Applied Structural Drying Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WIND WATER Applied Structural Drying (ASD) & Agent Loss Ratio Sheet FAN DEHUMIDIFIER PAD BACKING SUBSTRATE (PLYWOOD) Science Freeze.

Download Report

Transcript Applied Structural Drying Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WIND WATER Applied Structural Drying (ASD) & Agent Loss Ratio Sheet FAN DEHUMIDIFIER PAD BACKING SUBSTRATE (PLYWOOD) Science Freeze.

Applied Structural Drying
Applied Structural Drying (ASD) & Agent Loss Ratio Sheet
WIND
WATER
Applied Structural Drying (ASD) & Agent Loss Ratio Sheet
FAN
DEHUMIDIFIER
PAD
BACKING
SUBSTRATE (PLYWOOD)
Science
Freeze H2O
0-32º F
Boil
212º F
ASD Primary Law
High Heat + Agitation
WATER SURFACE TENSION
THERMOCLINE
WIND
HEAT
Science
PAD
CARPET
SUBSTRATE (PLYWOOD)
Science
H2O ÷ ASD = H2 / O
Heat – causes the violent agitation of molecules
Motion – breaks surface tension of standing water
Science - Water Travels In 2 Directions
1. The path of least resistance
2. From wet to dry
BATHTUB
WATERFALL
RIVER
LAKE
LIVINGROOM
CARPET
The Path of Least Resistance
INS
DRY
BASE
CARPET
PAD
SIDING
PLYWOOD
FRAMING
JOIST
From Wet To Dry
Qualified
Measurements
 Relative humidity
 Temperature
 Grains per pound
 Relative material
standard
HEAT
105 º
WET
DRY
STRAW EFFECT
+
Goal
ASD is a method to reverse natural occurrence
to restore a structure to pre-loss condition.
Standard Water Damage Operation
 Remove Wet
Materials
 Extract Porous
Material
 1 Fan per 8-12’ ??
 Dehumidification per
8F ratio
10 x 15 = 1,500 sf
15’
DEHU
10’
Standard Water Damage Operation
Restoration Construction
Emergency Temp
2’ Drywall
$1,800
(5) Fans @ $25 day @ 4days
$500
Reset Base
$150
(1) Dehu. @ $100 day
$400
Pad
$400
Remove Pad @ 1,500 sf
$750
Re-stretch
$100
Emergency Response – day
$150
Paint
$1,200
WTR Tech @ 4days
$300
Clean
$100
TOTAL
$2,100
$2,660
Profit/Over 10/10
$500
TOTAL
$3,160
Standard Water Damage Operation
Average Loss has 2-3 rooms
E-Temp
Constrution
( 2 room loss)
$4,200
$6,320
Loss
$10,520
(MN/Dry + MN/PNT) Plus intrusion
$1,350
$11,750
A.S.D. Standard Water Loss
 Extract porous
materials
 Dehumidification by
G.P.P. in air
 Fans – water tension
& dew point
 Meet 72 hr dry time
15’
HEAT
DEHU
105º
10’
A.S.D. Standard Water Loss
Restoration Construction
Emergency Temp
Dry – MN
$150
(6) Fans @ 72 hrs
$450
Paint Walls
$1,200
(1) Dehu. @ 72 hrs
$300
TOTAL
$1,350
Heat @ 72 hrs
$450
Extraction
$350
Emergency Response
$150
WTR – Tech @ 72 hrs
$250
TOTAL
$2,050
A.S.D. Standard Water Loss
Construction at Intrusion Pt.
$1,350
Emergency Temp
$2,050
2SD Room Loss
$1,650
$5,050
Water Standard
$1,750
ASD Standard
$5,050
$6,700 diff
57%
TOTAL LOSS