PROFILE Integrated Water Resources Development & Management Water Supply Schemes Project Management Consultancy Technical Assistance Distribution Net –work for Irrigation Projects Integrated Water Resources Development.
Download ReportTranscript PROFILE Integrated Water Resources Development & Management Water Supply Schemes Project Management Consultancy Technical Assistance Distribution Net –work for Irrigation Projects Integrated Water Resources Development.
PROFILE Integrated Water Resources Development & Management Water Supply Schemes Project Management Consultancy Technical Assistance Distribution Net –work for Irrigation Projects Integrated Water Resources Development & Management Go to s-8 Water Supply Schemes Axum Water Supply Schemes Ethiopia Project Management Consultancy, Completion and Operation of Sangola Branch Canal Project Management Consultancy World Bank Aided Hydrology Project-II Implementing Agencies States 1. Andhra Pradesh 5 5 12 8 4 2 10 2. Chhattisgarh 3. Goa 4. Gujarat 5. Himachal Pradesh 6. Kerala 7. Karnataka 8. Madhya Pradesh 9. Maharashtra 10. Orissa 11. Pondicherry 12. Punjab 13. Tamilnadu Central Agencies 1 3 1. 7 5 13 11 MoWR 2. CWC 3. IMD 4. CPCB 5. CGWB 6. NIH 7. CWPRS 8. BBMB Index Map DISTRIBUTORY NO. 11 From Km 0.00 to Km 4.635 TAKING OFF @ Km 32.700 OF GAURAVELLI RIGHT MAIN CANAL It is the science which deals with occurrence ,movement and distribution of water upon ,over and beneath the earth surface .It is in the form of cycle and known as hydrological cycle S-8 It is the fall of water in various forms on the earth from the atmosphere. It is in the form of rain , snow, hail, and dew Air contains gases/such as Nitrogen, Hydrogen, Oxygen , Co2, and Water vapors TYPES OF PRECIPITATION 1.Convective 3.Trough 2.Orograpic 4.Cyclonic The discharge measurement Measuring stream stage Current Meter The stage-discharge relation A Stream Gauging I. Stage Gauging How Stream flow is Measured II. Stage Discharge Curve III. Discharge IV. inflow B Tank Table Data Inflow=Final storage – Initial storage + spills + withdrawals Hydrological Analysis for different catchments in Bagh sub basin Sr. No 1 2 3 4 5 Catchment Up to Sirpur Up to Kalisarar Up to Pipriya Below Pipriya Remaining catchment Area 437.6 Bagh Catchment Sirpur Homoginity Inflow Data R-R Equation Weightage Deori 0.13 Bonde 0.11 July R =0.542*P -94.13 R =0.542*P -94.13 Sirpur 0.76 August R = 0.608* P -82.54 R = 0.608* P -82.54 September R= 0.720 *P -39.28 R= 0.720 *P -39.28 October R = 0.298 *P +1.37 R = 0.298 *P +1.37 Annual R= 0449*P-201.90 R= 0449*P-201.90 Sirpur Tank Data Month Modeling Generated series June R = 0.214 * P -14.79 R = 0.214 * P -14.79 133.42 234 303.54 1674.44 Sirpur Homoginity 7 Rainfall Data R.G. 2783 Sirpur 0.95 Pipriya 0.05 Pipriya Pipriya 1 1 Kalisarar Tank Data GDS at Pipriya Homoginity June R = 0.121 *P -8.367 R = 0.121 *P -8.367 July R = 0.429 * P -80.49 R = 0.429 * P -80.49 August R = 0.557 *P -67.09 R = 0.557 *P -67.09 September R = 0.720 *P -38.57 R = 0.720 *P -38.57 October R = 0.095* P + 4.66 R = 0.095* P + 4.66 Annual R=0.414*P-153.00 R=0.414*P-153.00 June R = 0.154 * P -16.29 R = 0.154 * P -16.29 R = 0.955 * P -233.80 July R = 0.955 * P -233.80 August R = 0.421 *P -99.46 R = 0.421 *P -99.46 September R = 0.395 * P +5.099 R = 0.395 * P +5.099 October R = 0.497 * P + 1.956 R = 0.497 * P + 1.956 Annual R=0.566*P-373.00 R=0.566*P-373.00 June R = 0.154 * P -16.29 with upper July R = 0.955 * P -233.80 pripriya August R = 0.421 *P -99.46 September R = 0.395 * P +5.099 October R = 0.497 * P + 1.956 Annual R=0.566*P-373.00 June R = 0.214 * P -14.79 Gondia 0.50 Homoginity Rengapar 0.03 with Sirpur July R =0.542*P -94.13 Deori 0.16 catchment August R = 0.608* P -82.54 Sirpur 0.09 September R= 0.720 *P -39.28 Pipariya 0.22 October R = 0.298 *P +1.37 Annual R=0.545*253.80 Summation of Monthly Inflows of up to sirpur, upto Kalisara, Up to Pipriya, Below Pipriya and remaining catchment with sirpur Homoginity Annual Interceptions in minor tanks, K.T. Weirs and Ex Malgujari Tanks C.A. Sr. No Catchment Sqkm 1 up to Sirpur 437.6 up to Kalisarar 2 Interception Rate Monsoon Yield(Mm3) Mm3/Sqkm Average 50% Intercept yield (Mm3) 75% Average 50% 75% Total Yield Mm3 Type MI Tanks KT wairs (68) Mm3 7.884 Average 50% 75% Ex Mal Gujari Tanks 3.183 Total 11.07 0.0253 189.6 194 154 11.067 11.3 8.969 200.637 205 162.609 0.31 0.305 0.0023 50.34 50.1 40.7 0.305 0.3 0.247 50.645 50.4 40.937 0 90.52 84.7 60.1 0 0 0 90.52 84.7 60.1 0.0276 117.4 110 78 8.38 7.83 5.564 125.8 118 83.524 MI Tanks KT wairs (5) 133.42 Ex Mal Gujari Tanks Total Eastern Bagh up to Pipriya 3 MI Tanks and KT wairs (21) 234 Eastern Bagh below Pipriya 4 0 0 Ex Mal Gujari Tanks(13) 303.54 Remaining Catchment 5 8.38 8.38 MI Tanks and KT wairs (201) 1674.44 161.1 Ex Mal Gujari Tanks(653) 6 Total Total 48.69 209.7 0.1253 684 683 511 209.74 209 156.8 893.78 893 668.127 Total 229.5 0.0825 1128 1121 836 229.492 228 170.1 1357.54 1349 1006.16 2783 Post monsoon inflows Sr.No Catchment 26 a) Up to Sirpur b) Up to Kalisarar c) Up to Pipriya Ariea Station 437.60 1.Deori 1280 2.Bonde 0.13 0.11 3.Sirpur 0.76 1343 1324.9 1272.05 133.42 1.Sirpur 2.Pipriya 234 1.Pipriya d) Below Pipriya 303.54 1.Pipriya e) Remaining catchment 1674.4 1.Gondia f) Bagh Sub basin Waighte Annual Weight Mansoon Post Post d Rainfall( ed Rainfall Mansoo Monsoon mm) Rainfall (mm) n Runoff (mm) Rainfall Annual (mm) 1343 0.05 1348 1343.3 1279.63 1.00 Post Mansoon Yield Avg. 50% 75% 189.57 193.51 153.6 50.33 50.14 40.69 90.52 84.59 Avg. 50% 75% Annual Yield Avg. 50% 75% 1249 0.95 1.00 Mansoon Yield 1348 1348.0 1341.95 1348 1348.0 1341.95 0.50 1127.07 2.Rengapar 0.03 1280 3.Deori 0.16 1280 4.Sirpur 0.09 1343 5.Pipariya 0.22 1348 1224.1 1214.56 2783 a) Up to Sirpur 0.16 1324.88 b) Up to Kalisarar 0.05 1343.3 c) Up to Pipriya 0.08 1348 d) Below Pipriya 0.11 e) Remaining 0.60 52.83 0.014 *** 0.030 63.64 0.015 *** 0.031 6.05 0.001 *** 0.030 6.05 0.001 *** 0.030 9.54 0.003 *** 0.030 5.74 5.86 4.65 195.31 199.37 158.29 1.583 1.577 1.280 51.91 51.72 41.97 60.1 2.72 2.54 1.803 93.24 87.13 61.90 117.42 109.73 77.96 3.52 3.29 2.34 120.94 113.02 80.30 684.04 683.25 511.3 20.52 20.50 15.34 704.56 703.75 526.68 19.5 0.005 *** 0.030 1128.05 1120.64 836.1 33.97 33.75 25.18 1162.02 1154.39 861.25 1348 1224.10 1269.6 1250.14 Annual Yield Bagh Sub Basin Catchment C.A Monsoon Yields Avg 50% interception 75% Avg Post Monsoon flows 50% 75% Avg Total Flows 50% 75% Avg 50% 75% a) Up to Sirpur 437.6 189.57 193.51 153.64 11.07 11.3 8.97 5.61 5.73 4.55 206.25 210.54 167.16 b) Up to Kalisarar 133.4 50.33 50.14 40.69 0.31 0.3 0.25 1.54 1.53 1.24 52.18 51.97 42.18 234 90.52 84.59 60.1 0 0 0 2.72 2.54 1.8 93.24 87.13 61.9 d) Below Pipriya 303.5 117.42 109.73 77.96 8.38 7.83 5.56 3.52 3.29 2.34 129.32 120.85 85.86 e) Remaining 1674 684.04 683.25 511.34 209.74 209.5 156.77 20.52 20.5 15.34 914.3 913.25 683.45 f) Bagh Sub basin g) Yield Rate Mm3/Sq.Km 2783 1128.05 0.405 1120.64 0.403 836.07 0.3 229.49 0.082 227.98 0.082 170.08 0.061 33.8 0.012 33.58 0.012 25.05 0.009 1391.34 0.5 1382.2 0.497 1031.2 0.371 c) Up to Pipriya Sub basin Bagh R R Modeling for Water Availability Sr. No Sub basin Catchmen Rain Gauge Station t Area SqKm Name Weightage Bagh a) Up to Sirpur 1.Deori 2.Bonde 3.Sirpur GDS /Tank Table Data GDS Tank Table 0.13 0.11 0.76 437.60 Weighted Rainfall mm Sirpur June July August September October Annual b) Up to Kalisarar STD Cv 95% 90% 75% 60% 50% Max Min Average STD Cv 230.10 420.13 399.34 175.29 47.18 120.22 133.64 130.17 110.01 49.47 0.52 0.32 0.33 0.63 1.05 98.38 229.42 256.36 62.95 0.00 98.60 256.30 284.23 72.07 0.46 131.50 349.21 324.00 99.78 18.01 160.92 377.00 349.70 130.31 27.74 228.83 427.19 371.85 151.47 34.46 R = 0.214*P – 14.79 R = 0.542P- 94.13 R = 0.608*P – 82.54 R = 0.720*P – 39.28 R = 0.298*P +1.367 33.94 118.68 150.37 121.82 22.98 0.81 0.00 26.84 0.00 0.60 15.08 58.92 70.13 38.69 6.75 11.26 30.71 34.63 33.76 6.45 0.75 0.52 0.49 0.87 0.96 75% 60% 50% 2.74 2.76 5.84 13.22 19.60 41.63 32.09 39.50 50.08 2.65 5.52 14.25 0.60 0.66 2.95 2252.31 752.58 1272.05 316.58 0.25 901.54 