www.zenonmed.com
PROBLEMS ENCOUNTERED
Lack of grossing station
Ventilation problems
Inappropriate storage conditions of tissues
Preparation and usage problems of laboratory chemicals
Hazardous waste management
Representative View for an Inappropriate
Laboratory
STEPS FOR SOLUTION
Grossing Station
Central Ventilation System
Ventilated Storage Cabinet
Fully Automated
Preparation and Usage of Chemicals
Monitoring of
Formaldehyde and Xylene
Neutralization of Hazardous Waste
Meet OSHA
Standards
SOLUTION STEP 1
GROSSING STATION
Grossing Station










All stainless steel construction, ANSI 304
Working table is made of stainless steel, ANSI 316
All functions work by both photo sensors and buttons
Formalin faucet and sink
Backdraft and/or downdraft ventilation removes fumes safely
Lit directly to the working area
Photo sensors controls for cold and hot water faucet
Water jet controlled by button and sensor for washing work area
Formalin sink is connected to a seperate waste tank
Magnifier, magnetic bar, paper towel dispenser, medical glove box
holder, meausuring rule, heavy-duty disposal unit
 The device has safety features such as electrical leak relay, circuit
breaker, emergency stop button and isoloted grounding plug
 Optional accessories
Grossing Station
Grossing Station
Grossing Station
SOLUTION STEP 2
CENTRAL VENTILATION
SYSTEMS
Central Ventilation Systems
It is possible to collect the problem in two headlines:
 Lack of ventilation system
 Insufficient ventilation system
• Separete exhaust ventilation for each grossing station
• Charcoal filter
• Inaccurate vacuum and blow
Central Ventilation Systems
The main points of a proper ventilation system:




Installation of a central ventilation system
Detached system
Proper aspiration
Correct engineering calculations and application
Central Ventilation Systems
FALSE
CORRECT
Merkezi Havalandırma
Click to edit text styles
Edit your company slogan
SOLUTION STEP 3
VENTED STORAGE CABINET
Vented Storage Cabinet






All stainless steel construction, ANSI 304
Adjustable perforated shelves
Fixed or telescopic shelf structure
Sliding or standard door
Liquid collector
Connection with ventilation system or separete exhaust
Vented Storage Cabinet
SOLUTION STEP 4
Fully Automated
Preparation and Usage of Chemicals
Exposure of Formaldehyde
 During dissection practice
 Preparation of formaldehyde from
paraformaldehyde
 Preparation of formalin
 Transfer of tissue into formalin
 Transfer of waste formalin into waste tank
 Spill of formalin
Exposure of Formaldehyde
 During dissection practice
 Preparation of formaldehyde from
paraformaldehyde
 Preparation of formalin
 Transfer of tissue into formalin
 Transfer of waste formalin into waste tank
 Spill of formalin
Exposure of Formaldehyde
 Obtain ready to use formalin
 Use an preparation machine
Ready to Use Formalin
Advantages
 Less exposure compared to
the manuel applications
 Much more standardized in
comparison to preparation by
manually
 Turnaround times for valueadded work
Disadvantages
 High costs
 Transportation needed to the
lab frequently
 Risk of formalin sediment in the
package
 Storage problems
Automated Formalin Preparation
and Dispensing System
Advantages
 Significant reduction in costs
 User safety :Avoid inhaling or
having contact formaldehyde
 Consistency
 Obtaining formalin directly from tap
 Odorless working enviroment
 Real time monitoring of pH
Disadvantages
 Initial investment needed
FormaDose







The first fully automated device in the market
10% factory set or used defined dosing options
Monitoring the level of formalin on the screen
Precise dosing in every time
Automatic and manual mixing functions
Real time monitoring of pH
Screw filler cap to add salts for preparation buffred 10%
formalin
 Connection to the grossing stations
Exposure of Xylene
 While working with staining and coverslipping
instruments
 During manuel staining and coverslipping practice
 During the replacement of tissue processor’s
solutions
FUME HOOD
INSTRUMENT
VENTILATION CABINET
INSTRUMENT VENTILATION
CABINET
Project Designing
Visit
Examine
Get Results
Project
Design
Application
Project design
Click to edit text styles
Edit your company slogan
Projelendirme
Central Ventilated Unit
Click to edit text styles
Edit your company slogan
Customized Solution for Your
Laboratory

Workbenches
You can create flexible work spaces by
benches which we produced by using
stainless steel, laminate, acrylic
or stoneware specific to your needs in
accordance with characteristics of the
chemicals used in laboratories.

Custom Design Work Tables
Work tables designed for use in
laboratories which have narrow work
environment will facilitate your work by
functional solutions.

Cabinets with Shelves
It is possible to create a laboratory
environment that is up to standard and
in order with rack systems according to