Client Name Gladstone Regional Council Project Name 1770/Agnes Water Integrated Water Contract Requirements Date 20 July 2008 Gladstone Regional Council 1770/Agnes Water.
Download ReportTranscript Client Name Gladstone Regional Council Project Name 1770/Agnes Water Integrated Water Contract Requirements Date 20 July 2008 Gladstone Regional Council 1770/Agnes Water.
Client Name Gladstone Regional Council Project Name 1770/Agnes Water Integrated Water Contract Requirements Date 20 July 2008 Gladstone Regional Council 1770/Agnes Water About the presenter Providing Infrastructure advice in … PNG Sri Lanka Sumatra Yemen Namibia Port Douglas Townsville Innisfail Mission Beach Mackay Toowoomba Warwick Noosa Noosa Redcliffe BRISBANE Gold Coast Parramatta Mildura Grampians Daylesford Ballarat Geelong MELBOURNE Gladstone Regional Council 1770/Agnes Water Coffs Harbour Bega Wodonga Gippsland Introduction Water and Wastewater Utilities Services Agreement > Parties – Gladstone Regional Council; and – United Utilities Australia. > Purpose – “The Council proposes to implement the “1770/Agnes Water Integrated Water Project to provide sufficient good quality water and wastewater services to the townships of 1770 and Agnes Water.” > Process: – – – – – – – – – – Contract Procurement workshop Business Case QTC Financial Modeling Detailed Options Analysis Environmental approval Planning approval Expression of Interest Tender Award subject to limited Condition Precedent (CP) Modification, funding approval and release of CP Gladstone Regional Council 1770/Agnes Water Contract Principals > > Form of Contract : Term: > References Contracts: > Aim: Obligations: > Design > Construction > Operation > Land > EPA Licence > Payment > Pre-existing Contamination Gladstone Regional Council 1770/Agnes Water Fixed Price - Design Build Operate 10 years post Commercial Acceptance with 5 year extension (20 years) Wagga, Wodonga, Ballarat (2), Noosa (2), Central Highlands (3) etc To engage with a best practice Operator; leverage high standard of performance; provide price and performance certainty all in an affordable package (contained water rate increases). UUA UUA UUA Council Council Council Council Contract Term Effective Date Last Date for Commercial Acceptance (DfCA) Expiry of Term (unless extended) Contract Term Operating Term Design, Construction & Commissioning Commencement Date Gladstone Regional Council 1770/Agnes Water Option Extension 1 (5 years) 10th anniversary of DfCA Optional Extension 2 (5 years) 15th anniversary of DfCA 20th anniversary of DfCA Contract Scope > > > > > Operate & maintain Councils existing water & wastewater treatment assets; Upgrade the existing Lagoon treatment system to ensure the effluent is in compliance with EPA standards; Design & Construct the following new assets (Modification); – Wastewater treatment plant; – Desalination and bore water treatment plant; – 1770 Water supply pipes and reservoir; – 1770 Wastewater reticulation pipes – Interconnecting pipework to and from water & wastewater assets; and – Overall SCADA control system. Operations, maintenance and asset renewal for all water & wastewater treatment assets for the Contract Term; Invited Services in Water outside 1770/Agnew Water region. Gladstone Regional Council 1770/Agnes Water Contract Responsibilities > > Principal: Council have employed Best Practice Operator to deliver assets and operate plants and in UUA’s area of responsibility UUA will take the responsibility. UUA will at its own cost and risk: – – – – Design; Construct; Operate; and Repair maintain each Facility so that it can provide the Services to at least the Quality Standards. > Without limitation UUA accepts the risk ….. whether or not this agreement refers … unless the Council expressly agrees to bear that risk; > UUA shall perform the obligations in accordance with the Minimum Standards and this agreement on the basis of their