1000.28 1064.77 1202.68 1281.75 R= 0.499*P-201.90 398.50 66.87 189.57 R = 0.121*P – 8.367 6.59 0.09 R = 0.429*P- 80.49 25.81 0.00 95% 90% 8.60 48.22 56.92 23.87 4.22 14.96 60.13 62.81 30.53 5.09 71.64 0.38 103.71 119.85 153.64 164.42 193.51 2.70 2.18 0.81 0.13 0.39 0.78 1.52 2.82 13.01 7.26 0.56 0.62 3.38 9.41 11.30 13.31 74.53 236.68 135.17 0.57 77.40 93.12 117.48 163.38 243.94 2.Pipriya 0.05 July 638.54 137.38 412.35 132.18 0.32 195.94 246.69 352.27 384.68 420.26 August 741.58 234.78 403.60 148.20 0.37 244.87 280.74 328.86 335.99 350.22 46.16 8.50 21.04 11.01 0.52 9.27 11.92 15.51 16.02 17.06 September 460.42 11.36 179.90 116.40 0.65 70.72 74.02 93.86 125.48 168.46 R = 0.720*P -38.57 39.08 0.00 12.35 10.89 0.88 1.84 1.95 3.87 6.91 11.05 0.00 47.10 11.03 29.09 32.67 R = 0.095*P + 4.66 3.15 0.62 1.22 0.73 0.60 0.62 0.63 0.77 0.99 1.04 50.33 20.53 0.41 24.77 25.96 40.69 44.01 50.14 Kalisarar 1.00 234 Pipriya 1.00 Homoge neity with Upper Pipriya 303.54 2783 Average 477.25 1.Gondia 0.50 2.Renga par 0.03 e) Remainin 3.Deori g 1674.4 4.Sirpur catchmen t 5.Pipariy a f) Bagh Sub basin Min 77.79 134.74 236.63 13.10 0.00 June 1.Pipriya d) Below Pipriya Max 431.57 674.07 700.94 441.21 171.60 0.95 133.42 26 R-R Model 1.Sirpur 1.Pipriya c) Up to Pipriya Yield (Mm3) Month 0.16 0.09 0.22 Homoge neity with Sirpur catchme nt R = 0.557*P – 67.09 October 199.57 57.29 1.22 0.00 0.51 Annual 2274.52 726.84 1279.63 345.59 0.27 886.12 905.75 1062.00 1196.39 1293.16 R= 0.414*P-153 101.71 15.72 June 463.00 45.20 239.96 130.64 0.54 55.65 101.83 144.25 192.96 243.25 R = 0.154*P – 16.29 12.87 0.00 5.04 4.42 0.88 0.00 0.04 1.39 3.14 4.95 July 838.80 210.60 424.79 181.55 0.43 211.55 237.70 302.13 362.08 395.05 R = 0.953P- 233.80 132.34 0.00 40.88 39.49 0.97 0.00 0.00 12.67 26.04 33.39 August 773.80 229.20 410.96 153.01 0.37 246.49 253.88 310.30 349.04 382.90 52.96 0.00 17.25 15.03 0.87 1.04 1.74 7.30 11.11 14.45 September 604.40 29.00 220.71 161.94 0.73 29.95 42.69 94.55 165.60 182.90 57.06 3.87 21.59 14.97 0.69 3.96 5.14 9.93 16.50 18.10 0.00 45.53 0.00 0.00 0.00 14.12 18.30 27.21 0.46 5.75 7.50 1.30 0.46 0.46 0.46 2.10 2.59 195.03 27.79 90.52 43.82 0.48 35.40 51.95 60.10 70.57 84.59 16.70 0.00 6.54 5.73 0.88 0.00 0.05 1.80 4.08 6.43 R = 0.953P- 233.80 171.68 0.00 53.03 51.22 0.97 0.00 0.00 16.43 33.77 43.31 68.69 0.00 22.37 19.50 0.87 1.35 2.25 9.46 14.41 18.74 74.01 5.02 28.01 19.42 0.69 5.14 6.67 12.88 21.40 23.48 0.59 October 230.00 64.45 1.42 Annual 1957.80 793.30 1341.95 291.46 0.22 June 463.00 45.20 239.96 130.64 July 838.80 210.60 424.79 181.55 August 773.80 229.20 September 604.40 29.00 0.00 931.15 1098.24 1190.23 1309.80 1364.90 0.54 55.65 101.83 144.25 192.96 243.25 0.43 211.55 237.70 302.13 362.08 395.05 410.96 153.01 0.37 246.49 253.88 310.30 349.04 382.90 220.71 161.94 0.73 29.95 42.69 94.55 165.60 182.90 45.53 0.00 0.00 0.00 14.12 R = 0.421*P – 99.46 R = 0.395*P +5.099 R = 0.497*P + 1.956 R=0.566 *P -373 R = 0.154*P – 16.29 931.15 1098.24 1190.23 1309.80 1364.90 R = 0.421*P – 99.46 R = 0.395*P +5.099 R = 0.497*P + 1.956 R=0.566 *P -373 0.49 57.07 93.10 139.19 189.74 228.56 R = 0.214*P – 14.79 128.08 0.00 54.47 0.68 0.00 9.29 25.11 43.22 57.13 0.40 176.59 211.07 285.71 336.95 398.15 R = 0.542P- 94.13 543.18 0.00 194.76 140.35 0.72 2.89 33.94 101.68 148.18 203.72 387.33 159.63 0.41 223.32 250.51 285.16 337.03 367.96 R = 0.608*P – 82.54 604.03 21.83 256.11 162.51 0.63 89.15 116.82 152.10 204.91 236.40 184.12 122.43 0.66 40.33 74.76 107.28 121.05 147.18 R = 0.720*P – 39.28 566.60 0.00 158.31 145.06 0.92 0.00 27.70 63.56 80.17 111.67 36.28 11.99 19.49 26.36 R = 0.298*P +1.367 57.88 2.52 20.39 2.69 3.58 12.01 15.44 R= 0.499*P-201.90 684.04 305.05 0.45 297.98 363.04 511.34 628.50 683.25 October 230.00 64.45 1.42 Annual 1957.80 793.30 1341.95 291.46 0.22 June 426.56 35.34 218.70 107.99 July 772.19 171.09 388.12 154.86 August 729.07 157.20 September 524.53 36.94 0.46 18.30 October 111.40 33.60 0.93 0.79 2.59 Annual 2167.87 735.25 1214.56 325.05 0.27 779.02 828.77 1067.91 1134.40 1196.59 June 432.21 52.92 228.81 111.15 0.49 62.69 97.28 144.37 208.93 230.26 July 762.46 171.29 399.80 150.22 0.38 225.07 237.03 294.10 342.78 430.19 August 720.67 232.85 388.13 139.39 0.36 242.45 265.93 301.92 335.12 358.78 September 523.17 41.64 192.24 124.88 0.65 47.51 58.44 110.02 146.48 165.29 0.27 41.16 15.16 24.88 30.39 October 114.27 36.19 0.88 0.48 1.64 Annual 2146.80 810.65 1250.14 307.93 0.25 836.21 944.54 1108.98 1191.76 1202.41 35.29 0.59 7.46 9.72 1.30 0.59 0.59 2.72 3.35 252.99 36.05 117.42 56.84 0.48 45.92 67.39 77.96 91.54 109.73 37.27 1533.69 172.24 195.99 2.85 85.56 Summation of 358.80 Monthly Inflows of 991.72 0.00 up to sirpur, upto 900.14 117.64 377.81 Kalisarar, Up to Pipriya, Below 858.62 13.71 263.39 Pipriya and 113.07 4.79 42.48 Remaining catchment with Sirpur Homoginity 2481.91 458.41 1128.05 16.77 58.58 0.82 0.68 72.96 85.66 58.41 83.42 160.77 260.65 382.41 223.25 0.59 141.93 184.77 241.80 289.09 336.09 220.21 0.84 19.11 41.32 115.73 171.98 194.23 34.20 4.96 30.36 259.52 0.72 0.81 3.29 8.27 14.09 37.47 5.91 18.48 27.92 477.86 0.42 526.31 589.63 836.07 993.71 1120.64 Godavari Khore in Maharashtra Water Availability Sr.No Sub Basin C.A. Weighted Average Rainfall (mm) Yield Water Availability Remark Max Min Mean Std CV 75% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Upper Godavari Pravara Mula Middle Godavari Manjara Terna Lendi Manar Dudhana Purna Kayadhu Penganga SudhaSurvarna Pus Aurnavati Bembala Wardha Venna Irahi Andhari Nagg Kolar Kanhan Pench Vainganga Bagh Gadhavi Khobragadi Pranhita Indravati Ground Surface 50% Avg Yield Mm3 Rate Mm3/Sq km Yield Mm3 Rate Mm3 /Sqk m Yield Mm3 75% Total Avg Dept Rate Yield Rate Yield Rate Yield Rate h Mm3 Mm3 Mm3 Mm3 Mm3 Mm3 Mm3 mm /Sqk /Sqk /Sqk /Sqk m m m m 17482.00 1290.40 423.57 760.5 217.73 0.29 2670.31 0.15 3459.01 0.20 3900.24 0.22 Monthely 3170.65 1590.16 2496.36 1182.34 1526.91 1396.52 423.24 364.49 563.50 709.47 770.86 794.559473 181.6709 277.55 222.6331 0.26 0.36 0.28 319.09 328.1153 291.1875 0.10 0.21 0.12 428.91 404.53 420.17 0.14 0.25 0.17 470.85 438.74 418.66 0.15 0.28 0.17 Fort nightly Fort nightly Fort nightly 2179.84 13577.00 1755.77 552.21 998.06 316.69 0.32 349.06 6054.66 0.16 0.45 709.16 7728.05 0.33 0.57 693.63 7968.46 0.3 0.6 Yearly Yearly 1911.58 4688.42 1758.21 1546.6 282.37 435.9 895.77 923.9 370.02 270.9 0.42 0.3 596.14 603.29 0.3119 0.1287 808.45 1120.33 0.4 0.2 880.63 1395.2 0.5 0.3 5673.77 1289.13 528.70 915.61 197.63 0.22 965.03 0.17 1189.21 0.2 1223.16 0.22 Monthely 2783.00 1558.83 1851.60 3181.36 5345.76 2146.7988 1873.113 2459.3708 1739.7944 2013.5569 810.65 712.51 1086.97 888.05 1072.65 1250.14124 1146.65723 1518.18843 1335.21903 1430.14506 307.934 233.769 433.741 251.7033 252.8457 0.25 0.20 0.29 0.19 0.18 836.07 481.5127 612.2613 1191.548 2350.884 0.30 0.31 0.33 0.37 0.4398 1120.64 613.44 698.1398 1600.128 2676.82 0.40 0.39 0.38 0.50 0.50 1128.05 648.60 775.83 1502.39 2855.51 0.41 0.42 0.42 0.47 0.53 Monthely Monthely Monthely Monthely Monthely Water Supply Schemes Axum Water Supply Schemes Ethiopia Rain fall data availability chart Sr,No Station 1960 1 Axum 1970 1980 1990 1963 2000 2010 1981 1993 2005 2 Adwa 1963 1981 1992 2005 3 Endalasse 1963 1981 1992 2005 4 Abi Adi 1971 1982 1995 2005 5 Adigrat 1971 1982 1994 2005 6 AdiGudom 1971 7 Ambagiworgis 1965 8 Aykel 1965 9 Dambat 10 Debark 11 Gonder 1988 1993-1996 1970 1988 1970 1988 1997 2004 1993 2004 2004 1971 1988 1992 1961 2005 1992-1996 14 Ibnat 1972 15 Lalibela 1973 2002 1990 1989 1960 2005 1961 1992-1997 18 Samre 1971 1982 19 Sekota 1971 1982 20 Wukro 1971 21 Zarima 2004 1965 13 Humera 17 Metema 2005 2004 12 Hawzen 16 Mekele 1991 1999 2005 1988 1991 1970 NOTE 2004 1988 Data is available Data is not available 2005 2002 2004 Monthly Rainfall Histogram at Axum Month June July Average (mm) 78.1 215 192 60.5 31.4 6.3 1.1 5.2 2.2 17.1 29.4 39 Maximum(mm) 167 428 442 125 161 13 28 53 25 130 26 122 14 23 7 0 0 0 0 0 0 0 0 Minimum(mm) 85 August September October November December January February March April May 470 460 450 440 430 420 410 400 390 380 370 360 350 340 330 320 310 300 290 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 max average min Histogram For Monthly Metrological Parameter At Adwa Month June July August September October November December January February March April May A.TEMp.oC 28.5 24.7 23.94 26.38 28.09 27.49 27.26 27.38 29.3 26.98 30.39 30.84 A.Humidity(%) 52 73.67 80.67 59.57 38.17 32.17 29.67 23.83 21.17 27.17 34.33 32.33 Wind velocity(m/s) 1.56 1.56 1.46 0.98 1.03 0.96 0.88 1.14 1.41 1.73 1.55 1.52 A.Humidity Temp. 40 30 20 10 0 T… 100 80 60 40 20 0 A.H… Wind velocity 2 1.5 1 0.5 0 Wind velocity Gauged discharge data of Ayehida near Axum Ser No. Stage (m) Velocity (m/s) Area (m)2 Discharge (m3 /s) 1. 