Operating Review Spring 09 Agenda Welcome – Fran Ulmer Management Review – Bill Spindle Facilities Update – Chris Turletes Performance ‘09
Download ReportTranscript Operating Review Spring 09 Agenda Welcome – Fran Ulmer Management Review – Bill Spindle Facilities Update – Chris Turletes Performance ‘09
Operating Review Spring 09
Agenda
Welcome – Fran Ulmer Management Review – Bill Spindle Facilities Update – Chris Turletes Performance ‘09 – Renee Carter-Chapman Conditions – Fran Ulmer Priorities – Mike, Bruce Schultz, Bill, Renee, Beth Rose FY10/11 and Beyond – Mike and Bill Closing Remarks – Fran
Management Report Recap
Carryforward analysis FY09: Approx $7.2M (2.9% of operating revenue) FY09 budget building process Based on UAA 2017 and UA 2009 Key principles Combine with FY10 budget development process Separate allocation process for comm campuses Units get carryforward 80/20 tuition revenue sharing Kept 2% reserve: approx $2.7M
Kept 1% holdback for focused investment
Community Campus Support
UAA MAU maintains separate allocation process for community campuses All tuition All staff benefit increases/savings All indirect cost recovery Support for operating and capital budgets Don’t generally reallocate funding to CCs Also don’t take funding from CCs for reallocation to others Administrative support HR, Procurement, Accounting, etc.
Academic support Facilities support
Space Allocation and Utilization
Space Allocation Web based process http://www.uaa.alaska.edu/spacemanagement/ PBAC Facilities Subcommittee Space Utilization R25 Software Real-time tracking/reporting on space Three phases Centralized classrooms (68) Non-class room space – conference rooms, etc.
Non-centralized classrooms (183) Just completed phase three
Space Allocation and Utilization
Space utilization initial findings: Average utilization (Mon-Thurs) Centrally scheduled rooms: 61% Non-centrally scheduled rooms: 46% Much more to do Space utilization study team Course caps vs room caps Type of classroom vs usage Efficiency vs effectiveness
Internal Reallocation Summary
Targeted support of high priority programs and critical support areas Complement legislative and SW support FY07:$2,224,000 Reallocated from central funds Primary focus Strengthen instruction: $1,230,000 Student success: $350,000 Administrative support: $644,000
Internal Reallocation Summary
Targeted support of high priority programs and critical support areas Complement legislative and SW support FY08: $2,168,100 Reallocated from central funds and administrative units ($725,000) Primary focus Strengthen instruction:$1,388,000 Student success: $205,000 Administrative support: $575,100
Internal Reallocation Summary
Targeted support of high priority programs and critical support areas Complement legislative and SW support FY09: $1,593,600 Reallocated from central funds and across the board 1% from all units ($841,000) Primary focus Strengthen instruction: $638,200 Student success: $305,600 Administrative support: $649,800
FY09 Base GF Funding: Engineering Expansion of BSE Program: $575.0
All five positions expected to be hired by Summer 09 Advising/Technician Support for Eng Expansion: $200.0
Hired non-faculty advisor and lab tech in 08 Civil Engineering Expansion: $130.0
Added faculty member specializing in transportation engineering in 08 Geomatics Engineering Expansion: $100.0
Position to be filled within a month
Cost Savings and Efficiencies
Every department looking for efficiencies and savings College of Ed: Eliminated Adult Ed program, saved $170,000 University Advancement: scaled back event expenses, promotional giveaways, office supplies and development activities, saved $225,200 Athletics: Took advantage of permanent fund airfares, saved $293,730
Cost Savings and Efficiencies
Planning major fall campaign to recharge and refocus IDEA campaign Evaluated and implemented hundreds of cost saving suggestions New focus will be on sustainable….