Submission. Gladstone Regional Council 1770/Agnes Water Contract Payment > Design & Construct – Fixed Priced Milestone schedule – Milestone Completion; – Design Certification; > Start-Up Operations - Toll – Existing Lagoon Toll (Fixed monthly) – Existing Water Toll (Fixed and Variable). > Technical Completion – Design Certification; – Compliance Testing; – Step performance increase – Toll increases > Operations - Toll – Wastewater Toll (Fixed and Variable); – Water Toll (Fixed and Variable); – Asset Replacement (Fixed annual); – Pre agreed escalation Formula. Gladstone Regional Council 1770/Agnes Water Security and Liquidated Damages > > > > Warranties attained Security Deposit Security reduces following Commercial Acceptance i.e.: – Commissioning – Process Stabilisation – Technical Completion – 40 day on load wastewater compliance test with 24 hour sampling and continuous conformity – 30 day on load water compliance test with 24 hour sampling and continuous conformity Liquidated Damages – Desalination Plant – Wastewater Plant – 1770 water & wastewater pipelines Gladstone Regional Council 1770/Agnes Water Performance and Toll Abatement > Technical Completion: – UUA warrants that Plant will meet new Quality Standards – The New Toll applies – Toll abatement applies – 40 and 30 day performance test to achieve Commercial Acceptance > Toll Abatement: – Pre-determined % reduction in Toll – Maximum is 20% of monthly Toll – Abatement is to maximum % for single event Gladstone Regional Council 1770/Agnes Water Performance Requirements - Wastewater Table 3.2 – Reclaimed Water Quality Standards for nutrients Parameter Unit Limit 50% ile Limit 90% ile Total Nitrogen mg/L Less than 5 Less than 10 Total Phosphorus mg/L Less than 1 Less than 2 Table 3.3 – Reclaimed Water Quality Standards for Class A+ Recycled Water Parameter Unit Limit Limit Type E coli Cfu/100mL Less than 10 Median BOD5 mg/L 5 Median Turbidity NTU 2(5)* 95% ile SS mg/L 5 Median TDS mg/L 1000 Median Conductivity µS/cm 1600 Median pH Not applicable 6 – 8.5 Not applicable Gladstone Regional Council 1770/Agnes Water 1770/Agnes Water Gladstone Regional Council 10/03/2008 10/12/2007 10/09/2007 10/06/2007 10/03/2007 10/12/2006 10/09/2006 10/06/2006 10/03/2006 10/12/2005 10/09/2005 BOD5 10/06/2005 10/03/2005 10/12/2004 10/09/2004 10/06/2004 10/03/2004 10/12/2003 10/09/2003 10/06/2003 10/03/2003 10/12/2002 10/09/2002 10/06/2002 10/03/2002 10/12/2001 BOD (mg/L) Performance – Existing Wastewater BOD BOD Max 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 11 /1 1/ 11 2 00 /1 5 2/ 11 2 00 /0 5 1/ 11 2 00 /0 6 2 11 /2 0 /0 06 3/ 11 2 00 /0 6 4/ 11 2 00 /0 6 5/ 11 2 00 /0 6 6 11 /2 0 0 /0 7/ 6 11 2 00 6 /0 8/ 11 2 00 /0 6 9 11 /2 0 /1 06 0/ 11 2 00 6 /1 1 11 /2 0 /1 06 2/ 11 2 00 /0 6 1/ 11 2 00 /0 7 2 11 /2 0 /0 07 3/ 11 2 00 /0 7 4/ 11 2 00 /0 7 5/ 11 2 00 /0 7 6 11 /2 0 /0 07 7/ 11 2 00 7 /0 8/ 11 2 00 /0 7 9 11 /2 0 /1 07 0/ 11 2 00 7 /1 1 11 /2 0 /1 07 2/ 11 2 00 /0 7 1/ 11 2 00 8 /0 2 11 /2 0 /0 08 3/ 11 2 00 /0 8 4/ 11 2 00 /0 8 5/ 11 2 00 /0 8 6/ 20 08 Performance Expectation – Wastewater Treated Wastewater Biochemical Oxygen Demand EPA Median Limit Gladstone Regional Council 1770/Agnes Water BOD Median Value (mg/L) 9 8 7 6 5 4 3 2 1 0 Performance Requirements - Water Table 3.3 – Treated Water Quality Specifications Post Technical Completion Treated Water Quality Parameters Limit pH 90 percentile less than 8 100 percentile less than 8.5 100 percentile more than 6.5 TDS 25 percentile less than 350 mg/L 95 percentile less than 465 mg/L 100 percentile less than 500 mg/L Conductivity 75 percentile less than 850 µS/cm 100 percentile less than 950 µS/cm Alkalinity (as CaCO3) 50 percentile less than 100 mg/L 95 percentile less than 200 mg/L Turbidity 50 percentile less than 1 NTU 95 percentile less than 2 NTU 100 percentile less than 5 NTU True Colour (platinum scale) 50 percentile less than 5 PCU 100 percentile