1.52 0.27 0.981 0.265 2. 1.30 0.25 0.64 0.16 3. 0.47 0.14 0.436 0.06 4. 0.29 0.10 0.35 0.035 5. .012 0.004 0.025 0.001 The discharge at 0.10 m is zero and therefore zero of gauge (Ho) is considered as 0.1 m. The stage discharge curve is developed as Q= K (H-Ho )n Where = Q = discharge in m3 /sec K = constant Recommended R-R models for monthly and annual flow estimation Sn Month Recommended R-R Model r² 1 June R = 0.077P + 1.444 0.72 2 July R = 0.088P - 0.8301 0.7863 3 August R = -0.000P2 + 0.31P - 13.84 0.639 4 September R = 0.0005 P2 - 0.0143P + 9.0613 0.2466 5 October y = 0.0375P + 5.0323 0.2683 6 November R = 0.248P + 3.8361 0.5395 7 December R = 0.1025 P2 - 2.759P + 7.3878 0.3771 8 January R = -0.0143 P2 + 0.4139P + 7.1084 0.4802 9 February R = -0.1879 P2 + 1.7993P + 4.8043 0.1359 10 March R = -0.1477 P2 + 1.4071P + 5.3598 0.0867 11 April R = 0.0012 P2 - 0.1204P + 7.8332 0.0544 12 May R = 0.0012P2 - 0.1204P + 7.8332 0.7471 13 Annual R = -0.0005 P2 + 0.6222P - 81.516 0.1538 Summery of the estimated flow parameters at Maychew Dam site (Mm3) June July Aug. Sept Oct. Nov. Dec Jan. Feb Mar. Apr May Annual Hypothetical Annual Actual Mean. 1.24 3.02 7.64 1.37 1.03 .90 1.11 1.23 .83 .72 .96 1.06 21.11 21.10 Max 2.38 6.13 20.48 1.49 1.84 3.65 1.68 1.69 1.52 1.45 1.30 2.63 46.24 32.82 Min. 0.42 1.11 00 2.22 0.84 0.64 0.38 0.0 0.0 0.0 0.70 0.80 7.11 11.84 50 1.19 2..94 6.67 1.38 0.99 0.68 1.23 1.18 0.8 0.89 0.96 0.96 16.93 21.49 60 1.10 2.45 5.74 1.35 0.96 0.68 1.23 1.18 .80 0.79 0.85 0.92 18.05 18.44 75 0.96 2.29 4.09 1.31 0.86 0.64 1.23 1.18 0.80 0.0 0.76 0.86 14.98 16.84 90 0.64 1.47 2.70 1.27 0.84 0.64 0.38 1.18 0.80 0.0 0.71 0.8 11.43 15.02 95 0.50 1.40 1.87 1.25 0.84 0.64 0.38 1.18 0.68 0.0 0.71 0.8 10.25 14.37 Reservoir sedimentation Sr.no Method Rate(m Area Capacity Curve for Maychew Dam 3/sqkm /yr) (ii) (iii) (iv) (v) (VI) Jenson Painter 1900 Log (s) = -2.032 + 0.1 Log (D) – 0.31 Log (A) + 0.75 log (H) + 1.104 log(P)+ 0.368 log (T) – 2.324 log (V)+ 0.786 log (G) Longbein &Shum 223 125 ton/sqkm/yr with a mean annual rainfall of 740 mm. Flaming Qs = aqwn 2541 Borkena Dam 1375 3 observed as 1375 m /sqkm/yr Direct Measurement 434 reported sedimentation rate as 434 m3/sqkm /yr. Maria Shito 468 3 5260 tons/mm / yr. y = -0.0009x2 + 0.0758x + 0.1057 R² = 0.9826 2 1.8 1.6 1.4 area(Mm2) (i) Area capacity curve area capacity curvve 1.2 1 Poly. (area capacity curvve) 0.8 0.6 0.4 0.2 0 0 50 capacity(Mm3) Projected Demand for Axum Town Year Population Annual(Mm3) Total Demand 1 75614 1.55 1.70 2 78994 1.82 2.00 3 82535 2.12 2.34 4 86238 2.30 2.53 5 90116 2.47 2.72 6 94178 2.66 2.92 7 98059 2.85 3.13 8 102102 3.05 3.36 9 106311 3.27 3.59 10 110696 3.50 3.85 11 115265 3.75 4.12 12 119780 3.85 4.24 13 124474 4.12 4.53 14 129354 4.40 4.84 15 134426 4.70 5.17 16 139700 5.02 5.52 17 144889 5.35 5.89 18 150273 5.71 6.28 19 155858 6.08 6.69 20 161655 6.49 7.13 21 167668 6.91 7.60 22 173555 7.35 8.09 23 179653 7.82 8.60 24 185968 8.31 9.15 25 192505 8.84 9.72 26 199275 9.40 10.34 27 205871 9.97 10.97 28 212688 10.58 11.63 29 219733 11.22 12.34 30 227014 11.89 13.08 31 234538 12.61 13.87 32 234538 12.61 13.87 33 234538 12.61 13.87 34 234538 12.61 13.87 35 234538 12.61 13.87 36 234538 12.61 13.87 37 234538 12.61 13.87 38 234538 12.61 13.87 39 234538 12.61 13.87 40 234538 12.61 13.87 41 234538 12.61 13.87 42 234538 12.61 13.87 43 234538 12.61 13.87 44 234538 12.61 13.87 45 234538 12.61 13.87 46 234538 12.61 13.87 Reservoir sizing Annual Deficit Chart 0.8 Annual Deficit Chart 0.7824 04533 1.5 0.7 0.6 0.5 Deficit 0.4 Mm3 0.3 0.2 0.1 0 Col… 0.1702 0.1667 21937 78492 1 Deficit Mm3 0.5 0 0000000000000000000000000000000000000000000 1 6 1116212631364146 Years 1.0297 77686 0.6510 06854 0.4247 C… 75227 0000000000000000000000000000000000000000000 1 6 1116212631364146 Years Synthetic Unit Hydrograph for Maychew Dam site Sn Description Value 1 Length of the main stream(L)(Km) 28 2 Length of the main stream near the centroid(Lc) from out fall(Km) 17.46 3 CachimentareaKm2) 166.3 4 coefficient depend on theretation and storage characterstics(Cp) 0.93 Hr 0 2 6 12 24 32 5 Coefficient depend on the characterstics(Cl) 0.5 Discharge (m3/s) For 3.42 cm rain fall 0 18.85 28.27 37.7 28 18.9 6 Basin Lag (Tp)(hr) 11.4 Discharge (m3/s) for 2cm rain fall 0.0 11.0 16.5 22.0 16.5 11.0 7 Unit duration (Tr)(hr) 2.073 8 Peak Discharge (Qp)(m3/s) 37.7 SUH Ordinates 2 Hour Duration 2hr duration 3.42 cm… 40 9 Peak Discharge (qp)per unit area(m3/s) 0.227 10 Base period(T)( days) 4.425 11 Weidth fifty(W50)(hr) 29.3 12 Weidth seventy five(W75)(hr) 16.75 13 Slop 0.017 14 exponential index(n) 0.38 15 time of concentration(hr) 4 30 20 10 0 0 50 100 150 S curve and Unit Hydrograph Maychew Dam site S-curve ordinates S-Curve Shi S-curve 500 400 300 200 100 0 0 50 hours M3/s UH-1 25 20 15 10 5 0 100 150 UH-2 + 0 20 40 60 Hours 80 100 120 Axum storm Analysis year Maximum Rain Fall in Day 1992 67.8 1993 30 1994 56.5 1995 34.2 1996 89.2 1997 35.2 1998 77 1999 50 2000 115.4 2001 66.4 2002 23.4 2003 2004 Maximum of Maximum rain Fall Maximum One day Rain fall at Axum for Various return Period Return Period TY k(constant) P(mm) in a day P(mm)in24 hours rain 20 2.970195 2.012486 106 121.51 50 3.901939 2.82066 126 144.89 39.9 100 4.600149 3.426272 141 162.41 49 500 6.213607 4.82575 176 202.89 2005 53 1000 6.907255 5.427405 192 220.29 2006 70.4 10000 9.21029 7.425007 242 278.07 2007 62 100000 11.51292 9.422257 292 335.85 2008 16.3 PMS 13.81551 11.41947 342 393.62 Average 55.04117647 STD 25.15318218 CV 0.456988455 115.4 Discharge(m3/s) Flood Hydrograph for different R.P Maychew Dam site 800 700 600 500 400 300 200 100 0 "20--234""" """50"" -- 275" ""1000""--407" ""10000""--508" 0 50 100 Hours 150 """1000000""--710" Design Flood The following standards are used for Design floods. 1. Indian Standards •Spillway Design:- SPF for dams having storage capacity up to 60 Mm3 or dam height up to 30m and PMF for dams having storage capacity more than 60mm3or dam height more than 30m •Coffer dam:- 5 years return flood or construction period whichever is higher. 2. ICE (Institute of Civil Engineers, GB) • Spillway design :a.Reservoir at full supply level and 10000 year return period or 0.5 PMF which ever is higher is impinging for standard condition where over topping is not permitted. b. Reservoir at full supply level and 10000 year return period or 0.3 PMF whichever is higher for non standard condition where over topping is rarely permitted •Coffer dam •20 years return period. As per Indian standard the design flood shall be PMF that is 710.82 m3/s as dam height is more than 30m. The design flood shall be 508.62m3/s as it is more than half the PMF. However it is recommended that the design flood shall be considered as 710.82m3/s because: •It is the water supply project evolving high risk •There is no substantial difference between PMF and 10000 year return period flood •Being on safer side Flood Routing for Maychew Dam Spillway length 85m,Return Period 10000& PMF years planning scenario 50 year and out flow rating curve Sn Elevation Head Discharge 1 1685 0 0 2 1686 1 179 3 1687 2 505 4 1688 3 928 5 1689 4 1428 6 1690 5 1996 7 1691 6 2623 8 1692 7 3306 9 1693 8 4039 10 1694 9 4820 11 1695 10 5645 B Sn 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Elevation 1685 1686 1687 1688 1689 1690 1691 1692 1693 1694 1695 Storage Integration Curve Routing time=1 hours Storage O/2 S/t S/T+O/2 Outflow 