Programs Facilities Support Space
Spring 2009 Operating Review Facilities Status
Expenditure Requirements Per Board of Regents Policy
FY08 Required MAU Minimum - $ 8,378,972 MAU Actual Expenditures –
$10,490,835
Anchorage - $ 8,163,241 KPC – $ 708,130 Kodiak - $ 655, 712 Mat-Su - $ 719, 649 PWSCC - $ 244,103
Breakdown of Anchorage Campus Facilities M&R Expenditures FY08
Total (Anchorage Campus) FY08 Facilities M&R Expenditures - $6,532,825 1 147 486 127 532 1 605 988 2 111 356 616 504
Electrical/Mechanical Administration M&R Projects R&R Projects Space Upgrades Auto/Diesel Bldg Maintenance
111 373 812 586
FY08 Breakdown of Auxiliary Expenditures Budget Required $ 1,909,040 (Actual $1,630,416)
Major Projects Funded in FY08 Anchorage Campus (over $25K)
BUILDING
Social Science Building WFSC Swimming Pool WFSC WFSC Admin Building Student Union Bookstore ULB Spine (SU to Engineering) Consortium Library PSB Lucy Cuddy Housing MAC Housing
PROJECT
Rm 118 Lighting Upgrade Energy Project--Light Replacement Concession Area Gym Floor (concrete waterproofing) Reconfig Provost/VC /Advancement space Fire Egress Stairwell Stairwell to Basement Curb and Side Walk Repair/Replacement Carpet Replacement E media/ Justice CHSW Dean’s Area remodel Concession Area Recreation Field Heating Piping Replacement and Repairs
EXPENSE
$ 101.0K
$ 84 .0K
$ 147.9K
$ 37.3K
$ 200.0K
$ 76.5K
$ 29.5K
$ 33.2K
$ 45.5K
$1,000K $ 40.0K
$ 80.1K
$ 36.1K
$ 83.6K
Major M&R Community Campus Projects for FY08
CAMPUS/BUILDING
KPC –Homer
PROJECT
Replace and Renew Siding KPC Ward Building Replace HVAC Fan Controls KPC Ward Building Remodel EMT Lab KPC KPC Kodiak Kodiak Kodiak McLane Bldg Complete Science Rooms Goodrich-McLane Complete Walkway Vo-Tech Residing Benny Benson & Campus Center Carpet Replacement Benny Benson/VoTech Restroom Upgrades
EXPENSE
$ 82.5K
$ 72.2K
$ 75.4
$ 73.0K
$ 319.3K
$278.5K
$ 31.4K
$ 174.6K
Major M&R Community Campus Projects for FY08
CAMPUS/BUILDING
MatSu/ Okeson Bldg
PROJECT
Fire Alarm Panel Upgrade MatSu/Snodgrass Renew Science Lab MatSu/ Exterior PWSCC/ Growden/Harrison PWSCC/Warehouse Fire Lane Widening Remodel for Science and Nursing AE Services for the Warehouse/Maintenance Shop
EXPENSE
$ 36, 157 $120,000 $ 79,987 $ 239,000 $ 22,663
Expenditure Requirements Per Board of Regents Policy
FY09 Required MAU Minimum - $ 9,178,859
FY09 MAU M&R Budget - $ 10,306,261 ($ 1,127,402 over minimum) Budget Spent 31 Jan 09
Anchorage(Inc Aux)$ 8,720,999 $ 5,320,570 KPC Kodiak Mat-Su PWSCC $ 557,026 $ 422,184 $ 267,572 $ 175,455 $ 424,648 $ 149,122 $ 336,016 $ 145,703
FY09 Major Funded Projects Anchorage Campus (over $25,000)
BUILDING
PSB Eugene Short Hall WFSC SSB Spine Campus Wide Library (Circulation Desk Area) 707 A St. Campus Space Upgrades
PROJECT
Dance Studio Floor Replacement Carpet and Stair Tread Replacement Gym Floor Lecture Hall Rm118 Lighting Replacement Furniture Carpet Heating system repairs Exterior Repairs Diplomacy, Admin, ULB, WFSC
FY09 Major M&R Projects Committed EXPENSE
$ 26,387 $ 32,848 $ 37,250 $132,000 $ 32,255 $ 48,400 $ 36,694 $ 75,948 $1,503,484
$ 2,290,945
Major Projects for FY09 Community Campuses
CAMPUS/BUILDING
KPC KPC KPC-Homer KPC-Homer Kodiak Kodiak Kodiak MatSu MatSu PWSCC PWSCC
PROJECT
Building Automation System Upgrade EMS and Anthropology Lab Improvements Restroom Remodel and Lighting Upgrade Siding VoTech Restroom Remodel Library Carpet Replacement and Painting Siding Replacement VoTech Carpet Fire Alarm Upgrade Lighting Upgrades Campus Shoppe/Café Renovation
EXPENSE
