ATF2 S.Kuroda( KEK ) Introduction to ATF2 Project Hardware Status Software Status Commissioning of ATF2 Future Plan.

Download Report

Transcript ATF2 S.Kuroda( KEK ) Introduction to ATF2 Project Hardware Status Software Status Commissioning of ATF2 Future Plan.

ATF2
S.Kuroda( KEK )
Introduction to ATF2 Project
Hardware Status
Software Status
Commissioning of ATF2
Future Plan
Introduction to ATF2 Project
LC final focus test beam line at KEK-ATF
Reference: ATF2 proposal, KEK report 2005-2, 9
Home page: http://atf.kek.jp/collab/ap/projects/ATF2/index.php
Phase1.( to be done by 2010 )
Goal: Achievement of small beam size as ~35nm, and
maintaining it for a long time.
Requirement: y=310-8m in DR
Phase2.
Goal: Stabilization of beam position within a few nm.
Requirement: High resolution BPM & FB
Fast Kicker(FK) for ILC-like bunch structure
Experimental Test of Beam
Delivery System( BDS )
FFTB( SLAC ) 1994
Traditional chromaticity correction scheme
( SX pairs with -I transfer matrix in between ).
Beam size of 70nm observed for several hours.
ATF2
Local chromaticity correction scheme
( miniature of ILC design ).
International collaboration in construction & operation
( also similar to ILC )
ATF2 Design
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç…ÇÕïKóvÇ­Ç•
ÅB
ATF2 Design( 2 )
Parameters at Focus Point( IP )
*x/y = 4mm/100um
L* = 1m
*y=0, *y’=0.139
DR
diagnostic section
Dog Leg
coupling
double kicker
correction
dispersion correction section
New EXT
IP
matching section
e Beam 
Final Focus System
Recent Status of ATF2 Beam
Line in KEK
2007 Jun.-Sep. : ATF2 floor refurbishment
2008 Jan.
: Start of FFS magnets installation
May
: Start cabling, piping, PS installation,…
Jun.
: Start reconstruction of EXT
Formation of international software group
Formation of commissioning team
Aug.
: Start magnet alignment
BSM tuning on site
Sep.
: Installation of Final Doublet(FD) system
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈǞǽ Ç…ÇÕïKóvÇ­ Ç•
ÅB
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
ATF2 Floor
Refurbishment
2007/10
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈǞǽ Ç…ÇÕïKóvÇ­Ç•
ÅB
2007/12
Installation in FFS
QBPM
Q magnet
(KEK,SLAC,I
HEP)
(Cavity
BPM)
(KEK,PAL)
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
QBPM
electronic
s
(SLAC)
Concrete Base
Stand (KEK)
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
Reconstruction of EXT
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç…ÇÕïKóvÇ­Ç•
ÅB
Magnet Alignment
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç…ÇÕïKóvÇ­Ç•
ÅB
Final Doublet in Beam Line
Final Qs on LAPP
table in beam line
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
Final Q: Modified
FFTB Q
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
SX with watercooled coil
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
Beam Size Monitor at IP
Tokyo University Group
Beam size monitor in
beam line
Phase stabilization is still to be
studied.
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
Remote Participation to Beam
Study
This is important not only for ATF2 but also all the
study of ATF in international collaboration.
This is NOT ‘remote control’,
but just dedicated to the work,
s.t data taking, analysis,…
Tools: WebEx, Skype, Spy
camera in ATF control room,…
eg.) Shift participation
from SLAC
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
Formation of International
Software Group
Hardware Direct
Beam T uning Direct
Project T itle
Contributing Institutes
Y.Renier