10.29 0 2858.721 2859 0 11.18 89 3104.924 3194 179 12.10 252 3361.13 3614 505 13.06 464 3627.178 4091 928 14.05 714 3902.69 4617 1428 15.08 998 4188.471 5186 1996 16.14 1312 4484.531 5796 2623 17.24 1653 4789.907 6443 3306 18.37 2019 5102.883 7122 4039 19.53 2410 5425.42 7835 4820 20.73 2822 5759.247 8582 5645 6000 Flood Routing 5000 y = 0.9837x - 3010.6 3000 2000 1000 Series1 0 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 600 500 400 300 200 100 0 -100 0 Discharge(m3/s) 4000 Infl ow 50 100 Time(hr) 150 Spillway Analysis 50 year planning scenario Sn Spillwa y length( m) PMF 1 40 2 Inflow(m3 /s) 10000 year return period flood Half PMF MWL(m) Inflow(m3 /s) 710.82 Out flow(m3/ s) 698 MWL(m) Inflow(m3 /s) Out flow(m3/s ) MWL(m) 508.62 Out flow(m3/ s) 499 1689.1 1688.28 355.41 349 1688.54 508.62 501.4 1687.84 355.41 350.40 698.8 1687.97 508.62 499.9 1687.38 355.41 349.23 705 1687.5 508.62 505 1687.00 355.41 352.9 1687.5 8 1687.2 3 1686.8 7 1686.5 8 50 710.82 700.8 3 65 710.82 4 85 710.82 100 year planning scenario Sn Spillwa y length( m) PMF 1 40 2 Inflow(m3 /s) 10000 year return period flood Half PMF MWL(m) Inflow(m3 /s) 710.82 Out flow(m3 /s) 698 MWL(m) Inflow(m3 /s) Out flow(m3/ s) MWL(m) 508.62 Out flow(m3 /s) 499 1689.1 1688.28 355.41 349 1687.5 8 50 710.82 700.8 1688.54 508.62 501.4 1687.84 355.41 350.40 1687.2 3 3 65 710.82 698.8 1687.97 508.62 499.9 1687.38 355.41 349.23 1686.8 7 4 85 710.82 705 1687.5 508.62 505 1687.00 355.41 352.9 1686.5 8 comparison for various length of spillway for Maychew dam plannig senario for 50 years and crest of dam/ FSL1685 10000 inflow in out flow length m3/s in m3/s Sn PMF inflow in out flow m3/s in m3/s MWL MWL Half PMF inflow in out flow m3/s in m3/s MWL 1 40 508 499 1688.28 710 698 1689.1 355.41 2 50 508 501 1687.84 710 700.8 1688.54 3 65 508 500 1687.38 710 698.8 1687.99 4 85 508 505 1687 710 705 1687.5 MWL(m) SPILLWAY FLOOD ROUTING 1689.5 1689 1688.5 1688 1687.5 1687 1686.5 1686 1685.5 1685 10000RTF PMF Half PMF 0 50 100 SPILL WAY LENGTH(M) 349 1687.58 355.41 350.4 1687.23 355.41 349.23 1686.87 355.41 352.9 1686.58 comparison for various length of spillway for Maychew dam plannig senario for 100 years and crest of dam/ FSL1689 10000 Sn inflow in m3/s length PMF out flow in m3/s inflow in m3/s MWL out flow in m3/s inflow in m3/s MWL out flow in m3/s MWL 1 40 508 495 1692.26 710 691 1693.08 355.41 345.8 1691.57 2 50 508 498 1691.82 710 695.8 1692.53 355.41 347 1691.22 3 65 508 501 1691.38 710 700.1 1691.97 355.41 350.1 1690.87 4 85 508 502 1690.99 710 702 1691.49 355.41 350.1 1690.57 MWL(m) SPILLWAY FLOOD ROUTING 1689.5 1689 1688.5 1688 1687.5 1687 1686.5 1686 1685.5 1685 10000RTF PMF Half PMF 0 50 100 SPILL WAY LENGTH(M) Dam Design Parameters Sr.N Description Unit 50 year planning scenario 100 year planning scenario 1 2 River bed level m 1650 1650 Dead Storage Mm3 4.08 7.85 3 Dead storage level m 1676 1682 4 Live storage Mm3 6.21 6.21 5 FSL M 1685 1689 6 Design flood m3/s 710.82 710.82 40 length and 4m flood lift Spill way 7 a) gated m b) un gated Remark 40 length and 4m flood lift Initially crest at RL 1689 and Initially crest at RL 1685 and installation installation of 4m high gates in next of 4m high gates in next phase phase 65 m length and 3m flood lift with solid crest at 1685 65 m length and 3m flood lift with solid crest at 1689 MWL 8 a) gated m b)Un gated 1689 1693 1688 1692 1991 1695 1690 1694 Top of dam RL 9 a)Gated m b) un gated 10 Out lets level for demand drawl m One at 1676 and another at 1682 One at 1676 and another at 1682 11 Silt scour sluices levels m 1651 1651 Out let for demand drawl may also be designed as scour sluice Recommended Proposal It is recommended that •Planning scenario as 100 years •Dead storage at RL 1682 m •Spill way length 40m with crest at RL 1689m in initial phase •Installation of 4m high gate over the crest in next phase •Demand drawls at RL 1676 and 1682m which will function as scour sluices also •River scour sluices at RL 1651 •Dam top RL 1695m These parameters shall be used for designing the project. Project Management Consultancy, Completion and Operation of Sangola Branch Canal Special Problems in SBC Project The situation specific problems which compel the need for TAMC Services are as follows: a) Import and Use of Modern canal lining Technology from USA for carrying out the canal lining under water for the continuously flowing NRBC through out the year b) Restrictions on use of natural sand and its replacement by crushed sand including concrete mix designs c)Strong opposition from the farmers in existing established perennial irrigation belt under the pretext of adverse effects on their established economy as canal lining will reduce water supply to their established irrigation cropping pattern. This concerns vitally and needs intensified efforts in this regard, to make a dialogue with concerned farmers through frequent and consistent persuasion for eradicating the fear of concerned farmers, and d)Regular and frequent (at least bimonthly or quarterly) review meetings of all concerned participants and stake holders by competent catalyst Agency for proper coordination and monitoring in light of above (a),(b) & (c) Flow Chart Start Literature Review Collection of data Compilation, analysis & Preparing monitoring network in consultation with MKVDC Presentation before Competent Authority Follow up and Feed back Yes Is It Complete ? End No Annexure 1.2 Sangola Branch Canal ProjectFinancial Completion Programme as on March. 2012 (Rs. in crores) 2012-13 Sr. No. Description of component 1 2 I Main Canal & Branches A Main Canal 1 Land Acquisition 2 Earthwork 3 Lining 4 Structures B Branch Canal 1 Land Acquisition 2 Earthwork 3 Lining i) Branch No. I of NRBC ii) Branch No. III of NRBC iii) Sangola Branch Canal (Br. V) iv) Major distributories on NRBC Total lining 4 Structures II Distributories & Minors 1 Land Acquisition 2 Earthwork 3 Lining 4 Structures Grand Total 2013-14 Balance as on 31/03/12 Jun-12 Sep-12 Dec-12 Mar-13 Jun-13 Sep-13 Dec-13 Mar-14 3 4 4 6 7 8 9 10 11 Performance Domain In Place Lining Prototype Project Coachella Canal Imperial Country California Cross Section of Coachella Canal Paver CONSTRUCTIO ACTIVITIES Earthwork Trimming Discharging Water And Dredge Cuttings Equipment Position In- Place Lining Lining Upstream Vs Downstream Pressure Plates- Computer Monitoring Pvc Guide System Concrete Quality Control Concrete Conveyance System Concrete Joint Construction Concrete Slump Variations Concrete Mix Design Work Berm Elevation Of Canal Surface Water Slope Requirement Asian Development Bank (TA 47017- India) Support for National Action Plan for Climate Change – National Water Mission Final Report- June 2011 Sub Basins a)Lower Sutlej Sub basin in Punjab b)Kshipra Sub Basin In Madhya Pradesh and c)Cauvery Delta Sub basin in Tamilnadu . Recommendation for formulation of “ Special Project Agency” closely with water sector agencies, local authorities and civil society associated in water sectoral development of State. ( Ref: Paragraph 318 of Report. Special Project Agency for Sangola Branch Canal Project ( Proposed) i) Hon. Member of Parliament of SBC area - Chairman ii) Hon. M.L.A. of SBC area - Member iii)Hon. M.L.C. of SBC area - Member iv)Chief Engineer WRD Of SBC area - Member v)Bhama Consultancy Services - Member Secretary Project Management Consultancy World Bank Aided Hydrology Project-II Implementing Agencies States 1. Andhra Pradesh 5 12 8 4 2 10 2. Chhattisgarh 3. Goa 4. Gujarat 5. Himachal Pradesh 6. Kerala 7. Karnataka 8. Madhya Pradesh 9. Maharashtra 10. Orissa 11. Pondicherry 12. Punjab 13. Tamilnadu Central Agencies 1 3 1. 