$ 23K $165K $ 40K $ 49.5K
$150K $185K $ 220K $ 8K $102K $100K $250K
Construction in Progress Highlights
Integrated Science Building – Opening Fall 09 Designer: ZGF/ECI Hyer Constructor: Cornerstone Completion: Sep 09/ TPC: $91M Move in begins in June
Construction in Progress Highlights
East Campus Parking and Loop Road Designer: ZGF/ECI Hyer Constructor: Roger Hickel Contracting Completion: Sep 09 / TPC: $13M
Health Science Building
Health Science Building Designer: LSI CM@R: Cornerstone Const Inc Completion: Aug 11 / TPC $ 46M Site Work Package Expected Late Summer 09 Next Regents Action will be: Report on CM@R Site Work Proposal
Sports Arena
UAA Sports Arena Designer: MCG Completion: Pending Funding Road/Site Package Possible for Late Summer 09 Next Regents Action will be: Approval of SD for Site Package at June BOR meeting
Summer Construction--Anchorage
Construction Summer 2009
Joint PhD —SSB Final Phase-- 2 nd Floor Pysch Lab and Cl Rms Designer: ECI Hyer, Completed: Sep 09
Construction Summer 2009
MAC Housing 3 Sprinklers/Fire Notification Designer: PDC Inc Constructor: Consolidated Constructing Completed: Aug 09 / TPC: $ 500,000
Construction Summer 2009
WWA and Aviation Roofs Designer: USKH, Inc Scheduled for Completion: Sep 09 / Combined TPC: $1.6M
Construction Summer 2009
Engineering Portables Completion: May 09 Inplace; need painting, skirting and furnishing 1K GSF each Office space and Classroom
Construction Summer 2009
Soldotna/KPC Waterline Designer: Wince/Corthell/Bryson for City of Soldotna Constructor: Peninsula Construction Completed : Spring 09 / TPC: $ 1.55M
Major Projects Update– PWSCC Warehouse/Maintenance Shop Designer: McCool Carlson and Green Constructor: Pacific Erectors TPC-- $ 1.4M Work Begins: May 2009 Work Complete: Late Sumer 2009
Construction Summer 2009 (M&R/R&R)
Kodiak Siding Phase I Siding Phase II (planning) Selected Carpet Replacement Roof Assessment Cable Plant Upgrade Master Plan Valdez Warehouse/Maintenance Building Housing Upgrades Fire Panel Replacement Roof Assessment and Repair Master Plan
Construction Summer 2009 (M&R/R&R)
KPC —Kenai River Campus Waterline Connections Soil Remediation Campus Cable Plant Upgrade Roof Assessment Master Plan KPC —Homer Landscaping Architectural Work Campus Cable Plant Upgrade Roof Assessment and Repair Master Plan
Construction Summer 2009 (M&R/R&R)
MATSU Fire Panel Campus Cable Plant Upgrade Master Plan Roof Assessment
UAA Planning
Anchorage Campus Community Campuses UAA Sports Arena Design and Site Work Science Building Renovation (Backfill) Re-roofing Projects Master Plan Update Refining Engineering Requirements with SW Facilties Cable Plant Renewal —All Campuses Community Campus Master Planning – All Campuses Homer – Classroom Building ($2.5M) PWSCC-- Housing Upgrades Mat-Su –Valley Center for Art and Learning KPC- Process Technology Facility Kodiak -- VoTech Bldg
Project Concerns
Sports Complex Only Partially Funded $15M in FY09; $0 FY10 PAMC Agrees with Shared Use Parking Timing of Regents Approval for Site Work Package Science Backfill Project Estimate $11.4M in FY 10 budget; $0 Will get started with FY09 R&R funds Engineering Portables and Voc Rehab short term (11K GSF) Possible Gift- Fabric Structure as “Design Studio” Recovered space in 3rd Floor Engineering (5K GSF) Rented Warehouse Space as a “Design Studio” Need a Long Term Solutio n Community Campuses Capital Planning Last year’s Projects revalidated; or a “Pause”
Sustainability Efforts
