07/11/2015 “Single European Sky: the time for action“, 11-2 October Limassol, Cyprus. Towards the SESAR deployment and the ATM system modernisation Presented by Marc HAMY Airbus.
Download ReportTranscript 07/11/2015 “Single European Sky: the time for action“, 11-2 October Limassol, Cyprus. Towards the SESAR deployment and the ATM system modernisation Presented by Marc HAMY Airbus.
07/11/2015 “Single European Sky: the time for action“, 11-2 October Limassol, Cyprus. Towards the SESAR deployment and the ATM system modernisation Presented by Marc HAMY Airbus ProSky COO September 2011 The objectives of the ATM system Modernisation The existing system is no able to deliver more performance Costs in € for en routes services for 100 km/flight (PRR 2011 figures). 140 Few improvements in the global ATM performance between 2004 and 2010 120 100 80 60 40 20 Cost of en route delays Cost of route extensions Cost for ANSP services 0 NB : Unit costs of ANSP are slowly decreasing but cost of inefficiencies (delays and route extensions) are still increasing the cost of ANS services of near 50% (3€Bn added to 6.5€Bn). © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. 1€Bn a year 2€Bn a year 6.5€Bn a year Similar situation for air navigation services around airports Costs in M€ for one year. 4500 Airport ATFM delays 4000 3500 3000 Inefficiency cost for Arrival holding and sequencing inefficiency cost taxi-out 2500 2000 1500 1000 Terminal ANS provision cost 500 0 2008 2009 2010 2011 NB : The cost of ATM inefficiencies around airports is 2.3 €Bn when when the cost for ANS provision is 1.5 €Bn. © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. 550 €M a year 950 €M a year 850 €M a year 1.5 €Bn a year There is a need for a structural change On the organization of ATM infrastructure and Air Navigation Services Provision (Defragmentation objective of the Single European Sky) On technologies and operational concepts. This is the objective of SESAR; But also of NEXTGEN And of the Aviation System Blocks Upgrade (ICAO) This is part of a global “ATM transformation process” at world level © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. The objectives of the ATM system modernization Enhance safety: With better surveillance systems (Mode S, ADS-B, etc.); With better traffic situation awareness (ATSAW, ATSA-SURF, etc.); With advanced anti-collision systems (AMGCS, MTCD, T-CAS, ASAS, etc.); With advanced landing systems (GBAS, SBAS, ROW, ROPS, etc); With digital communication systems (FANS, ATN B2) enhancing reliability of data and information exchanges. Enhance capacity : With enhanced navigation systems allowing reduced separations (RNP, ITP); With new systems increasing the airport throughput (AMAN, SMAN, DMAN); With time based or trajectory based operations allowing better sequencing; With enhanced ATFM and A-CDM systems. Reduce cost of air navigation services: Most standardized and lower cost CNS systems (ADS-B replacing radars); Greater automation giving more productivity to the ATC services. Enhance flight efficiency: Reduce fuel burn and CO² emissions with Performance based navigation (PBN) and trajectory based operations (TBO); Reduce noise around airports with generalization of RNP and CDAs. © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. Very ambitious objectives for the SESAR program Multiply safety level of air traffic in Europe by 10 Multiply capacity by 2 or 3. Reduce unit costs of 50%. Improve flight efficiency of 10%. © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. September 2011 Where are we? Very ambitious objectives for the SESAR program Definition phase achieved Development phase well advanced 2,1 €Bn engaged, more than 2000 people working on it, main ANSP, Airports, Airlines and manufacturing industries contributing. Very encouraging results. Deployment phase in preparation. © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. 11/7/2015 Encouraging flight tests, confirming the potential benefits of these new technologies • First i4D flight in the world operated on 10th February from Toulouse to Copenhagen and Stockholm to testing successfully data link systems and a targeted time of arrival with a precision of a few seconds. • AIRE green flights: up to 1 ton of fuel saving on Transatlantic flights (3-5 tons of C0²). • MINT: Minimum CO² in Terminal area project. Benefits demonstrated by MINT: • 500 Kg CO² savings per landing • 145Kg fuel savings per landing • Noise problems were reduced by 50% • Lateral navigation precision of flight of the aircraft was excellent • More than 10 flight trials and demonstrations with revenue flights to test data-link, time based operations, free routing, etc. Page 10 © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. September 2011 Airborne validated technologies ICAO GANIS September 22nd, 2011 Enhancing Safety High Energy Approach Monitoring Runway Overrun Warning (ROW) Runway Approaching