less than 10 PCU Gladstone Regional Council 1770/Agnes Water CCPP 95 percentile range between -3 to +0.5 mg/L 100 percentile range between -5 to +0.5mg/L Performance Requirements - Water Total Coliforms 100 percentile zero CFU/100mL E.coli 100 percentile zero CFU/100mL Free Chlorine (as Cl2) 95 percentile +/- 0.3 of designated set point. Not to fall outside of 0.7 – 2.3mg/L. The Council will advise the set point. Sodium 75 percentile less than 120 mg/L 95 percentile less than 140 mg/L 100 percentile less than 150 mg/L Chloride 50 percentile less than 170mg/L 100 percentile less than 220mg/L Sulphate 100 percentile less than 100mg/L Iron 50 percentile less than 0.2mg/L 95 percentile less than 0.3mg/L Manganese 50 percentile less than 0.03mg/L 95 percentile less than 0.1mg/L Gladstone Regional Council 1770/Agnes Water Boron 50 percentile less than 1.3 mg/l 95 percentile less than 1.9 mg/l 100 percentile less than 2.0mg/L Other Health related parameters As per Australian Drinking Water Guidelines 6, 2004 (See 3.4B Below) Performance - Existing Water No. Sample I.D. Sample type E.coli (cfu/100ml) Total Coliforms (cfu/100ml) 1 2 3 4 5 6 7 8 9 10 LOR A/w Trench 2 Trench A/w Bores A/w Water Plant A/w School A/w Tom Jeffery Park A/w Reservoir A/w Beaches of 1770 1770 red Pitt Bores 1770 Red Pitt 1770 Camping Ground Raw Raw Potable Potable Potable Potable Potable Raw Potable Potable 1 30,000 <1 <1 <1 <1 <1 <1 <1 <1 <1 1 170,000 78 9 11 37 2 2 62 <1 84 HPC (cfu/ml at 35oC) 10 3,100 10 10 <10 <10 <10 40 60 10 <10 Dr. Julian Catmull and Dr. Michael ten-Lohuis Enviro-Check Enterprises Pty Ltd Friday, 18 April 2008 4:08 PM Gladstone Regional Council 1770/Agnes Water Free Chlorine (ppm) pH *Conductivity (µS/cm) *Turbidity (NTU) 0.01 NA NA 1.5 1.5 0.6 0.6 1.2 NR 1.2 1.0 0.01 6.27 5.09 7.2 7.2 7.4 7.2 7.2 6.77 7.2 7.2 1 220 110 170 180 190 200 330 370 290 310 0.01 1.08 3.85 3.96 7.95 4.25 3.39 0.02 0.73 0.92 0.44 Water Supply - Trench “Although raw water that is not currently in use, I think the result is significant because this potential water source has levels of E.coli and faecal coliforms similar to sewage. Perhaps there are dead animals somewhere in this body of water? I would certainly not recommend using this water as a source for your potable water plants.” Dr. Julian Catmull and Dr. Michael ten-Lohuis Enviro-Check Enterprises Pty Ltd Friday, 18 April 2008 4:08 PM Gladstone Regional Council 1770/Agnes Water Performance Expectation – Water Riverland Turbidity 100.00% 99.00% 98.00% % compliance 97.00% 96.00% 95.00% 2003 / 04 2004 / 05 2005 / 06 2006 / 07 2007 / 08 Gladstone Regional Council 1770/Agnes Water Capital Costs Project Component Revised Project Costs Subsidy Offer* Desalination Plant $24,871,314 $19,948,525 Sewer Treatment $6,849,110 $3,265,376 Reticulated Water Supply 1770 $1,368,145 $1,270,000 Low Pressure Sewerage $3,883,800 $1,635,000 Contract Supervision $2,063,806 $825,523 $718,271 - $39,754,446 $26,944,424 Supply and Install Sewer Pipe TOTALS Normal Qld Position 40% Outside Queensland 0% Gladstone Regional Council 1770/Agnes Water Sources of Capital Funding > > > > > Water Headworks: Sewer Headworks: Reserves: Borrowings: Subsidy: $1,367,720 $1,239,660 $882,000 $9,320,642 $26,944,424 (including developer contribution repayment). Gladstone Regional Council 1770/Agnes Water Operating Costs > Fixed and variable components (Toll). > Detailed financial model assessed by Queensland Treasury Corporation. > Estimated operating cost of the IWS in 2008/09 is $557K, stepping up to >$1M in 2009/10 as the system comes on-line and then costs level out. > Scheme operates at deficit position until about Year 7 when it returns positive cash flow. > Deficit funded by borrowing from Council reserves. Gladstone Regional Council 1770/Agnes Water Contract Activities – Start Up Who Action Required At least 3 weeks before the Commence ment Date Operator Give the Council