Energy Policy --Conservation VFDs; Motors, Controls No Touch/Low Flush Technology Classroom Lighting SSB 118 Carpet Recycling High Efficiency Boilers SSB High efficiency HW Heaters LED light demonstrations 2 new Hybrid Vehicles Trial Use of Hybrid Bus
Initiatives
Energy Related Concepts — Carbon Footprint Calculation and Reduction Plan ISB has extensive BAS controls, high efficiency modulating boilers and hot water heaters, VFDs on motors over 10 hp and energy efficient lights and controls. The SSB Joint PhD project also has energy efficient lighting, boilers and hot water heaters. Central Heat and Power Plant Energy Performance Contract LED Street/Garage Lighting/LED University
Volcano Preparedness
Plan for Ash Fall Monitored Events Personnel on Call Materials on Hand Executed Plan Campus Clean Up Continuous Improvement Reconstitute
EHS--Update
Significant Activities Since October 2008 Lab and Shop Inspections-Complete Community Campus Inspections (3 of 5) Disaster Exercise participation Building and Safety Coordinator Training 12 Sessions (2 x ea) on General Safety, Dealing with Difficult People, Sustainability, Fire Extinguishers, Em Planning, Claims and Reporting 50 + Participants Volcano Watch and Response activities ISB Start up Activities Tritium Exit Sign Inventory Response Intelex and Clarity Net Training and Demos
EHS-- Self Assessment
EHS-Accidents/ Regulatory Agency Fines
Lost Time Days per Year
Campus Space Renewal Projects
English in Admin 1st Floor
Diplomacy Space
Grants and Contracts Space @ Diplomacy
49
HR Space in ULB
Facilities Space in ULB
Administration Area
Lighting Upgrades
Summary
Lots of Work and Planning Anchorage and Community Campus Investing More than Minimum M&R into plants Master Planning Anchorage — Presentation to the BOR this Summer-- Sep 09 Kodiak, KPC, MatSu and PWSCC –Ongoing; Presentation to BOR-- Nov 09 Improving our Project Approval Process Will be Participating in the SW Facilities Organization Assessment Team Actively Investing in Energy Saving Technology Great to Have a SW Facilities Officer
Spring Clean-up 2009—Earth Day +1
Spring Clean-up 2009—Earth Day +1
Performance ‘09
Strategic Opportunity Fund Summary
Strategic investments in high priority areas Examples – Student Success Degree Audit and Advising Planning (Degree Works) Established 24/7 access to degree planning tool Supplemental Instruction Begun in FY06 Supports SI Coordinator and SI Leaders/Peer Mentors Targets poor performers in entry-level courses Results: Significant grade improvement Examples - Intensive Faculty and Staff Development Programs Integrating Issues of Climate Change into the Curriculum Engaging Controversy/Difficult Dialogues Intensive Developing a Diversity Team at UAA Continuing to assess investments
Key Conditions
National and State Economies State Budget The Stimulus and Federal Spending UAA Communities and Markets for Higher Education
UAA 2017 Priorities & Accreditation “Core Themes”
Strengthen and Develop the Total UAA Instructional Program Reinforce and Rapidly Expand our Research Mission Expand Educational Opportunity and Increase Student Success Strengthen the UAA Community Expand and Enhance the Public Square
Priorities: Total Instructional Program
Alaska’s critical higher education needs in workforce development: Health Engineering Business Teacher Education Career and Technical Fields
Priorities: Total Instructional Program
Continuing major commitments to: CPDS Student Research General Education/Related Instruction Honors International and Intercultural Engagement Professional Doctorates Joint and Collaborative PhDs?
