1.1 Introduction
NORAQUA, Engineering Consultants, ltd, was founded as a
company in 1981 and resulted from bringing together the efforts
its founding partners - civil engineering graduates - had been
developing separately in basic sanitation research and projects. It
also resulted from the increasing need, felt by everyone, to
increment added value to research through introducing new
competencies.
Currently the company is ongoing implementation process of
certification of quality management system according to ISO
9001:2008.
1.2 Services
 Baseline Studies
 Feasibility Studies
 Master Plans
 Design
 Technical Assistance (in construction)
 Project Management and Supervision
 Rehabilitation Works
1.3 Fields of Actitity
1 – HYDRAULICS AND WATER RESOURCES
• Water Resources assessment
• River Flood Control
• Hydrological studies
• Floods Studies
• Weirs construction for floods
• Multipurpose hydroelectric plant (mini)
• River basin plans
• Hydraulics Infrastructure Design
• Agricultural Hydraulic Infrastructures Design
1.3 Fields of Actitity
2 – URBAN HYDRAULICS
• General Plans for Basic Sanitation
• Water Supply Design: abstraction, water treatment plants,
water main pipes, reservoirs e water supply networks
• Wastewaters Drainage System and Industrial Sewage
Networs Design: drainage network, sewage interceptors,
pumping systems, wastewater treatment plants (domestic
and industrial), underwater outfalls.
• Storm water drainage systems designs
• Industrial processes and domestic effluent characterization
studies
• Existing infrastructures diagnosis
1.3 Fields of Actitity
3 – ENVIRONMENT
• Environmental impact assessment
• Pollution control systems
4 – BUILDING INSTALLATIONS
• Water and Waste water networks
• Fire protection and safety in buildings
• Gaz Networks
• Reuse of waste water
5 – CARTOGRAFY AND REGISTRY
• Geographical information systems (GIS)
• Digital Cartografy
• Expropriations
2. PORTFOLIO
2.1 Master Plans
2.2 Urban Hydraulics
2.3 Treatment Plants
2.1 Master Plans
MASTER PLAN FOR WATER SUPPLY AND WASTE WATER SUPPLY SYSTEMS IN
THE NORTH OF PORTUGAL (consortium)
DATE
2007/2008
DESCRIPTION
Water Supply and Waste Water Supply Systems
diagnosis, global analysis, proposing new
solutions, estimated cost, investment timming
COVERAGE
74 Municipalities; Population: 264 000 habitants
2.1 Master Plans
REVISION OF MASTER PLAN FOR WATER SUPPLY
SYSTEMS ALONG AVE RIVER BASIN (consortium)
WASTE WATER SYSTEMS
DATE
2007
DESCRIPTION
Revision of baseline elements, analysis
of proposed solution and proposing
alternatives, main description of new
proposing solution, estimated costs,
development plan
POPULATION COVERED
453 000 habitants
AND
WASTE WATER
2.1 Master Plans
FURTHER STUDY OF THE TECHNICAL-FINANCIAL FEASIBILITY STUDY FOR VALE DO
SOUSA REGION (MUNICIPALITIES: AMARANTE, AROUCA, CASTELO DE PAIVA,
CINFÃES, FELGUEIRAS, LOUSADA, PAÇOS DE FERREIRA, PAREDES E PENAFIEL)
(consortium)
DATE
2005
Felgueiras
Paços de Ferreira
Lousada
Amarante
DESCRIPTION
The aim of this study was to fix several
problems in basic sanitation of this
region
POPULATION COVERED
434 000 habitants
COSTS
Water Systems – 134 M €; Waste Water
Systems - 247 M €
Paredes
Penafiel
Cinfães
Castelo de
Paiva
Arouca
2.1 Master Plans
MASTER PLAN FOR CITY OF ESPINHO AND NEIGHBORING AREAS
STORM WATER
DATE
1993
DESCRIPTION
Delineation of drainage basins for the city
and strategies and parameters for the
deployment of a network of storm water
drainage
POPULATION COVERED
33 700 habitants
2.2 Urban Hydraulics
JOVIM-NOVA SINTRA MAIN PIPE
DATE
2007
OWNER
Águas do Douro e Paiva, S.A.
