THE BUREAU OF OVERSEAS BUILDINGS OPERATIONS (OBO) SAME/ CMAA LUNCHEON NOVEMBER 20, 2013 U.S.
Download ReportTranscript THE BUREAU OF OVERSEAS BUILDINGS OPERATIONS (OBO) SAME/ CMAA LUNCHEON NOVEMBER 20, 2013 U.S.
THE BUREAU OF OVERSEAS BUILDINGS OPERATIONS (OBO) SAME/ CMAA LUNCHEON NOVEMBER 20, 2013 U.S. DEPARTMENT OF STATE B U R E AU O F O V E R SE AS B U I L D I NG S O P E R AT I O NS WHO WE ARE OBO directs the overseas building program for the U.S. Department of State and other Agency personnel serving abroad as foreign service diplomats. With the support of Congress and other Department Bureaus, OBO sets worldwide priorities for the design, construction, operation, maintenance, and disposal of overseas property. JAKARTA OUR MISSION To provide safe, secure and functional facilities that represent the U.S. Government to the host nation and support our staff in the achievement of U.S. foreign policy objectives. These facilities should represent American values and the best in American architecture, design, engineering, technology, sustainability, art, culture and construction execution. BEIJING PROGRAM FACTS 78,000,000 275 SQUARE FEET MISSIONS $7 BILLION UNDER DESIGN & CONSTRUCTION PROGRAM INVENTORY • Embassies • Consulates • Office and Support Annexes • Housing • Warehouses and Shops • Cultural Heritage Properties LONDON PROGRAM INVENTORY PROGRAM INVENTORY CONSTRUCTION PROGRAMS Capital Security Construction • 36 Active Projects • $7.3 Billion Workload Major Renovation • 22 Active Projects • $447 Million Workload Compound Security Upgrade • 39 Active Projects • $174.1 Million Workload • Project Value Range: $1 - $15 Million BUJUMBURA EXCELLENCE INITIATIVE Past Moving Forward • • Remote Locations / Greenfield Urban Locations / Brownfield Redevelopment Development • Standard Embassy Design • Design Standards that allow flexibility • First Costs • Life Cycle Cost • Prescriptive Building Standards • Result-driven Building Standards • Security and Life Safety • Security and Life Safety • Technical Reviews • Industry Design Reviews • Reaction Driven • Innovative PROJECT DELIVERY METHOD JAKARTA • Both Design-Bid-Build and DesignBuild with Bridging Documents are used; neither is a default • Context, complexity, construction environment, and urgency are evaluated in deciding a delivery method • OBO Director determines the project delivery method for each project • Alternative project delivery methods such as Early Contractor Involvement are used to ensure best possible outcome and reduced risk A/E SELECTION PROCESS • Encouraging both emerging practices and established firms • Selection criteria reflects emphasis on the delivery of high quality projects • Initial selection focuses on the strength of the lead designer and the associated A/E firm • Second-stage selections focus on the strength of the team, the management plan, and the quality of past performance on construction documents • Where appropriate, design competitions are incorporated into the selection process • Selection Panel consists of OBO associates, industry peers and foreign service users CONSTRUCTION SELECTION AND AWARDS Contractor Selection • The Department is recruiting, prequalifying and awarding contractors committed to the best D-B-B and D-B practices with verifiable records of consistent success • The Department is working to expand the pool of contractors to promote competition and the best outcome for the U.S. government Contract Award • Best Value method is used to evaluate proposals, with focus on past performance and project management in the evaluation process, rather than strictly lowest proposed cost ORGANIZATIONAL CHART DESIGN STANDARDS Industry Best Practices • International Building Code • Integrated Design Reviews • Unique Security Features • Hard Metric Drawing/Specs • CADD & BIM Deliverables • LEED Silver Certification • Life Cycle Value Engineering AMSTERDAM FUNCTIONAL PROGRAMS • Natural Hazards: Identifies and Reduces Risks to Personnel and Property Due to Destructive Natural Events (Earthquakes, Hurricanes, Floods, etc) • Barrier Free Accessibility: Corrects Backlog of Non-Accessible Facilities Focusing on Site Access, Building Entrances and Public Spaces • Energy Conservation and Sustainable Design: Implements Energy and Water Saving Projects to Reduce Operating Costs • Building Innovation: Conducts Building Research and Development to Continuously Improve Building Products and Design Methods SUSTAINABLE DESIGN ® 20 LEED Certified ® 28 LEED Registered PERIMETER IMPROVEMENT • Collaboration between OBO and Diplomatic Security • Integration of Landscape and Security • Public Face of Diplomatic Facilities begins at perimeter • Makes positive first impression • Demonstrates the openness and optimism of the American people HIGH PERFORMANCE INTERIORS • Response to constant change in overseas presences • More focus on teaming and collaborative work styles • Flexible interior systems include: • Raised Floors • Exposed Ceilings • Demountable Walls • Mobile Modular Furniture • Task Lighting/Power • Occupant Controlled HVAC LONDON RECENT AWARDS A/E IDIQ for Worldwide Design Services New Construction – Ennead Architects – Miller Hull Partnership – Richard + Bauer Architecture – Shop Architects – Skidmore Owings & Merrill Major Rehabilitations / Renovations – Beyer Blinder Belle Architects – BNIM Architects – Krueck & Sexton Architects – Weiss/Manfredi Architects – Zimmer Gunsul Frasca GUANGZHOU PHOTO CREDIT: BRUCE DAMONTE SKIDMORE, OWINGS & MERRILL, LLP RECENT AWARDS A/E U.S. Embassy Mexico City, Mexico Tod Williams Billie Tsien/Davis Brody Bond Architects Residential Facility Paris, France Michael Maltzan Architects U.S. Embassy Beirut, Lebanon Morphosis Architects U.S. Embassy Athens, Greece - Major Rehabilitation Ann Beha Architects FY13 CONSTRUCTION AWARDS New Construction • New U.S. Embassy Moscow Major Rehabilitation • U.S. Embassy Budapest – Caddell Construction • New U.S. Embassy Nouakchott – Enviro-Management & Research Inc. • – Caddell Construction • New U.S. Embassy Paramaribo – • – • – Caddell Construction • Pernix-Serka U.S. Embassy Vilnius – BL Harbert International New U.S. Embassy The Hague U.S. Embassy Freetown Enviro-Management & Research Inc. U.S. Embassy Wellington – Desbuild OPPORTUNITIES IDIQ Opportunities A/E Design Opportunities • • • Posted on FedBizOpps (www.FBO.gov) Posted on OBO’s website ( www.STATE.gov/obo) Posted on AIA’s website Construction Opportunities • • Posted on FedBizOpps (www.FBO.gov) Posted on OBO’s website ( www.STATE.gov/obo) • • • • • • • • • • • • • A/E Design Services – World Wide A/E Design Service for Rehabilitation/Renovation and New Construction – Sustainability – A/E Support Service Design-Build Construction and Design/Build Services Commissioning Services Scheduling Consultants Value engineering services Telecommunication services Roofing Services Fire Systems Modular Construction Photovoltaic & Wind Generated Power Technical Security Seismic POINTS OF CONTACT Office of Acquisition Management David Vivian, Division Director [email protected] Brian Mulcahy, Contracting Officer [email protected] OBO Director of External Affairs Christy Foushee [email protected] BANDAR