MUON TARGET PARTICLE PRODUCTION STUDY: TAPERED FIELD PROFILE HISHAM KAMAL SAYED Physics Department Brookhaven National Lab July 3, 2012
Download ReportTranscript MUON TARGET PARTICLE PRODUCTION STUDY: TAPERED FIELD PROFILE HISHAM KAMAL SAYED Physics Department Brookhaven National Lab July 3, 2012
MUON TARGET PARTICLE PRODUCTION STUDY: TAPERED FIELD PROFILE HISHAM KAMAL SAYED Physics Department Brookhaven National Lab July 3, 2012 Hisham Kamal Sayed BNL Ding’s Optimized Parameters Hg Target θTarget = 0.137 rad Rtarget = 0.404 cm Proton Beam E = 8 GeV θBeam = 0.117 rad x = σy = 0.1212 cm (Gaussian Distribution) Solenoid Field IDS120h 20 T peak field at target position (Z=0) Aperture at Target R = 7.5 cm - End aperture R = 30 cm Fixed Field Z = 1862.0 Bz = 1.5 T Production: Muons within energy KE cut 40-180 MeV 3.27 X 104 (Nini =105) 11/6/2015 2 Hisham Kamal Sayed BNL 11/6/2015 Target Particle Production with 15 T Peak Solenoid Field Particle Capture requirement (Pt ~ 0.225 GeV/c) Br = 20 T X 7.5 cm = 150 T cm ----Br = 15 T X 10 cm = 150 T cm Fixed flux requirement (Aperture Requirement) Br2 = 20 X 7.52=1125 T cm2 ------ Br2 = 15 X 102 =1500 T cm2 MARS simulations with 15 T peak field & new aperture settings (Taper R = 1030 cm) 2.5 2 1.5 Bz [T] 1 0.5 0 600 800 1000 1200 1400 Z [cm] 1600 1800 2000 3 Hisham Kamal Sayed BNL 11/6/2015 Muon Production IDS120h 15 T Bz=1.85T Bz=2.12T Bz=2.5T Bz=1.7T Bz=1.667T Bz=1.667T Bzpeak = 20 T Zend =1862 Bzend =1.5 T Bz=1.667T Bz=1.667T Bz=1.5T Bz=1.5T 4 Hisham Kamal Sayed BNL 11/6/2015 Analytic form for Tapered Solenoid (K. McDonald) Inverse-Cubic Taper Bz (0, zi < z < z f ) = a1 = - B1' pB1 a3 = -2 B1 [1+ a1 (z - z1 ) + a2 (z - z1 )2 + a3 (z - z1 )3 ]p (B1 / B2 )1/ p -1 2a1 a2 = 3 (z2 - z1 )2 z2 - z1 (B1 / B2 )1/ p -1 a1 + 3 (z2 - z1 ) (z2 - z1 )2 Off-axis field approximation a0(2n) (z) r 2n Bz (r, z) = å (-1) ( ) (n!)2 2 n n Br (r, z) = å (-1) n a0(n) = n+1 a0(2n+1) (z) r 2n+1 ( ) (n +1)(n!)2 2 d a0 d n Bz (0, z) = dz n dz n n Field at R=0 5 Hisham Kamal Sayed BNL MARS RESULTS Beam Pipe with constant R = 30 cm Beam Pipe material changed to blackhole to speed calculations Added subroutine to m1510.f (FIELD) to calculate the field using inverse cubic equations 11/6/2015 6 Hisham Kamal Sayed BNL 11/6/2015 Inverse Cubic Field(P = 1) MARS simulation results: Counting muons at 50 m with K.E. 80 -140 MeV 0.42 0.41 N[muons]/N[p] 0.4 0.39 0.38 0.37 Bz=20 -> 1.5 T 15 -> 1.5 T 15 -> 1.66 T 15 -> 1.8 T 0.36 0.35 500 1000 1500 2000 2500 Zend [m] 3000 3500 4000 4500 7