DESCRIPTION
New “Jovim-Nova Sintra” Main Pipe Design (DN900);
technical assistance; maximum flow: 940 l/s
COST
9.500.000 €
EXTENSION
11.5 km
2.2 Urban Hydraulics
PEDROUÇOS-NOGUEIRA II MAIN
PIPE
DATE
2006
OWNER
Águas do Douro e Paiva, S.A.
DESCRIPTION
New “Pedrouços-Nogueira II” Main Pipe (DN700);
technical assistance
COST
4.000.000 €
EXTENSION
8.5 km
2.2 Urban Hydraulics
BENFICA MAIN PIPE – LUANDA (ANGOLA) – DETAILED DESIGN
(in consortium)
DATE
2012
OWNER
EPAL Luanda
DESCRIPTION
Project of Benfica Main Pipe
(DN500 to 700)
EXTENSION
7 km
2.2 Urban Hydraulics
CHAVES WATER SYSTEM
NETWORKS
DATE
2008
OWNER
Chaves Municipality
DESCRIPTION
Chaves Water Systems Networks (several zones)
design (from DN110 to DN200); technical
assistance
COST
3.300.000 €
EXTENSION
46.4 km
2.2 Urban Hydraulics
ESPINHO WATER SYSTEMS
DATE
Since 1981
OWNER
Câmara Municipal de Espinho
DESCRIPTION
Global Water System Design (from DN60 to
DN350) including several reservoirs; technical
assistance
EXTENSION
61 km
2.2 Urban Hydraulics
EXPANSION OF PEDROUÇOS RESERVOIR
DATE
1997
OWNER
Águas do Douro e Paiva, S.A.
DESCRIPTION
Expansion of Pedrouços Reservoir (at
Maia); tender preparation; technical
assistance
COST
2.000.000 €
CAPACITY
10 000 m3
2.2 Urban Hydraulics
BITA’S WATER SYSTEM AND QUILONGA’S WATER SYSTEM (ANGOLA)
– BASE PROJECT
DATE
2011/2013
OWNER
EPAL Luanda (in consortium)
DESCRIPTION
Preliminary Project for Bita’s and Quilonga’s
Water systems (Luanda’s Overall Water
System):
• Bita’s System: 70 km (DN600 to 2 x 1400)
• Quilonga’s System: 68km (DN500 to 2 x
1400)
2.2 Urban Hydraulics
RIVER WATER PIPELINE - SONAREF REFINERY PROJECT (LOBITO ANGOLA) – BASE PROJECT (in consortium)
DATE
2013/2014
OWNER
Sonangol (in consortium)
DESCRIPTION
Base Project for Bita’s and Quilonga’s
Water systems:
Sonaref Refinery Water Pipeline (from
Biópio Dam) – 3 pumping systems (900kw
and 355kw, 4 pumps each – 3 main pipes,
total 22km, DN600), 2 reservoirs (2 x 2 x
4000m3), surge tower (70m3), main pipe
(2.6 km – DN600)
COST (PROPOSAL)
75.000.000 € (aprox.)
2.2 Urban Hydraulics
WATER SUPPLY REINFORCEMENT AT SEVERAL MUNICIPALITIES IN
ANGOLA – BASE PROJECT FOR TENDER PREPARATION (CONDA, UKO SELES,
EBO, BEMBE, MUCABA, DAMBA)
(in consortium)
DATE
2013
OWNER
MINISTÉRIO DA ENERGIA E ÁGUAS
DIRECÇÃO NACIONAL DE ÁGUAS
(ANGOLA)
DESCRIPTION
•
•
•
•
•
Water Raws
Pumping Stations
Main Pipes
Reservoirs
Water Networks
2.2 Urban Hydraulics
CITY OF ESPINHO AND NEIGHBORING AREAS STORM WATER
DRAINAGE SYSTEM
DATE
2000
DESCRIPTION
Storm Water Drainage System Design:
around 50 km of network (from DN 315 to
DN 1500)
POPULATION COVERED
33 700 habitants
2.2 Urban Hydraulics
GAFANHA DA NAZARÉ STORM WATER DRAINAGE SYSTEM
DATE
2011
DESCRIPTION
Storm Water Drainage System Design:
around 22 km of network (from DN
315 to DN 1500 and “box-culvert”
1.0x2.0m)
POPULATION COVERED
17 100 habitants
COST (ESTIMATED)
7.4 M €
2.2 Urban Hydraulics
VILA DO CONDE STORM WATER DRAINAGE SYSTEM
DATE
2005/2011
DESCRIPTION
Storm Water Drainage System Design:
around 16 km of network (from DN 315 to
DN 1500 and “box-culvert” 1.5x2.0m)
