Start of S2 Milestone Work H. Padamsee Intro • At KEK S2 meeting we decided to make a list of milestones and eventually.
Download ReportTranscript Start of S2 Milestone Work H. Padamsee Intro • At KEK S2 meeting we decided to make a list of milestones and eventually.
Start of S2 Milestone Work H. Padamsee Intro • At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities • I tried to start a milestone list consistent with S0 and S1 plan • and look for consistency with current test facility plans • Please suggest revisions, additions… By end of 06 • Cavities – Complete 10 cavities • 4 ACCEL, 4 AES, 2 Jlab – Continue testing 4 ICHIRO and 4 TESLA-shape cavities at KEK • Order additional cavities – 14 US – 10 KEK • Cryomodules – Cryomodule #6 complete at DESY and tested at Cryomodule Test Facility (DESY) • First candidate for S1 – Cryomodule #6 installed in TTF-II (FLASH) – Procure cryomodule parts for Gen III module – Procure 12 couplers • RF – Procure Two 10 MW klystrons By end of 07 • Cavities – 70 cavities ordered and delivered over the course of 07 • 32 cavities delivered in US • 10 cavities delivered at KEK • 30 cavities delivered to DESY for XFEL (XX available for ILC?) – Order 160 cavities globally after Fall 07 (see S0.2) – Carry out 90 treatment and testing runs complete • 24 good cavities available from S0 production like effort of 06 and 07 • Cryomodules – One type III cryomodule completed at Fermilab from DESY supplied cavities – Complete One (4 cavity + 4 cavity) cryomodule at KEK STF – Finish design work on Type IV cryomodule by mid-07 • Is this region-compatible? – Order parts for 2 Type IV cryomodules (one in mid-07 and one in fall 07) – Process couplers By End of 07 • Beam Preparations – Work on injectors at STF and FNAL • Infrastructure for RF Units – Fermilab, Argonne, Jlab… • Install EP, VTS, HTS, CAF • Refrigeration XX watts for HTS – KEK • Install EP, CAF… • Refrigeration, xx watts – DESY – Other ? By End of 08: • Cavities – 160 cavities delivered globally (see S0.2) – Complete 200 process and test cycles globally (S0.2) • Yield = 130 good cavities – Continue to order XX cavities for industrialization? • Cryomodules – Complete 3 cryomodules from 24 good cavities of 07 • One Type III cryomodule • Two Type IV cryomodules – Order parts for 12 cryomodules of Type IV or ILC-type • 4 CM per region (3 plus spare) • RF • Beam • Infrastructure for RF Units – CM test stand By End of 09 • Cavities – Continue to process and test XX cavities for industrial cryomodules? • Cryomodules – Populate 12 modules of Type IV or ILC type • 4 per region • Need 96 good cavities globally – Continue to order XX cryomodules for industrialization? • RF Unit – 1 “learning” RF unit assembled in US • Other – Injector available for beam tests By End of 2010 • RF Units – Continue testing first RF unit – Assemble and Test 3- 4 RF units globally • One per region • Cavities and Cryomodules – Continue industrialization activity