7 5 13 11 MoWR 2. CWC 3. IMD 4. CPCB 5. CGWB 6. NIH 7. CWPRS 8. BBMB HIS Manuals and Guidelines Volume Subject 1 HIS Component 4 Hydrometeorology b) Field Manual Part I - Network Design & Site selection a) Design manual b) Field Manual Part II - TOR & HDUG Part II - River stage curve Part III - Flood Management Part IV - Current meter gauge Part V - Field application and ADCP Part III - Data need assessment Part VI - Slope area method Part VII - Field application and audits c) Reference manual Part VIII - Maintenance & Calibrations Part I - Job Description 2 3 Sampling Principles a) Design manuals Design Manuals Hydrometery a) Design manuals 5 6 b) Field Manual Sediment Transport Measurement Water Quality Sampling c) Reference manual a) Design manuals b) Field Manual c) Reference manual a) Design manuals b) Field Manual Part I - Network Design & Site selection 7 Water Quality Analysis a) Design manuals Part II - SRG O&M 8 Operation Manual Part III - ARG O&M Part II - Secondary validation Part III - Final Processing and analysis Part IV - FCS - O&M Part V - Field maintenance, Audit and calibration Reference Manual b) Operation manual Part I - Data Entry and primary validation 9 Part IV - Data management Data transfer storage & a) Design manuals dissemination b) Operation manual Present HIS Status Sr.NO 1 2 3 4 5 6 Subject Hydrometry activity Volume 4 - Field Manual Part II - River stage observation Observation DWLR's pressure sensor types are not working and some of them are beyond the repairs and replacement Rectification Recently advance instruments are being procured and proper care is being taken while procuring such advance instruments to avoid the past repetition The stages are recorded by staff gauges in absence of DWLR and appropriate note to that effect Is recorded in that register. Hydrometry Volume 4 - Field Manual Cableway arrangement for current meter The velocity observation measurements are taken by Part IV - Current meter gauge observations are not functioning and float and note to that effect is recorded in the therefore velocity measurement by register. current meter are not done Hydrometry Volume 4 - Field Manual part II - River Stage discharge curve have been stage curve established Data processing and Volume 8 - Part I - Data Entry and Data Entries are made at the Sub It shall be done on a weekly basis which Field officers analysis Primary validation Divisional Data centre after collection of have agreed to practice in next monsoon the data for a month. Data processing and Volume 8 - Part I - Data Entry and Tank table data (Outflow discharge, Uniform and requisite format for receiving and analysis Primary validation Withdrawals, Spillage details etc) for 18 entering the data shall be developed. reservoir site is available. However data entry has not been done as received data is not in uniform and prescribed format. Data processing and analysis Volume 8 - Part III - Final processing and analysis Data processing and analysis Volume 8 - Part II - Secondary validation Hydrological balance and accounting, Hydrological modeling have not started yet The hydrological data was sent to CWC for inter agency validation. The comments / comments have been received however validated data for incorporating in the dissemination have not been received. Data transfer storage and dissemination Value 9 - Operational manual The nature of the available Hydrological data has been uploaded on website. HIS Volume 1 - Part II - TOR and HDUG Publication - State and District level 495 HDUG have been registered. Water year book for usage of water resource planning have been published. The information regarding floods have also been published This will be tried for Eight Identified sites shortly. A joint meeting of CWC and implementing agencies for finalizing the issue. The data itself shall be posted on the website. Levels of operation Level-1 Level-2 Level-3 division Level-4 Level-4 division Level -5 Level-6 Office Level-7 Office Level-8 Level-9 Observer Checker Supervision At field level Field Sectional Engineer Sectional Engineer in sub Supervision In charge Sub-Divisional Engineer Sectional Engineer in In charge Data center Executive Engineer Sectional Engineer in Circle Data center Executive Engineer in Circle Data center Head Superintending Engineer Chief Engineer HP Decision Support System - Planning (DSS-P) States Issues Andhra Pradesh (Middle Godavari Basin) Combined management of reservoir and water transfers Providing water for all sectors considering the increasing demands Balancing head-end and tail-end abstraction along irrigation canals Crop selection and corresponding water requirement Chhattisgarh (Upper Mahanadi Basin) Tank operation in dry years Conjunctive use of surface and ground water Gujarat (Mahi Basin) Increased efficiency of water management in general Combined operation of reservoir in dry, normal and flood conditions Demonstrate benefits of changes in cropping pattern Support decision on canal lining Improving conditions for the population in drought prone areas Karnataka (Palar Basin) Reduced periods of inundation in low-sloping command areas Drought management Indentifying recharge areas Determining impacts of over exploitation of GW Karnataka Fertilizer pollution of groundwater (Tungabhadra Water logging at head-end and scarcity Command area) at tail-end canals Kerala (Bharathapuza Basin) Efficient management of water resources Suitable water management in dry years Potential hydropower production The impact of GW of measure to mitigate the effect of sand mining Environmental flows Madhya Pradesh Assessment of water resources (Wainganga availability Basin) Assess the impact on water availability from infrastructure rehabilitation Increased efficiency of water management in general Crop selection, particularly in dry years Maharashtra (Bhima Basin) The project area is severely drought prone and GW over exploited Increasing competition between domestic and agricultural water demand Evaluating reservoir operation to minimize the effect of drought Evaluating reservoir operation to minimize the effect of flooding Assessing the water pollution on Ujjain from upstream irrigation, municipal and industrial waste Orissa Conjunctive use in irrigated area Mitigating water logging through increased GW pumping Changing cropping pattern The impact of inter-basin transfer or additional surface storage Tamil Nadu (Agniyar Baisn) Severe water shortage and competing sectors Inter-basin transfer of water to Agniyar basin Determining impacts of over exploitation of GW Tamil Nadu (Tamirparani Basin) Multipurpose multi reservoir operation River pollution Drought management in some area Tamil Nadu (Vaippar Basin) Severe water shortage and competing sectors Inter-basin transfer Conjunctive use Water quality problems CPCB Has selected Brahmani River as case study under DSS (P) as water quality is emerging in this basin and may become severe in near future. Present DSS (P) Status The DSS (P) component is under implantation with: •DHI Water Environment Health / Consultant providing and customizing the soft ware •State Implementing Agency by formulating the objectives /scenarios and providing the information and data required for it and •NIH as a catalyst agent for effective technology transfer. It appears that Consultant desires prominent and major role of state implementing Agency for using the already prepared and proofed software where as state implementing Agency desires to tailor the software as per the required objectives /scenarios of the state implementing Agency. NIH is silent observer being a non technological and policy domain. Thus there appears to be a large grey area and causing hindrance in synchronizing and achieving the integrated effective outcome. It is therefore necessary to have a third party intervention right from now to till the completion of the assignment and TAMC will be the appropriate agency for it. However it needs appropriate approval and sanction of competent authority and shall be processed accordingly HDA 1 Assessment of Water Resources Potential- Availability/ Yield Assessment This study has been developed to estimate the water yield series at any point of interest across the stream or any other point at different levels of dependability. There may be three different cases for which water yield estimation may be needed viz; •Gauged Catchment (all data with desired length available) •Partially Gauged Catchment (all data with partial length, partial data with full length or discontinued