COST (ESTIMATED)
4.85 M €
2.2 Urban Hydraulics
CAXITO STORM WATER DRAINAGE SYSTEM (ANGOLA) – DETAILED
DESIGN (in consortium)
DATE
2014
OWNER
Governo Provincial do Bengo (in consortium)
DESCRIPTION
Storm Water Drainage System Design:
around 29.2 km of network (from DN 315 to
DN2000); 3 pumping stations; 4 storm water
retention basin (5637 m2; 1706 m2; 1311 m2;
3150 m2)
2.2 Urban Hydraulics
ENERGY OPTIMIZATION – WWPS ESPÍRITO SANTO, WWPS MADALENA E
WWPS AFURADA
OWNER:
Águas de Gaia
DESCRIPTION:
Wastewater
pumping
station
energy optimization study:
i)
ii)
iii)
Definition of the actual
operation conditions;
Definition of optimization
solutions
Finantial analysis of the
proposed solutions
WWPS ESPÍRITO SANTO
WWPS AFURADA
WWPS VALADARES
2.3 Treatment Plants
GRAMIDO WASTE WATER TREATMENT PLANT
DATE
1989
OWNER
Serviços Municipalizados de
Gondomar
SERVICE
Design
POPULATION COVERED
52 815 habitants (equivalents)
CAPACITY:
10 574 m3/day
2.3 Treatment Plants
MOSTEIROS WASTE WATER TREATMENT PLANT
DATE
2002
OWNER
Serviços Municipalizados de Ponta
Delgada
SERVICE
Design
COST
591 757 €
POPULATION COVERED
3 709 habitants (equivalents)
CAPACITY:
763 m3/day
2.3 Treatment Plants
S. SILVESTRE WASTE WATER TREATMENT PLANT
DATE
2007
OWNER
Empreiteiros CASAIS / Águas do Mondego, S.A.
SERVICE
Design
COST
2 001 445 €
POPULATUION COVERED
11 667 habitants (equivalents)
CAPACITY:
2 100 m3/day
2.3 Treatment Plants
SOUSA WASTE WATERTREATMENT PLANT
DATE
2011
OWNER
DST / Águas do Noroeste,
S.A.
SERVICE
Design
COST
9 774 559 €
POPULATION COVERED
84 082 habitants (equivalents)
CAPACITY:
16 161 m3/day
2.3 Treatment Plants
PADRASTOS WATER TREATMENT PLANT
DATE
1991
OWNER
Câmara Municipal de Vale de
Cambra
SERVICE:
Design
COST
357 374 €
POPULATION COVERED
17 505 habitants (equivalents)
CAPACITY:
3 339 m3/day
2.3 Treatment Plants
QUEIMADELA WATER TREATMENT PLANT
DATE
1996/2005
OWNER
Câmara Municipal de Fafe /
Águas do Noroeste, S.A.
SERVICE
Projeto de execução
COST
1 009 617 € / 514 050 €
POPULATION COVERED
Around 40 000 habitants
CAPACITY:
17 859 m3/day
3. CERTIFICATIONS
3 Certifications
Since 2010, NORAQUA has been certified by Portuguese
economic authorities as a leader business company.
3 Certifications
Many other project owners certificates NORAQUA as a well
organized company, with well-made projects and with the
adequate know-how to fulfill all the proposed objectives.
4. EXTERNAL COLLABORATIONS
4 External Collaborations
NORAQUA has, following the experience and service in the business for over
30 years, a roster of external collaborations that allows supplant any specific
or continuous needs, whether in the field of civil engineering as well as other
specialties such as architecture, electrical engineering, environmental and
other.
Currently, NORAQUA has direct collaborations with the following companies:
•
Hidrofunção, Consultores de Engenharia Lda.
•
Procivil – Consultores Técnicos de Engenharia, Lda.
•
Gatengel – Projectos de Engenharia, Lda. – electrical design
•
CCAD – Serviços de Engenharia, Lda – structure design
www.noraqua.pt
Porto, Portugal