5 B1-15 – - Improved Approach & Departure Management through Integration B1-15 - Improved Airport Operations through Departure, Surface and Arrival Management B0-15 B1-15 Preparatory Workshop for AN-Conf/12 6 B1-70 Increased Runway Throughput through Dynamic Wake Turbulence Separation B1-70 - Increased Runway Throughput through Dynamic Wake Turbulence Separation B1-70 B2-70 Preparatory Workshop for AN-Conf/12 7 B1-70 Increased Runway Throughput through Dynamic Wake Turbulence Separation • Wake vortex separation can be reduced under certain crosswind conditions. This upgrade requires: Tactical Wind Prediction and Monitor function (for next departure) Strategic Weather function (for planning horizon) Stability of operation to ensure usability/reliability Mid Term (Block I) > 150 Meters < 760 Meters Preparatory Workshop for AN-Conf/12 8 B1-30 Service Improvement through Integration of all Digital ATM Information B1-30 - Service Improvement through Integration of all Digital ATM Information B1-80 B0-30 B1-30 B2-31 B1-31 B2-35 Preparatory Workshop for AN-Conf/12 9 B1-105 - Enhanced Operational Decisions through Integrated Meteorological Information (Planning and Near-Term Service) B1-105 - Enhanced Operational Decisions through Integrated Meteorological Information (Planning and Near-term Service) B2-31 B1-105 B3-105 Preparatory Workshop for AN-Conf/12 10 B1-05 - Improved Flexibility & Efficiency in Descent Profiles (OPDs) B1-05 - Improved Flexibility & Efficiency in Descent Profiles (OPDs) B1-5 B3-5 Preparatory Workshop for AN-Conf/12 11 Challenges - How to Get There? • Budget considerations are greater for Block 1 since these modules do involve technology insertion in either ground/air or both. • Block 1 has a strong dependency on moving to network based communications for aviation. • There are regional synchronization issues of equipage and capabilities to achieve much of Block 1. This is essential to the successful implementation to the future Blocks. – Global standards can alleviate such risks and ensure interoperability between regional ANSPs. Global standards also offers stakeholders a common rubric. Preparatory Workshop for AN-Conf/12 12 13