data is available) •Ungauged Catchment (No data within study area available) Keeping in view the above aspects, all the methodologies with proper provision of data consistency tests, filling and missing gaps, extension of series (rainfall & runoff, runoff- runoff or any other combination etc.) on different time steps has to be developed for all the data scenarios as stated above. This includes synthetic generation of yield series of desired length (40-50 years). HDA 2 Estimation of Design Flood Estimation of the design flood is essential for the safety aspects of various components or water resources projects. The HDA 2design aid will include all the standard approaches (method, time projection, structures category and downstream hazard classification (if applicable)) for design flood estimation for different purposes. Here also three scenarios may exist. •All hydro-meteorological records within project catchment are available; •Partially observed data of that catchment and / or reasonably defined records at neighboring catchments; and •No observed data are available. HDA 2 will incorporate all approaches currently being followed in India (hydrometeorological, statistical and regional) with possible improvements and also in conjunction with internationally used methodologies. The design flood value should be chosen on the basis of critical comparison of results of two or three best methods, including standardized methods. HDA 3 Tools identified in The HDA 3 comprises of seven tools which cover two legacies and five in-house developed software. A data storage software for local storage of various data viz. spatial, location, time series and relational will be provided. Under HDA 3 following tools/ design aids will be developed for sediment rate estimation and its distribution in a proposed project. 1.Development of software tools for covering procedures for assessing silt rates using observed silt data or reservoir resurvey data. 2.Providing design aid in the form of regional sedimentation rates for the seven zones of India using the observed silt inflow data and the reservoir resurvey data. 3.Developing regional models for sediment yield using the procedure proposed by Garde and Kothyari (1987), for seven identified regions within seven zones of India. 4.Development of procedures and interfaces to use spatially distributed model MWSWAT for determination of sediment yield from various sub areas using spatial nature of the analysis. 5.Trap efficiency of any reservoir is presently estimated using Brune Curve. The software tools will be developed to use these relations or the revised relations which are proposed to be developed using Indian sediment inflow and reservoir resurvey data. 6.Sediment Distribution pattern in proposed reservoirs is at present estimated using Empirical Area reduction method. The software tools will be developed to use these procedures. Indian reservoir survey data will be utilized to develop relationships for predicting sediment distribution pattern in reservoirs. 7.1-D numerical models are used for assessing sediment transport and deposition in rivers and reservoirs. It is proposed to develop software interface for using HEC-RAS model in situations where necessary data is available. The data required for the sedimentation studies will be the discharge and silt data observed at various gauging sites along with the physiographic details, geology, soil and land use in the catchment as also the reservoir resurvey data of the existing reservoirs in the area. Interfaces with HDA will be developed for various data storage software, data processing and data validation software which are being used such as HYMOS, SWDES, WISDOM and WRIS. The HDA is proposed to have Open Ml interface, which will facilitate interlinking with all Open Ml complaint software. PDS Component PDS No PDS Title Agency Stets SW-CH-1 Study of reservoir sedimentation, impact assessment and development of catchment Area treatment Plan for Kodar reservoir DK. Sonkusale EEWR & GW Survey circle Raipur R. Gaikata NIH Second Interim Report Jun-2011 SW-CH-2 Water availability Study & supply demand analysis in Seonath Sub-basin SW-GJ-2 SW-GJ-3 SW-GJ-4 SW-Kn-1 SW-MH-1 SW-NIH-1 SW-NIH-3 SW-NIH-4 DK. Sonkusale EEWR & GW Survey circle Raipur R. Gaikata NIH Study of WQ fluctuations in River Vishavamitri CE & Dir.GERI Mr. K.L. Dave Study of trends in WQ of locations identified as CE & Dir.GERI hot spots Mr. K.L. Dave Monitoring of WQ fluctuations in River CE & Dir.GERI Sabarmati Mr. K.L. Dave Study of water samples in Southern Karnataka CE Hyd.Wat.Res. Dept but PI is Shri H.K. Nagrag KERS Optimization of G & D stations network of Shri Gosavi Maharashtra CE HP Nashik & R.K Niturkar CWPRS Integrated approach for snow melt runoff and Dr. Sanjay Jain & Dr. Sharad Jain effect of Anthropogenic activities in Beas Sub- NIH Roorkee basin Hydrological assessment un gauged catchments Dr. P.K. Bhunya NIH Roorkee (small catchments) in Mahanadi Sun-basin Orissa Second Interim Report Jun-2011 Urban Hydrology for Chennai City (Tamil Nadu) YR Satyji Rao NIH Roorkee Report under preparation and awaited Draft Final Report January -2011 Draft Final Report January -2011 Draft Final Report January -2011 Final Report under preparation Report is to be obtained from CWPRS Final Report March2011 Report under preparation and awaited GOVERNMENT OF ANDHRA PRADESH IRRIGATION & CAD DEPARTMENT FLOOD FLOW CANAL PROJECT SRSP ALIGNMENT PROPOSALS AND HYDRAULIC PARTICULARS OF DISTRIBUTORY NO. 11 From Km 0.00 to Km 4.635 TAKING OFF @ Km 32.700 OF GAURAVELLI RIGHT MAIN CANAL SUBMITTED TO:EXECUTIVE ENGINEER DIVSN., JANAGAON Contractors M/s S.E.L.-G.K.C. (Joint Venture) 503, Prashanthi Ram Towers, Yella Reddy Guda Main Road, Ameer Pet, Hyderabad. Prep. By : SAI ENGINEERS, PUNE 411052 Index Map DISTRIBUTORY NO. 11 From Km 0.00 to Km 4.635 TAKING OFF @ Km 32.700 OF GAURAVELLI RIGHT MAIN CANAL REPORT CONTENTS DISTRIBUTORY 11 (D-11)OF RIGHT MAIN CANAL OF GOURAVALLY RESERVOIR. 1) General 2) Benefited Villages & Mandals 3) Design Considerations and design Calculation of Canal a) Duty adopted:b) Change of Canal section c) B/D Ratio d) Critical velocity ratio (V/Vo) e) Hydraulic Particulars f) Fixing of sill level 4.0 PROPOSED ALIGNMENT OF DISTRIBUTORY – 11 (D 11) 4.1 INTERSECTION POINTS AND CURVES: 4.2 PREPARATION OF ALIGNMENT PLANS: 4.2 PREPARATION OF ALIGNMENT PLANS: 4.3 CANAL CROSS SECTION (Typical) 4.4 CROSS MASONRY WORKS 4.5 CROSS DRAINAGE WORK 5.0 L/S OF CANAL 6.0 PREPARATION OF INDEX MAP 7.0 LAND ACQUISITION PLANS AND SCHEDULES 8.0 STATEMENTS & DRAWINGS: 9.0 CONCLUSION Report - Accompaniments REACHE STATEMENT REACH WISE : •H.P’s STATEMENT •DESIGN OF CANAL SECTIONS •DROPs •CROSS MASONARY WORKS •CROSS DRAINAGE WORKS •KILOMETRES WISE PLAN & L/S SHEETS •TYPICAL SECTION Pipewise(Out Letwise) Ayacut Register of Distributory 11 @Km 32.700 of Gouravelly Right Canal . (Reach VII ) Sr. No. Discription of Out Let(Pipe) Location of DP (Offtake Point) Area Under Ayacut Km Acres Remarks 1 OT Of M-1 L 0.025 527.68 Reach I 2 OT Of M-2 R 0.025 197.42 Reach I 3 OT Of M-3R 1.200 192.83 Reach II 4 OT Of M-4L 1.725 265.29 Reach III 5 OT Of M-5L 2.900 198.44 Reach IV 6 OT Of M-6R 2.900 370.57 Reach IV 7 OT Of M-7L 3.850 293.79 Reach V 8 OT Of M-8R 3.850 224.17 Reach V 9 OT Of M-9L 4.635 384.18 Reach VI Tail Minor 4.635 1624.52 Reach VI Total 4278.88 Pipewise(Out Letwise) Ayacut beneficiries of Distributory 11 @Km 32.700 of Gouravelly Right Canal. (Reach VII ) NAME OF OUTLET DY 11 -M 1 L@Km 0.035 DPR-1 SR.NO Village SY. NO. Total Extent As Area under Chak Extent Under Chak Phani Deductions UC Wet(Magani) Village Tank Dry Ayacut in Chak Acre Gunta % Acre Acre Acre Acre Acre Acre 3 4 5 6 7 8 9 10 11 13 Name of Ayacutdar 1 2 1 Chilpur 579 8 29 55 4.80 0.00 0.00 0.00 0.00 4.80 Katherasala Ayeliah 2 Chilpur 574 15 24 20 3.12 0.00 0.00 0.00 0.00 3.12 Damara Rajaiah 3 Chilpur 573 3 35 90 3.49 0.00 0.00 0.00 0.00 3.49 Narageni Venkata Rao 4 Chilpur 572 7 32 5 0.39 0.00 0.00 0.00 0.00 0.39 Damara Buchaiah 5 Chilpur 545 7 28 90 6.93 0.00 0.00 0.00 0.00 6.93 DameraBhucchaiah