Date: 12/12/14 Team members: Nick Harrison • Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not.
Download ReportTranscript Date: 12/12/14 Team members: Nick Harrison • Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not.
Date: 12/12/14 Team members: Nick Harrison • Problem: Material brought back from jobsites is not easy to find in the warehouse, and is not kept track of at all. • Goal: Create a system to manage the organization and tracking of the material. SIPOC Suppliers Inputs Material Suppliers Initial Material Finished Jobs Warehouse Manager PROCESS Material makes Left-over Material its way to the Material Organization warehouse Outputs Customers Stored material Project Managers Project Managers Project Managers • Strengths: • Dedicated warehouse manager. • Intelligent and able project managers. • Technologically capable. • Weaknesses: • Communication barriers between warehouse and office. • Older project managers may have difficulty learning new system. • Opportunities: • Increase speed of material delivery. • Decrease time spent searching warehouse for material. • Decreased costs for jobs. • Threats: • Lack of willingness to learn new system in the office. • Increased temporary workload for warehouse manager. Customer(s) CTQ KPOV(s) KPIV(s) Communication between project managers and warehouse manager Material placed in organized manner, and tracked in system Easy system to find correct material Project Managers Organized material Communication between project managers and warehouse manager Warehouse Manager Material placed in organized manner, and tracked in system Easy system to find correct material PM's Order Same Material to Two DIfferent Jobs, Causing Delays. PM Wastes Time Looking for Material; Stops Driver Delivers Excess Material Does the Driver Have Another Immediate No Set Material in Semiorganized Spot in Warehouse Project Manager Looks for Certain Material in Warehouse Does the Manager Find the Material He is Looking For? Leaves Note for Driver to Deliver Material to Certain Jobsite yes Yes no PM Doesn't See Material That He Needs, but is Actually There Dump Material in Most Convenient Spot and Leave for Delivery Return from Delivery or Material Never Gets Organized Project Manager Orders More Material from Supplier Driver Delivers Material to Jobsite Description Clock Distance Time Task Time Wait Time Driver Delivers Excess Material 30 Miles 32 min. 32 min. . Does the driver have another immediate delivery? No 32 min. If yes . . . . Dump material in most convenient spot . . . . Return from Delivery . . . . If no . . . . Set Material in semi-organized location 50 ft. 92 min 1 hr. . Project manager looks for material in warehouse 100 ft. 112 min. 20 min. . Does he find the material? Yes 112 min. If no . . . . PM orders material from supplier . . . . If yes . . . . PM leaves driver note 5 ft. 114 min 2 min 120 min. Driver delivers material 15 miles 254 min. 20 min. . Observations 0. Manager wandered Warehouse for a while 0. Driver does not notice note for a while Project Name: Warehouse Material Tracking Output Metric: Finding Material Date/Time Material Type Material Found Comment 10/20/2014Mixed Some More than half was found 10/21/2014Metal Studs No 10/21/2014Finishing Materials Yes 10/21/2014Metal Studs No 10/23/2014Acoustical Grid Some 10/23/2014Finishing Materials No 10/24/2014Metal Studs Some Less than half was found More than half was found Yard Storage Warehouse Storage Back Office • Data Points • Time taken searching for material. • Whether or not a PM asked the Warehouse manger for help? • Did the PM find all the material they were looking for? METHODS MANPOWER MATERIALS Bringing back material Warehouse manager Construction materials Manager available Organizing right away Manager arrives to work on-time Setting material in disorganized manner Lots of material Many different types of material Material Organization Snow or Rain Truck working properly Time taken to find material Very cold Forklift working properly MACHINE ENVIRONMENT Truck and forklift Weather MEASUREMENT • According to the data: • The communication between the Project Managers and the Warehouse manager does not show a correlation between how long or if the material is found. • Whether or not the material is found shows a correlation between how much time is spent looking. If the material is not available, then the Project Manager spends more time looking than if the material is found right away. • The KPIV that causes the most problems with the KPOV is the lack of a system that keeps track of available material within the warehouse. • This is shown by the increased time spent looking for material that is not available in the warehouse. • If there was a list available, then the Project Manager could easily look at the list and determine if what he needs is in the warehouse or not without wasting time looking for it. Solution Matrix KPOV(s): Material placed in an organized and tracked. Solutions Full Time Material Manager Weekly Excel File Visible to All Meetings KPIVs: KPIV #1 Communication 4 8 6 KPIV #2 Tracking System 8 3 9 Total Impact 16 12 9 Cost 10 8 1 6 4 8 Success Criteria Likelihood of Success • Have warehouse manager make a list of material brought back or taken away. • Have office secretary input list into Excel file visible to one project manager. Date: 12/1/201 4 Process: What's Process Step Controlled? Control Input or Output? Spec. Limits / Measureme Control Requireme nt Method Method nts Sample Size Frequency Who/What Measures Review Frequency/ Corrective Action Make List Material List Input List all material Manual Run Chart 100% Per Occurrence Warehouse manager Weekly Friday 9:00 AM Input Material List Document Into Document Input List All mateiral Manual Run Chart 100% Per Occurrence Secretary Weekly Friday 9:00 AM Use document to Find search Material material list Output 3 min. or less Per Occurrence Project Manager Weekly Friday 9:00 AM Manual Run Chart 100% • Allowing other Project Managers to access the document • Fill them in on the process • Total of 5 Project Managers • Costs: • Time of warehouse manager • Time of secretary • Benefits: • Saves money on material costs • Saves Project managers time • Helps facilitate emergency material deliveries