RIPE NCC Update Axel Pawlik . APNIC 16, 22 August, Seoul . http://www.ripe.net in the Netherlands and lage Droogte“Dried in Nederland en record record low water positions” waterstanden • (links) In de ochtenduren.

Download Report

Transcript RIPE NCC Update Axel Pawlik . APNIC 16, 22 August, Seoul . http://www.ripe.net in the Netherlands and lage Droogte“Dried in Nederland en record record low water positions” waterstanden • (links) In de ochtenduren.

RIPE NCC Update
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
1
http://www.ripe.net
in the Netherlands
and lage
Droogte“Dried
in Nederland
en record
record
low water positions”
waterstanden
• (links) In de ochtenduren van 17 augustus bereikte de waterstand in de
Rijn een historisch dieptepunt. Bij Lobith werd 7,17 meter boven NAP
gemeten. Het oude record was 7,22 meter op 13 september 1991. De
lage waterstanden in de grote rivieren worden slechts voor een klein
deel bepaald door de actuele droog in Nederland, maar wordt vooral
bepaald door de neerslag in de stroomgebieden van de rivieren. De
droogte in Zuid-Europa past in de computerverwachtingen van het
toekomstig klimaat. In het veranderende klimaat neemt hier de kans op
zomerdroogte toe. Uit de metingen van de laatste jaren blijkt dat nog
niet maar volgens de prognoses voor Zuid-Europa wordt niet alleen
een toename verwacht van zware neerslag maar ook een afname van
de zomerneerslag van mogelijk 20%. (zie ook watertekorten in waterrijk
Nederland en de droogtestudie)
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
2
http://www.ripe.net
Who Is Who
An Organisational Update
Executive Board
Chief Scientist
Managing Director
CFO
Axel Pawlik
CTO
.
APNIC 16, 22 August, Seoul
Head Member Services
.
3
http://www.ripe.net
Registration Services
• Steady response time to resource
requests
– 2 days or less for last year
• Improving resolution times
– 90% within 8 days
• Telephone contact
– Call back service
– Proactive telephone calls
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
4
http://www.ripe.net
Policy Update
• New Address Policy WG
– LIR-WG split into 2 new WGs and mailing lists
• Updated IPv4 document (draft)
– http://www.ripe.net/ripe/draft-documents/ipv4policies.html
• Update to “status:” attribute (values)
– http://www.ripe.net/ripe/draft-documents/statusattributes.html
– Will develop proposal in co-operation with APNIC
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
5
http://www.ripe.net
LIR Portal
• Membership service
• Simplified resource request forms
– Calculating forms
– Interactive help function
• Allocation Editor
– Lets LIRs update allocation inetnum objects directly
• PKI login
– Secure certificate
• Tools
– Useful utilities
https://lirportal.ripe.net/
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
6
http://www.ripe.net
k Root Developments
• AMS-IX instance of k.root-servers.net online
– Proof of concept complete
– Marks the beginning of anycast k root service
• Investigating next phase
– Deployment of more instances
• k.root-servers.org website updated with more
routing policy information
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
7
http://www.ripe.net
Membership Liaison
• Membership Liaison Officer responsibilities:
– Liaison activities and regional support for RIPE NCC members
– Developing communication channels for member feedback
– Improving interaction between RIPE NCC and members
• Projects:
– RIPE NCC regional meeting in the Middle East
• Dubai, UAE, 7-9 December 2003
– Actively seek input from members
• <[email protected]>
– Support for RIPE NCC Services WG & RIPE Meetings
– Collaboration with RIRs on membership issues
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
8
http://www.ripe.net
Information Services
• RIPE NCC has been collecting data since its
inception
– Hostcount, TTM, RIS, …
• 10 years, time to revisit and adjust direction
• Strategy paper: RIPE 271, “RIPE NCC Hostcount
in the 21st century”:
– Measurements are necessary for long and short term
operations
– RIPE NCC is ideally suited to do them
– Results should be made public
– Results should be easy to use in daily operations
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
9
http://www.ripe.net
Changes in the coming months
• Central entry point for all statistics maintained by
the RIPE NCC
– Uniform data formats
– Consistent
•
•
•
•
myASN feature added to the RIS
TTM will become an open service
DNS monitoring added
Incident response procedure and team
Suggestions and ideas: [email protected]
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
10
http://www.ripe.net
X.509 for RIPE NCC LIRs
• LIRs get client certificates from LIR Portal
• LIR Portal login with certificate
• Database updates pending
– S/MIME e-mail update authentication
– SSL synchronous and web update authentication
• Wizard for adding X.509 auth to mntners coming
• Interaction with RIPE NCC hostmasters Q4 2003
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
11
http://www.ripe.net
RIPE Database Developments
• New update program
– Improved acknowledgment messages
• Unreferenced person object auto-cleanup in place
– Began 29 May 2003
– Steady deletions, drop from 300k to 200k objects
• RPSLng (RPSL for IPv6 and multicast)
– Prototypes running, not yet IETF standard
– Client and server source code also available
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
12
http://www.ripe.net
Association News
• Membership developments surpassing expectations
• Increase number of Billing Categories
– XS, S, M, L, XL
• AoA changes proposed
– To increase flexibility
– Voting rights
• GM at RIPE 46
• Budget 2004
– Stable
– FTE stable at ~ 93, less than budgeted for 2003,
increasing services / service levels
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
13
http://www.ripe.net
RIPE 46
• Amsterdam, 1-5 September
Axel Pawlik
.
APNIC 16, 22 August, Seoul
.
14
http://www.ripe.net