Priorities: Research Mission
Emphasize building infrastructure, enhancing student research, and growing capacity for competitive research Build on existing strengths in social sciences Build on emerging strengths in biological, bio medical, environmental, and health science Pursue areas of critical need to Alaska and USA Energy research
Priorities: Student Success
• • Defined as access, transition, retention, persistence, achievement, completion, and distinction Continuing focus on: – P-20 – Placement – Advising – Retention – Efficiency
Priorities: UAA Community
Student Life Safety Sustainability Stewardship Diversity Engagement Personnel hiring, development, review
Priorities: UAA Community – Plant, Equipment, Info Technology
• • • Capital projects Bandwidth for equivalent info tech experience across MAU Anchorage campus restricted footprint • Available buildable land limited
Priorities: Engagement
Partnerships: Career Cluster Planning in Career and Technical Education Partnerships: P-20 Education Service Learning Engaged Research
Priorities: Philanthropic Outreach
Development efforts challenged by financial crisis and recession Working to keep outstanding team Appreciate UA Foundation efforts to reorganize Advancement Services system-wide Focus on increased individual support Focus on continued development of strong alumni community Foundation endowment reports Improves visibility Will analyze spendable balances Ensure full use of funding
Priorities: Accreditation
• • • • New Accreditation Scheme – More information – – – More complex More frequently Shorter time frame Accreditation can no longer be treated as a once a decade requirement to addressed with ad hoc organization Accreditation requirement prompts close attention to convergence principle UAA is Pilot Institution
UAA Organization and Planning
FY 10 Distribution
Operating Preserve and develop success of last 10 years Fixed Cost Increases Salaries and benefits ISB Use legislative funding for facilities operations Use one-time bridge funds for remaining facilities ops funds and ISB personnel hires Keep track of actual costs Go back to legislature next year for balance of costs Athletics and Risk Management SW Rent Campus allocations Other Library IT
FY 10 Distribution
Operating Preserve and develop success of last 10 years Complement legislative programmatic funding Continue to strengthen instruction Refocus and strengthen research effort Reinforce student success initiatives Allocation of funds Central funding plus shortfall funded by one-time 1% reallocation from most budget units Exceptions: University Advancement, Student Affairs, Library, IT Strategically determining eventual base cuts to replace one time bridge funding
Stimulus Proposals Submitted
National Institute for Health Department of Justice National Center on Minority Health $2.9M
$1.1M
$1M
Possible Stimulus Proposals from Departments
Small Business Development Center – Office of Science Financial Assistance Program Center for Human Development - NIH College of Education - NIH ANSEP - Department of Commerce WWAMI – NIH Justice Center/University Police – Office of Juvenile Justice and Delinquency Prevention
FY 11 and Beyond
Operating
Develop plan to reallocate 7% of budget to sustainable priority programs over next 3 years
Deans design process to identify and reconfigure, reduce, or eliminate low performing/nonsustainable programs Administrative directors do efficiency/effectiveness study of organizations Capital
Sports Arena
Groundbreaking event in September Explore fund raising possibilities Engineering Bldg
Look for temporary space: portables/voc rehab bldg Refine space need Health Science Bldg II
Clear need; concept design ready to go Work with health industry partners Housing
Work with SW to do needs analysis
UAA
Community Campuses
A Very Good Year
Athletics
UAA sets Western Collegiate Hockey Association (WCHA) Record UAA’s ski team qualifies entire team to compete at the NCAA Championships UAA Women’s Basketball Team had another record setting year
Academic Programs/Research
College of Business and Public Policy received AACSB reaccreditation Institute for Social and Economic Research published “How Hard is it for Alaska’s Medicare Patients to Find Family Doctors?” Every Alaska WWAMI faculty member with a research component to his or her workload has funding at either the national or international level.
Academic Programs/Research Continued The Center for Behavioral Health Research and Services: Annual Budget Overall awards >$2M >$10M Two Prestigious NIH R01 awards Grant expenditures FY09 to date are over $750K Key Part of the Joint PhD UAA School of Engineering has partnered with Dimond High School’s Engineering Academy
Education
AEIN Grant – largest grant ever awarded UAA (2004) COE had 100% of all students who interned in Early Childhood and in Elementary Education and were seeking employment hired by Alaska districts.
Joint Speech and Language Pathology Graduate Program
Students
Fourth consecutive Truman Scholar from UAA (Deana Glick) Deana Glick – Truman Scholar Students craft climate action plan for Anchorage Construction Management Club takes 2 nd place at major national competition U.S. Department of State 2009 Critical Languages Scholarship in Advance Chinese (Melanie Parrett)
Students Continued
First Marshall Scholar at UAA (Kelcie Ralph) Congress Bundestag Scholarships (Jessica Allman and Renata Ballesteros-Lopez) University Honors student to attend Harvard Law after graduation from UAA this spring (Severin Randall)
Since 2004, scholarship awards at UAA have increased by 85%. Of students choosing to report, 58% of scholarship recipients are first generation students
Kelcie Ralph – Marshall Scholar
UAA Graduates
Total Graduates for AY09 = 2200 (projected) Comparison AY06 1842 Graduates AY07 2022 Graduates AY08 1975 Graduates