EXT Orbit Corr./FB
SLAC,KEK,LAL,CI, JAIVH
FFS Orbit Corr./FB
SLAC,KEK,LAL,CI, JAIVH
IP FB( Pulse-Pulse)
LAL, JAI
H+L
C&S-Band Cav.BPM IOC Dev.
JAI,UCL
VH
S.Booget
IP Cav.BPM
KEK
M
Y.Honda
Magnet Mover IOC Dev.
SLAC
M/H
J.Nelson
EPICS Interface for WS/etc
JAI(LW?)
M/H
Software Interface for IP BSM
T okyo
M/H
Y.Kamiya
Bunch-Bunch IP FB(Intra-Pulse)
JAI
M
P.Burrows
Controls Infrastructure Dev.
JAI,SLAC,KEK
M(Ongoing) N.T erunuma
EXT Bunch-Bunch FB
JAI,Oxford
L/M
Project T itle
Contributing Institutes
Priority
Leader
Coupling Mea.&Corr. in EXT
KEK,SLAC,LAL,CI
VH
C.Rimbault
Dispersion Mea.&Corr. In EXT
KEK,SLAC,CI
VH
J.Jones
EXT Beta-Matching
SLAC, KEK,CI,LAL
VH
K.Kubo
EXT Orbit Corr./FB
SLAC,KEK,LAL,CI, JAI
VH
FFS Orbit Corr./FB
SLAC,KEK,LAL,CI, JAI
VH
A.Scarfe
Beam Line Modeling T ools
SLAC,CI
M
S.Molloy
IP FB( Pulse-Pulse)
LAL, JAI
H+L
Y.Renier
FB Integration
SLAC, JAI
H
J.R.Lopez
IP Waist&Beta adjustment
LAL(IHEP),CI
H
S.Bai
Non-Mover-Based BBA(EXT )
KEK,LAPP
H
T .Okugi
Mover-Based BBA(FFS)
SLAC,KEK,LAPP
H
J.Nelson
Final IP Spot-Size T uning
SLAC,KEK,LAL,T okyo,CERN,CI
M/H
G.White
Bunch-Bunch IP FB(Intra-Pulse) JAI
M
J.R.Lopez
FS Core Software Dev.
SLAC
M(Ongoing)G.White
EXT Bunch-Bunch FB
JAI,Oxford
L/M
J.R.Lopez
EPICS Readout of Fiber-PLIC
PS IOC Dev.
Integrated Automated T uning
SLAC
L
G.White
Priority
L
SLAC
L
Leader
P.Burrows
Present Status of Software R&D
Hardware direct software
EPICS interface: ready
Movers, Magnet PS, BPM
Better to consider unified display,…
Generally going on well
High-priority beam tuning software
Coupling correction
Dispersion correction
Orbit correction
Beta matching
Generally going on well with simulation
Flight Simulator
Tool to simulate ATF
control system for software
authors offsite.
Going on well.
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈǞǽ Ç…ÇÕïKóvÇ­Ç•
ÅB
Simulation of IP
Spot-Size
Tuning
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇžÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
G.White
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
Considered errors in the left table
eg.) magnet x/y alignment error: 200um
magnet roll error: 300urad
field error: 1e-4
…….
And ground motion(GM) of ATF-fitted
model
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇžÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
Need more study with
simulated BSM response
and countermeasure for
multi-pole component effect
of FD.
Simulation of IP
Spot-Size
Tuning( 2 )
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇ žÇ½Ç…ÇÕïKóvÇ­Ç•
ÅB
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇžÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
R.Thomas
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈǞǽDžÇÕïKóvÇ­ Ç•
ÅB
Study for
Lower Beta*
- Proposed Future
Study -
ATF2 Commissioning
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈÇ žÇ½Ç …ÇÕïKóvÇ­Ç•
ÅB
Commissioning Schedule
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾ å©ÇÈǞǽ Ç…ÇÕïKóvÇ­Ç•
ÅB
Future Plan
QuickTimeý Dz
TIFF (LZW) êLí£ÉvÉçÉOÉâÉÄ
ǙDZÇÃÉsÉNÉ`ÉÉǾå©ÇÈÇž ǽDžÇÕïKóvÇ­Ç•
ÅB
T.Tauchi
Summary
Progress as of Sep. 2008
Hardware
1. ATF2 floor and shield
2. Magnet installation in ATF2 FFS line
3. Reconfiguration of EXT
4. Piping, cabling, PS installation, BPM electronics tuning
5. Magnet alignment
6. BSM tuning
7. FD system installation
Software
1. Group formation
2. R&D and simulation study for hardware-direct and
beam-tuning software are going on well
Commissioning will start Nov. 2008. Goal of phase1 will be
achieved by 2010.