Overrun Protection Runway Advisory (ROP) Securing (ARA) / Monitoring Takeoff (TOS / TOM) Reduces risksStop of over-energy Go around minded minded Runway incursion prevention Prevent landing on wrong runway Reduce risks of runway overrun, tailstrike, takeoff from wrong runway or taxiway Arrival Taxi Departure 500ft T.O RWY TOO SHORT 1000ft 50ft HEAM BTV ROW ROP Page 12 © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. ARA TOS / TOM ICAO GANIS September 22nd, 2011 Eco-Efficiency from Gate to Gate Continuous Descent Approach (CDA) In Trail Procedures Automated Noise Abatement Required Navigation Performance: Departure Procedure (NADP) Lower fuel efficient burn andthan emissions (shorter tracks) More radar vectoring More efficient cruise levels NoiseLower reduction: populated noiseAvoidance & fuel burnofas requires areas Adaptation of take-off profile reduces less thrust noise over local community areas Departure En-Route Arrival Taxi less noise GPS Landing System Achieved: CAT I with SLS or Auto Land Optimized Flight Level Next With step: ITP CAT II / III CDA NADP Air-Ground Communication with FANS A or B Continuous Climb GLS RNP Engine off Page 13 © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. September 2011 Critical issues for the SESAR deployment phase European Commission proposals • • Instrument ATM Master Plan Guidance material Content Essential operational changes Governance structure Common projects definition Incentives definition • Pilot common project Deadlines October 2012 June 2013 Selection of implementation objectives Business view, including demonstration of a positive CBA Associated safety and regulatory measures Associated incentives not later than end 2013 • Deployment programme • Deployment manager • Project view of the pilot common project Specification for the implementation projects needed to deploy the pilot common project mid 2014 mid 2014 Implementations projects Industrial consortium to execute and manage the deployment programme and report to the political level Contracts to implement under the coordination of the deployment manager end 2014 A clear definition of the institutional framework and timescale But still some key issues pending © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. Key pending issues Business case. SESAR deployment is expected to deliver important cost savings (35 €Bn fuel savings) to the airlines between 2013 and 2030. But SESAR require also important investments and the business view of the ATM Master plan is not sufficient to convince the airspace users to invest in deployment. And manufacturers will not launch the production of the new equipments if their customers are not asking for it. Composition and responsibilities of the deployment manager. Respective role and responsibilities of ANSP, Airport, Airspace users, and manufacturing industry (to coordinate industrialization and implementation). Accountability of the deployment manager on the execution of the deployment program? Funding and incentives mechanisms. Given economic downturn stakeholders finances are fragile and self-financing for SESAR equipment will not be possible Therefore a mechanism to provide financing to investors in SESAR deployment is necessary; Incentives are also necessary to encourage stakeholders to make timely investments ; The 3 €Bn proposed by the EC is considered as a minimum as it represents only10% of the total investment. © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document. CONCLUSIONS More than 800 million passengers are transported by air every year in Europe. It is estimated the air transport sector provides 8.7 million jobs and contributes €700 Billion in GDP across Europe. The European aviation sector is a major driver of economic growth for the European Union (EU) and the air traffic is expected to double in the 20 coming years. To support such growth in a safe and sustainable manner a seamless and modern air transport system is required. This is the objective of the Single European Sky (SES) initiative and SESAR is a key pillar of this initiative with ambitious high-level goals to achieve by 2020. SESAR is also necessary to give a leadership to Europe in the ongoing ATM modernization process at world level and to maintain the competitiveness of its aviation industry. The SESAR development phase has demonstrated the technology is now ready for deployment. European Commission has defined a clear institutional framework and timescale for SESAR deployment. But to be successful SESAR deployment requires the commitment of all the main actors of the ATM system in Europe : ANSP, Airports, Airspace users, and manufacturing industries. This commitment would not be possible without a consolidated business case and without a strong funding and incentives mechanism to support and synchronize the investments needed. © AIRBUS ProSky SAS. All rights reserved. Confidential and proprietary document.