a written estimate of the quantity of operational chemicals required so that the Operator can operate and maintain each existing Facility for the first 4 weeks. Annex 2 Pt 1 1.6(b) Prior to the Commence ment Date Operator Develop a ‘Site Security Plan’ for each Site and take responsibility for controlling and securing all Sites. Annex 1 Pt 1 2.20 Prior to the Commence ment Date Operator Nominate any Contamination identified as a Pre-existing Contamination. Annex 1 Pt 2 2.3 Prior to the Commence ment Date Operator Assess the condition of each Site and prepare and deliver to Council a ‘Site Condition Report’ including a photographic record. Annex 1 Pt 1 2.25 Prior to the Commence ment Date Operator Provide to the Council: its 'plant operating procedures'; a planned 'asset management system'; plant 'monitoring' and 'reporting' regimes; and supply contracts for plant consumables. Annex 2 Pt 1 2.1 Prior to the Commence ment Date Operator Appoint and relocate the Operations Manager. Annex 2 Pt 2 4.1 Date Action Required Gladstone Regional Council 1770/Agnes Water Action Complete (Enter Date) Clause Contract Summary 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Long term Design, Build Operate Contractor Contract is with the Operator (UUA) not designer or builder Contract style has been very successful in delivering exceptional outcomes for Councils (Noosa for example) Contract is essentially a fixed price contract with pre-agreed escalation clause Council has engaged Best Practice Operator for services at 1770/Agnes Water with ability to use these services outside this geographic area Design & Construction payments are for pre-agreed and delivered milestones Contract is performance based with payment abatement for non-compliance Asset life is guaranteed throughout the Term of the Contract At the end of the Term the Contract provides for managed Handover High level of State Subsidy Gladstone Regional Council 1770/Agnes Water Queensland Level 13 145 Eagle Street Brisbane QLD 4000 Australia t +617 3228 0700 f +617 3228 0799 Victoria Level 2 164 Flinders Lane Melbourne VIC 3000 Australia t +613 8626 9200 f +613 9650 3160 www.perongroup.com.au Gladstone Regional Council 1770/Agnes Water Representations and Warranties > UUA warrants the design, the construction and the operations; > Council does not warrant or represent the Submission, Design Documentation, Works or Facilities O & M; > UUA acknowledges that Council has relied on its representations and warranties. Gladstone Regional Council 1770/Agnes Water Risk, Defects and Onus of Proof > Sole assumption of Risk: – Design and Construction – Operation UUA UUA > Defects apply to Design as well as Construction: – To be rectified by UUA at any time – May or may not be subject to Notification > Onus of Proof: – Onus of proof is on UUA as Agreement assumes guilt until proven innocent Gladstone Regional Council 1770/Agnes Water Bore performance A g n e s W a t e r Su p p l y B o r e s D e pt h of w a t e r ov e r p u mp s 14 ( me t r e s ) 12 10 P u mp in g R a t e s 8 Bor e 2 - 1. 5 l/ sec 6 Bor e 3 - 3 . 0 l/ sec 4 2 0 1/ 0 6 / 2 0 0 3 3 1/ 0 5 / 2 0 0 4 3 1/ 0 5 / 2 0 0 5 3 1/ 0 5 / 2 0 0 6 3 1/ 0 5 / 2 0 0 7 30/ 05/ 2008 D at e Gladstone Regional Council 1770/Agnes Water Bor e 3 - M in imum Bor e 3 - M aximum Bor e 6 - M in imum Bor e 6 - M aximum Bor e 2 - M in imum Bor e 2 - M aximum Contract Activities Effective Date Commencement Date Technical Completion Commercial Acceptance CONTRACT EXECUTION DELIVERY Commencement Date Activities Design and Documentation Construction Pre-Commissioning & Commissioning Cut-in & Biological Development Process Optimisation OPERATION Gladstone Regional Council 1770/Agnes Water Optional Extension (5 yrs) Optional Extension (5 yrs) Handback Secondary Aceptance Testing Operations of new Facilities Operator takes over operations from Council Core Term Aceptance Testing Termination