Applied Structural Drying Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WIND WATER Applied Structural Drying (ASD) & Agent Loss Ratio Sheet FAN DEHUMIDIFIER PAD BACKING SUBSTRATE (PLYWOOD) Science Freeze.
Download ReportTranscript Applied Structural Drying Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WIND WATER Applied Structural Drying (ASD) & Agent Loss Ratio Sheet FAN DEHUMIDIFIER PAD BACKING SUBSTRATE (PLYWOOD) Science Freeze.
Applied Structural Drying Applied Structural Drying (ASD) & Agent Loss Ratio Sheet WIND WATER Applied Structural Drying (ASD) & Agent Loss Ratio Sheet FAN DEHUMIDIFIER PAD BACKING SUBSTRATE (PLYWOOD) Science Freeze H2O 0-32º F Boil 212º F ASD Primary Law High Heat + Agitation WATER SURFACE TENSION THERMOCLINE WIND HEAT Science PAD CARPET SUBSTRATE (PLYWOOD) Science H2O ÷ ASD = H2 / O Heat – causes the violent agitation of molecules Motion – breaks surface tension of standing water Science - Water Travels In 2 Directions 1. The path of least resistance 2. From wet to dry BATHTUB WATERFALL RIVER LAKE LIVINGROOM CARPET The Path of Least Resistance INS DRY BASE CARPET PAD SIDING PLYWOOD FRAMING JOIST From Wet To Dry Qualified Measurements Relative humidity Temperature Grains per pound Relative material standard HEAT 105 º WET DRY STRAW EFFECT + Goal ASD is a method to reverse natural occurrence to restore a structure to pre-loss condition. Standard Water Damage Operation Remove Wet Materials Extract Porous Material 1 Fan per 8-12’ ?? Dehumidification per 8F ratio 10 x 15 = 1,500 sf 15’ DEHU 10’ Standard Water Damage Operation Restoration Construction Emergency Temp 2’ Drywall $1,800 (5) Fans @ $25 day @ 4days $500 Reset Base $150 (1) Dehu. @ $100 day $400 Pad $400 Remove Pad @ 1,500 sf $750 Re-stretch $100 Emergency Response – day $150 Paint $1,200 WTR Tech @ 4days $300 Clean $100 TOTAL $2,100 $2,660 Profit/Over 10/10 $500 TOTAL $3,160 Standard Water Damage Operation Average Loss has 2-3 rooms E-Temp Constrution ( 2 room loss) $4,200 $6,320 Loss $10,520 (MN/Dry + MN/PNT) Plus intrusion $1,350 $11,750 A.S.D. Standard Water Loss Extract porous materials Dehumidification by G.P.P. in air Fans – water tension & dew point Meet 72 hr dry time 15’ HEAT DEHU 105º 10’ A.S.D. Standard Water Loss Restoration Construction Emergency Temp Dry – MN $150 (6) Fans @ 72 hrs $450 Paint Walls $1,200 (1) Dehu. @ 72 hrs $300 TOTAL $1,350 Heat @ 72 hrs $450 Extraction $350 Emergency Response $150 WTR – Tech @ 72 hrs $250 TOTAL $2,050 A.S.D. Standard Water Loss Construction at Intrusion Pt. $1,350 Emergency Temp $2,050 2SD Room Loss $1,650 $5,050 Water Standard $1,750 ASD Standard $5,050 $6,700 diff 57% TOTAL LOSS Thank You!