s/o Komraiah 6 Chilpur 547 2 1 60 1.22 0.00 0.00 0.00 0.00 1.22 Damera Bhucchaiah s/o Komraiah 7 Chilpur 549 5 15 5 0.27 0.00 0.00 0.00 0.00 0.27 BurraKattaiah 8 Chilpur 580 8 1 75 6.02 0.00 0.00 0.00 0.00 6.02 Katherasala Ayeliah 9 Chilpur 536 0 20 100 0.50 0.00 0.00 0.00 0.00 0.50 Kattherasala Ilaiah s/o Komraiah 10 Chilpur 535A 6 28 80 5.36 0.00 0.00 0.00 0.00 5.36 Devulapalli Laxmaiah s/o Mallaiah 11 Chilpur 537 3 1 100 3.03 0.00 0.00 0.00 0.00 3.03 Kattherasala Ilaiah 12 Chilpur 538 18 19 100 18.48 0.00 0.00 0.00 0.00 18.48 Kattherasala Ilaiah Komraiah 13 Chilpur 539 10 20 100 10.50 0.00 0.00 0.00 0.00 10.50 Thota Rajaiah s/o Laxmaiah 14 Chilpur 540 5 31 100 5.78 0.00 0.00 0.00 0.00 5.78 Gade Komraiah s/o Veeraiah 15 Chilpur 541 4 36 100 4.90 0.00 0.00 0.00 0.00 4.90 Pittla Narsaiah s/o Pullaiah 16 Chilpur 543 3 25 100 3.63 0.00 0.00 0.00 0.00 3.63 Thota Rajaiah s/o Narsaiah 17 Chilpur 535 6 28 90 6.03 0.00 0.00 0.00 0.00 6.03 Devulapalli Laxmaiah s/o Mallaiah 318 15 1 5 0.75 0.00 0.00 0.00 0.00 0.75 319 12 0 10 1.20 0.00 0.00 0.00 0.00 1.20 366 2 26 10 0.27 0.00 0.00 0.00 0.00 0.27 367 22 10 15 3.34 0.00 0.00 0.00 0.00 3.34 89.97 0.00 0.00 0.00 0.00 89.97 (4+(5/40))*6/100 18 19 20 21 Kristagigud a Kristagigud a Kristagigud a Kristagigud a 14 .=7-8-9-10-11 Putta Harikishan Reddy Welsula Gattaiah Gandla Mallaiah Gandla Mallaiah Hydraulic Particulars For Distributory 11 @Km 32.700 of Gouravelly Right Canal (Reach VII ) Reach Name /Reach From -To ( in Km) 1 Ayacut REACH I From Km REACH II From Km 0.030 REACH III From Km 0.0 to Km 0.030 to Km 1.205 1.205 to Km 1.730 REACH IV From Km 1.730 to Km 2.905 REACH V From Km 2.905 to Km 3.780 REACH VI From Km 3.780 to Km 4.635 4278.884 3553.785 3360.953 3095.661 2526.659 2008.70 1727.385 1434.663 1356.817 1249.718 1020.012 810.91 2 Duty 115.000 115.000 115.000 115.000 115.000 115.00 3 Discharge (Qr) 1.054 0.875 0.828 0.762 0.622 0.495 4 Bed Width (B) 1.600 1.500 1.500 1.400 1.300 1.200 5 Bed Fall (S) 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 6 Rugosity Coefficient (n) 0.025 0.025 0.025 0.025 0.025 0.025 7 Full Supply Depth (FSD) 0.80 0.75 0.70 0.70 0.650 0.600 8 Free Board 0.300 0.300 0.300 0.300 0.300 0.300 9 Side Slopes (s) 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 10 Wetted Area (A) 2.240 1.969 1.785 1.715 1.479 1.260 11 Wetted Perimeter (P) 4.485 4.205 4.024 3.924 3.644 3.364 12 R=A/P 0.499 0.468 0.444 0.437 0.406 0.375 13 R^2/3 0.630 0.603 0.582 0.576 0.548 0.520 0.504 0.482 0.465 0.461 0.439 0.416 14 Velocity (V)=(1/n)*r^(2/3)*sqrt(1/S) 15 Design Discharge (Qd) 1.128 0.950 0.831 0.790 0.648 0.524 16 Critical velocity (Vo)=Vc =c*d^0.52 0.472 0.456 0.440 0.440 0.424 0.406 17 C=Constant=0.53 18 V/Vo 1.067 1.057 1.057 1.046 1.035 1.023 19 B/D ratio 2.00 2.00 2.14 2.00 2.00 2.00 Hydraulic Particulars For Distributory 11 @Km 32.700 of Gouravelly Right Canal (Reach VII ) REACH VI From Km 3.780 to Km 4.635 3.6= TBL Width Design Calculations Ayacut 3= FSL Width = 2008.70 Acres or 811 Hectares 115 acre/cusec Duty Discharge (Qr) = 0.495 Cumecs Bed Width (B) = 1.200 m Bed Fall (S) = 1 in 2500 Rugosity Coefficient (n) = 0.025 for unlined canal as per CE, CDO guidelines Full Supply Depth (FSD) = 0.600 m Free Board = 0.300 m Side Slopes (s) = 1 in 1.5 Wetted Area (A) = 1.260 Sq.m. Wetted Perimeter (P) = 3.364 Sq.m. R=A/P = 0.375 Sq.m. R^2/3 = 0.520 Velocity (V)=(1/n)*r^(2/3)*sqrt(1/S) = 0.416 m/s Design Discharge (Qd) = 0.524 cumecs Critical velocity (Vo)=Vc =c*d^0.52 = 0.406 m/s V/Vo = 1.02 0.9<V/Vo<1.1. Hence OK B/D ratio = 2.00 OK 0.6m 1 1.5 1.20 5.91% cushion 0.512 C=Constant=0.53 for unlined canal as per CE, CDO guidelines CROSS MASONRY WORKS For Distributory 11 @Km 32.700 of Gouravelly Right Canal .(Reach VII ) From Km 0.0 to Km 7.139 STATEMENT SHOWING THE CROSS MASONRY WORKS S. DESCRIPTION NAME OF CROSSING No. CHAIN EXISTING ROAD BED F.S.D. IN KM. LEVEL WIDTH IN M. IN M. HYDRAULIC PARTICULARS OF CANAL IN M. B.L F.S.L. LOSS T.B.L. OF U/S D/S U/S D/S U/S D/S HEAD 1 CT CROSSING SLPC-1/1678m 1.678 370.525 1.50 0.70 369.154 369.154 369.854 369.854 370.154 370.154 0.000 2 CT CROSSING SLPC 2/2600m 2.600 365.884 1.40 0.70 364.785 364.785 365.485 365.485 365.785 365.785 0.000 3 CT CROSSING SLPC-3/3750m 3.750 361.574 1.30 0.65 360.125 360.125 360.775 360.775 361.075 361.075 0.000 4 CT CROSSING SLPC-4/4600m 4.600 356.408 1.20 0.60 355.385 355.385 355.985 355.985 356.285 356.285 0.000 REMARKS CROSS DRAINAGE WORKS For Distributory 11 @Km 32.700 of Gouravelly Right Canal .(Reach VII ) From Km 0.0 to Km 7.139 STATEMENT SHOWING THE CROSS DRAINAGE WORKS S.NO. TYPE OF CHAINAGE C.D.WORK IN Km PARTICULARS OF DRAIN PARTICULARS OF PARENT CANAL LOSS OF BED LEVEL C.A. M.F.D O.M.F.L BED WIDTH F.S.D C. B.L F.S.L T.B.L HEAD MTS SQ.KMS. CUMECS MTS MTS MTS MTS MTS MTS IN MTS. Nil REMARKS Hydraulic Particulars For Distributory 11 @Km 32.700 of Gouravelly Right Canal .(Reach VII ) Reach in Km. From Km 0.0 to Km 7.139 BED LEVEL HYDRAULIC PARTICULARS DISTAN REQUIRED BED CE DISCHARG WIDTH in (m) E in m in (cumec) S.No FROM TO 1 0.000 0.025 25 1.054 2 0.025 0.030 5 1.054 F.S.D in m SURFACE FALL 1.60 0.80 1 in 2500 1.60 0.80 1 in 2500 FULL SUPPLY LEVEL DESIG NED DISCH SIDE VELOCITY ARGE AT START AT END AT START AT END SLOPES in m/sec in (cumec ) REACH I From Km 0.0 to Km 0.030 1 in 1.5 0.504 1.128 381.825 381.815 382.625 382.615 1 in 1.5 381.815 381.813 382.615 382.613 0.030 0.125 0.200 0.300 0.375 0.525 0.675 0.850 0.125 0.200 0.300 0.375 0.525 0.675 0.850 1.200 11 1.200 1.205 1.205 1.375 1.500 1.678 1.375 1.500 1.678 1.725 16 1.725 1.730 1.730 1.900 2.050 2.200 2.600 2.850 1.900 2.050 2.200 2.600 2.850 2.900 23 2.900 2.905 2.905 2.925 3.525 3.650 3.750 2.925 3.525 3.650 3.750 3.775 29 3.775 3.780 3.780 4.050 4.325 4.500 4.600 4.635 4.050 4.325 4.500 4.600 4.635 4.635 0.010 0.000 0.000 0.010 0.025 0.002 0.050 0.000 0.052 0.025 0.000 0.062 0.038 0.030 0.040 0.030 0.060 0.060 0.070 0.140 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.000 2.000 1.500 1.500 1.500 1.000 1.000 0.000 1.038 2.030 1.540 1.530 1.560 1.060 1.070 0.140 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.002 0.050 0.000 0.052 0.025 0.470 0.050 9.500 10.020 95 75 100 75 150 150 175 350 0.875 0.875 0.875 0.875 0.875 0.875 0.875 0.875 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 0.482 0.482 0.482 0.482 0.482 0.482 0.482 0.482 5 0.875 1.50 0.75 1 in 2500 1 in 1.5 0.482 0.950 371.845 371.843 372.595 372.593 170 125 178 47 0.828 0.828 0.828 0.828 1.50 1.50 1.50 1.50 0.70 0.70 0.70 0.70 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 0.465 0.465 0.465 0.465 REACH III From Km 1.205 to Km 1.730 0.831 371.843 371.775 372.543 372.475 0.831 370.775 370.725 371.475 371.425 0.831 369.225 369.154 369.925 369.854 0.831 369.154 369.135 369.854 369.835 0.068 0.050 0.071 0.019 0.000 0.000 0.000 0.000 1.000 1.500 0.000 0.000 1.068 1.550 0.071 0.019 0.025 0.025 0.025 0.025 5 0.828 1.50 0.70 1 in 2500 1 in 1.5 0.465 0.831 0.002 0.000 0.000 0.002 0.025 0.210 0.000 2.500 2.710 369.135 369.133 369.835 369.833 170 150 150 400 250 50 0.762 0.762 0.762 0.762 0.762 0.762 1.40 1.40 1.40 1.40 1.40 1.40 0.70 0.70 0.70 0.70 0.70 0.70 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 0.461 0.461 0.461 0.461 0.461 0.461 REACH IV From Km 1.730 to Km 2.905 0.790 369.133 369.065 369.833 369.765 0.790 367.565 367.505 368.265 368.205 0.790 366.005 365.945 366.705 366.645 0.790 364.945 364.785 365.645 365.485 0.790 364.785 364.685 365.485 365.385 0.790 363.685 363.665 364.385 364.365 0.068 0.060 0.060 0.160 0.100 0.020 0.000 0.000 0.000 0.000 0.000 0.000 1.500 1.500 1.000 0.000 1.000 0.000 1.568 1.560 1.060 0.160 1.100 0.020 0.025 0.025 0.025 0.025 0.025 0.025 5 0.762 1.40 0.70 1 in 2500 1 in 1.5 0.461 0.790 0.002 0.050 0.000 0.052 0.025 0.470 0.050 5.000 5.520 363.665 363.663 364.365 364.363 OT Of M-1L /M 2 R/25 m Reach I End&Reach II Start/30m 0.062 Drop 1/1.0/125m Drop 2/2.0/200m Drop 3/1.5/300m Drop 4/1.5/375m Drop 5/1.5/525m Drop 6/1.0/675m Drop 7/1.0/850m M 3R/1200m Reach II End&Reach III Start/1205m 10.020 Drop 8/1.0/1375m Drop 9/1.5/1500m SLPC-1/1678m M 4L/1725 Reach III End&Reach