Adopted 2030 Plan Adopted 2030 Plan LYNX Blue Line (LRT) – FTA considers very successful (current ridership about 16,000 passenger) – Needs capacity for.
Download
Report
Transcript Adopted 2030 Plan Adopted 2030 Plan LYNX Blue Line (LRT) – FTA considers very successful (current ridership about 16,000 passenger) – Needs capacity for.
Adopted 2030 Plan
Adopted 2030 Plan
LYNX Blue Line (LRT)
– FTA considers very successful (current ridership about
16,000 passenger)
– Needs capacity for 3-car trains
– Blue Line Capacity Expansion Project
– Core Capacity Project
Blue Line Extension (LRT)
Red Line (Commuter Rail)
Silver Line (LRT or BRT)
West Corridor
Gold Line
– Under Construction
– Tracks & Crossings @ 90% design
– No clear funding plan
– Planning study and decisions
– Bus Service
– Convert to Streetcar
–
Phase I Completed
– Phase II design phase
Adopted 2030 Plan
Questions
Presentation of
OVERHEAD CONTACT SYSTEMS
This presentation will cover the various
OCS Types of Systems “in use” and
“planned!”
BlueLine
Original Design - BlueLine
SCAT - Simple Catenary
Auto-Tensioned- Limits
“I-485 to Tremont Street”
SCFT – Single Contact Fixed
Termination – South
Boulevard Light Rail
Maintenance Facility
SCFT -Simple Catenary Fixed
Termination – Limits
Tremont to Ninth Street
BlueLine Simple Catenary
Fixed Termination System
Original design was to
accommodate existing trolley
pole equipped Charlotte Street
Car, and Gomaco cars.
BlueLine Simple Catenary
Fixed Termination System
This included installing switch castings with
outside runners to accommodate pantographs
As construction was proceeding Northward
towards “Uptown” the cars were re-equipped
with pantographs thus deleting the needs for
trolley frogs and runners on the out side of the
casting, thus slightly changing the catenary
BlueLine Extension
BlueLine Extension OCS
SCFT -Simple Catenary Fixed
Termination – Limits Seventh
Street to Twelfth Street
SCAT - Simple Catenary AutoTensioned- Limits Twelfth Street
to University North Carolina –
Charlotte
SCFT – Single Contact Fixed
Termination – North Yard Light
Rail Maintenance/Storage Facility
BlueLine Capacity
Expansion
Purpose!
– The expansion of the existing
BlueLine to accommodate the
use of three car consists!
This did not change the existing
SCAT system, but it did provide
the opportunity to increase the
section of Auto-Tensioning
further North to the Carson
Interlocking Area plus install 4
substations deleted in the
original BlueLine Project
Charlotte Street Car –
Gold Line
Charlotte StreetCar Line
SCFT – Single Contact Fixed
Termination
FYI There are actually two distinct areas to
this alignment; a non-revenue section
connecting the line to the Light Rail Line and
second the alignment on Trade and Hawthorn
Streets.
Today there are two feeding substations,
reconditioned from the old museum line
transmitting at 650 Volts DC. The alignment is
setup to be fed also from the Light Rail Line if
the situation arises.
Wire Particulars
Messenger Wire –
500 MCM Hard Drawn Copper
Contact Wire –
350 MCM Hard Drawn Copper
Auto-tension tensions
Messenger – 5000 pounds
Contact – 3000 pounds
Fixed Termination tensions
Messenger Wire – 5000 pounds
Contact Wire – 2000 pounds
Single Contact – Fixed Termination
Contact 2000 pounds
Medium Temperature – 70 Degrees F