IV Start/1730m 2.710 Drop 10/1.5/1900m Drop 11/1.5/2050m Drop 12/1.0/2200m SLPC 2/2600m Drop 13/1.0/2850m M 5R/M6L/2900m Reach IV End&Reach V Start/2905m 5.520 20 600 125 100 25 0.622 0.622 0.622 0.622 0.622 1.30 1.30 1.30 1.30 1.30 0.65 0.65 0.65 0.65 0.65 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 0.439 0.439 0.439 0.439 0.439 REACH V From Km 2.905 to Km 3.780 0.648 363.663 363.655 364.313 364.305 0.648 362.655 362.415 363.305 363.065 0.648 361.415 361.365 362.065 362.015 0.648 360.165 360.125 360.815 360.775 0.648 360.125 360.115 360.775 360.765 0.008 0.240 0.050 0.040 0.010 0.000 0.000 0.000 0.000 0.000 1.000 1.000 1.200 0.000 0.000 1.008 1.240 1.250 0.040 0.010 0.025 0.025 0.025 0.025 0.025 5 0.622 1.30 0.65 1 in 2500 1 in 1.5 0.439 0.648 0.002 0.050 0.000 0.052 0.025 0.350 0.050 3.200 3.600 0.108 0.110 0.070 0.040 0.014 0.000 0.342 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.000 1.200 1.200 0.000 0.000 0.000 4.400 2.108 1.310 1.270 0.040 0.014 0.000 4.742 1.854 0.200 24.600 26.654 26.654 First FSL - Last FSL 382.625 - 355.971 = 26.654 0.000 Hence tallied. OK 360.115 360.113 360.765 360.763 875 30 31 32 33 34 35 TOTAL in (m) 0.050 1175 24 25 26 27 28 DUE TO DROPS in (m) 0.012 REACH II From Km 0.030 to Km 1.205 0.950 381.813 381.775 382.563 382.525 0.950 380.775 380.745 381.525 381.495 0.950 378.745 378.705 379.495 379.455 0.950 377.205 377.175 377.955 377.925 0.950 375.675 375.615 376.425 376.365 0.950 374.115 374.055 374.865 374.805 0.950 373.055 372.985 373.805 373.735 0.950 371.985 371.845 372.735 372.595 525 17 18 19 20 21 22 DUE TO REACH CHANGE 1.128 1175 12 13 14 15 COEFFICIE NT OF PROPOSED STRUCTURE RUGOSITY / Remarks (n) DUE TO BEDFALL in (m) 0.504 30 3 4 5 6 7 8 9 10 LOSS OF HEAD 270 275 175 100 35 0 855 0.495 0.495 0.495 0.495 0.495 0.495 1.20 1.20 1.20 1.20 1.20 1.20 0.60 0.60 0.60 0.60 0.60 0.60 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 2500 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 1 in 1.5 0.416 0.416 0.416 0.416 0.416 0.416 REACH VI From Km 3.780 to Km 4.635 0.524 360.113 360.005 360.713 360.605 0.524 358.005 357.895 358.605 358.495 0.524 356.695 356.625 357.295 357.225 0.524 355.425 355.385 356.025 355.985 0.524 355.385 355.371 355.985 355.971 0.524 355.371 355.371 355.971 355.971 GRAND TOTAL = 4635 Arithemati cal Check = 0.025 0.025 0.025 0.025 0.025 0.025 Drop 14/1.0/2925m Drop 15/1.0/3525m Drop 16/1.2/3650m SLPC-3/3750m M 7R/M 8L/3775m Reach V End&Reach VI Start/3780m 3.600 Drop 17/2.0/4050m Drop 18/1.2/4325m Drop 19/1.2/4500m SLPC-4/4600m M 9L/Tail Minor/4635m Reach VI End/4635m 4.742 Structures For Distributory 11 @Km 32.700 of Gouravelly Right Canal .(Reach VII ) Total Structures Cross CD Works Total Total Masonary Total Chainag Out Sr.No Type of Structure Drops(5+ Super CD(11+1 CM(14 e(Km) Let 0.50 1.00 1.20 1.50 2.00 6+7+8+9) Piped UT Passage(S 2) SLPCDLPC +15) P) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 OT Of M-1L /M 2 1 0.025 1 R/25 m 2 Drop 1/1.0/125m 0.125 1 3 Drop 2/2.0/200m 0.200 1 4 Drop 3/1.5/300m 0.300 1 5 Drop 4/1.5/375m 0.375 1 6 Drop 5/1.5/525m 0.525 1 7 Drop 6/1.0/675m 0.675 1 8 Drop 7/1.0/850m 0.850 1 Structures in Km 1 1 0 3 0 3 1 7 0 0 0 0 0 0 9 M 3R/1200m 1.200 1 10 Drop 8/1.0/1375m 1.375 1 11 Drop 9/1.5/1500m 1.500 1 12 SLPC-1/1678m 1.678 13 M 4L/1725 1.725 1 14 Drop 10/1.5/1900m 1.900 1 Structures in Km 2 2 0 1 0 2 0 3 0 0 0 0 0 0 15 Drop 11/1.5/2050m 2.050 1 16 Drop 12/1.0/2200m 2.200 1 17 SLPC 2/2600m 2.600 1 18 Drop 13/1.0/2850m 2.850 1 19 M 5R/M6L/2900m 2.900 1 20 Drop 14/1.0/2925m 2.925 1 Structures in Km 3 1 0 3 0 1 0 4 0 0 0 1 0 1 21 Drop 15/1.0/3525m 3.525 1 22 Drop 16/1.2/3650m 3.650 1 23 SLPC-3/3750m 3.750 1 24 M 7R/M 8L/3775m 3.775 1 Structures in Km 4 1 0 1 1 0 0 2 0 0 0 1 0 1 25 Drop 17/2.0/4050m 4.050 1 26 Drop 18/1.2/4325m 4.325 1 27 Drop 19/1.2/4500m 4.500 1 28 SLPC-4/4600m 4.600 1 M 9L/Tail 29 4.635 1 Minor/4635m Structures in Km 5 1 0 0 2 0 1 3 0 0 0 1 0 1 Grand Total 6 0 8 3 6 2 19 0 0 0 3 0 3 Drops (m) Direct Pipes Right Side Total Grand DPs(17 Total(4+10 Left +18+19 +13+16+20 Tail Side ) ) 17 18 19 20 21 0 0 0 0 8 1 0 1 0 1 6 0 0 0 0 6 0 0 0 0 4 0 0 0 1 0 0 0 1 5 29 Hydralic Particulars For Distributory 11 @Km 32.700 of Gouravelly Right Canal .(Reach VII ) From Km 0.0 to Km 7.139 STATEMENT SHOWING THE DETAILS OF DROPS DEPTH HYDRAULIC PARTICULARS OF CANAL SOILS AT CHAINAGE S.NO. REMARKS FREE OF DROP BED WIDTH F.S.D B.L F.S.L. T.B.L. OGL IN KM. (m) U/S D/S U/S D/S U/S D/S U/S D/S U/S D/S Board IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. IN MTS. FOUNDATION IN MTS. 1 0.125 1.00 1.50 1.50 0.75 0.75 381.775 380.775 382.525 381.525 382.825 381.825 0.300 Hard Murum 382.770 2 0.200 2.00 1.50 1.50 0.75 0.75 380.745 378.745 381.495 379.495 381.795 379.795 0.300 Hard Murum 381.635 3 0.300 1.50 1.50 1.50 0.75 0.75 378.705 377.205 379.455 377.955 379.755 378.255 0.300 Hard Murum 379.500 4 0.375 1.50 1.50 1.50 0.75 0.75 377.175 375.675 377.925 376.425 378.225 376.725 0.300 Hard Murum 377.710 5 0.525 1.50 1.50 1.50 0.75 0.75 375.615 374.115 376.365 374.865 376.665 375.165 0.300 Hard Murum 376.375 6 0.675 1.00 1.50 1.50 0.75 0.75 374.055 373.055 374.805 373.805 375.105 374.105 0.300 Hard Murum 374.670 7 0.850 1.00 1.50 1.50 0.75 0.75 372.985 371.985 373.735 372.735 374.035 373.035 0.300 Hard Murum 373.690 8 1.375 1.00 1.50 1.50 0.70 0.70 371.775 370.775 372.475 371.475 372.775 371.775 0.300 Hard Murum 372.740 9 1.500 1.50 1.50 1.50 0.70 0.70 370.725 369.225 371.425 369.925 371.725 370.225 0.300 Hard Murum 371.555 10 1.900 1.50 1.40 1.40 0.70 0.70 369.065 367.565 369.765 368.265 370.065 368.565 0.300 Hard Murum 369.927 11 2.050 1.50 1.40 1.40 0.70 0.70 367.505 366.005 368.205 366.705 368.505 367.005 0.300 Hard Murum 368.342 12 2.200 1.00 1.40 1.40 0.70 0.70 365.945 364.945 366.645 365.645 366.945 365.945 0.300 Hard Murum 366.825 13 2.850 1.00 1.40 1.40 0.70 0.70 364.685 363.685 365.385 364.385 365.685 364.685 0.300 Hard Murum 365.233 14 2.925 1.00 1.30 1.30 0.65 0.65 363.655 362.655 364.305 363.305 364.605 363.605 0.300 Hard Murum 364.500 15 3.525 1.00 1.30 1.30 0.65 0.65 362.415 361.415 363.065 362.065 363.365 362.365 0.300 Hard Murum 363.119 16 3.650 1.20 1.30 1.30 0.65 0.65 361.365 360.165 362.015 360.815 362.315 361.115 0.300 Hard Murum 361.949 17 4.050 2.00 1.20 1.20 0.60 0.60 360.005 358.005 360.605 358.605 360.905 358.905 0.300 Hard Murum 360.537 18 4.325 1.20 1.20 1.20 0.60 0.60 357.895 356.695 358.495 357.295 358.795 357.595 0.300 Hard Murum 358.707 19 4.500 1.20 1.20 1.20 0.60 0.60 356.625 355.425 357.225 356.025 357.525 356.325 0.300 Hard Murum 357.387 CURVES STATEMENT FOR DISTRIBUTORY 11(DY 11) FROM KM 0.000 TO KM 4.635 CURVES STATEMENT S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 I.P. chainage(Al I.P. Deflection ong Apex) No. Angle, D ( in Km) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tail 0.025 0.100 0.210 0.514 0.833 1.025 1.212 1.436 1.834 2.131 2.403 2.579 2.700 2.830 3.016 3.286 3.493 3.790 4.042 4.284 4.443 4.594 4.669 15.00 30.00 9.00 29.00 28.00 14.00 21.00 21.00 25.00 10.00 3.00 40.00 22.00 8.00 10.00 26.00 25.00 19.00 83.00 35.00 26.00 27.00 29.00 Tangent length R tan(D/2) 10.54 21.44 6.30 20.70 19.95 9.83 14.83 14.83 17.74 7.00 2.10 29.13 15.56 5.60 7.00 18.48 17.74 11.72 61.97 22.08 16.17 16.81 15.52 Curve length ( in m ) 20.952 41.905 12.571 40.508 39.111 19.556 29.333 29.333 34.921 13.968 4.190 55.873 30.730 11.175 13.968 36.317 34.921 23.222 101.444 42.778 31.778 33.000 30.381 Apex TP 1 TP 2 distance ( in Chainage Chainage apex chainage on curve m) ( in Km) ( in Km) 0.691 2.824 0.248 2.634 2.451 0.601 1.363 1.363 1.944 0.306 0.027 5.138 1.499 0.196 0.306 2.106 1.944 0.974 23.486 3.400 1.843 1.991 1.976 0.014 0.078 0.203 0.492 0.811 1.012 1.194 1.418 1.813 2.120 2.397 2.546 2.678 2.817 3.002 3.261 3.468 3.770 3.972 4.231 4.395 4.544 4.620 0.035 0.120 0.215 0.533 0.850 1.032 1.224 1.447 1.848 2.134 2.401 2.602 2.709 2.829 3.016 3.297 3.503 3.793 4.073 4.274 4.426 4.577 4.650 0.025 0.099 0.209 0.512 0.831 1.022 1.209 1.433 1.830 2.127 2.399 2.574 2.693 2.823 3.009 3.279 3.485 3.782 4.022 4.252 4.410 4.561 4.635