Activity report for year 2000 Manufacturing Unit Notebooks and Servers JP CABRERA, MUNS Manager, 03/01/2001 NEC Computers International MUNS Production Chart Jean-Pierre CABRERA Manufacturing Manager P7150 Babin Veronique Assistant Manager.
Download ReportTranscript Activity report for year 2000 Manufacturing Unit Notebooks and Servers JP CABRERA, MUNS Manager, 03/01/2001 NEC Computers International MUNS Production Chart Jean-Pierre CABRERA Manufacturing Manager P7150 Babin Veronique Assistant Manager.
Activity report for year 2000 Manufacturing Unit Notebooks and Servers JP CABRERA, MUNS Manager, 03/01/2001 NEC Computers International 1 MUNS Production Chart Jean-Pierre CABRERA Manufacturing Manager P7150 Babin Veronique Assistant Manager Production P4779 Philippe MESLET Warehouse Supervisor P7137 Etienne ALLAIRE Servers Supervisor P5066 Benoit Heriteau Notebooks acting as supervisor P5098 Manufacturing Technicians Guillaume Quemener Jérôme Guedon Stock Leads P7074 Jean-Marc PALMIER Shift Leads P5097 Bruno Leroux Y Hamon G. Lepage Shift Leads P5096 Frédéric Benoit FA,ISO,Methods P4631 Stéphane Cognolato Receiving Lead P7069 Rémy Lecomte Kitting P7067 Daniel Martin FA, Methods P7293 Antony Boudaud Office P4980 Alain Bureau Prekits/Accessories P4857 Bernard Sauvaget Notebooks OLR P7014 Cedric Liau Jérémie Brun CPU stockroom P7183 Franck Manseau Servers OLR P4015 Melin Michel Stock Inventory P7142 NEC Computers International 2 Our Team Values • • • • • • • • • Polyvalence, Flexibility, Motivation, Involvement Autonomy, Professional integrity, Enthusiasm Presenteism, Punctuality Rigor, Method, Serious, Pro Activity Dexterity, Rapidity, Agility, Reactivity Competence, Knowledge, Confidence, Reliability Communication, Respect for others, Welcome Frankness, Team work, Competition Innovation, Quality, Energy, Customer facing NEC Computers International 3 Global process Engineering Marketing Purchasing Shipping Material Planning Quality sales Customers Brands NEC PBELL BULL US Order Admin Production Planning Packing Burn-in & Preload On Line Repair Assembly Maintenance Industrial Engineering Human Resources & Facilities NEC Computers International Kitting Stockrooms Receiving 4 Production for Year 2K • 113511 notebooks – 20000 in December 2K (25000 in full year 1998) – average of 25 units per manufacturing order • 14282 servers – 15 models, racks and tower – 10 new product introductions – 2 units per manufacturing order (ATO) • 140000 accessories – for servers, notebooks and desktops • 10,5 M$ of stocks, 17500$ adjustment ie 0,0016% NEC Computers International 5 Quality internal audit Y2K • Servers ( 30/03/2000) : Satisfaction : 95% – Remarks : • FA & security instruction not written : done • Notebooks (18/12/2000) : Satisfaction : 85% – Remarks and status : • procedure is not up to date : in progress • torque of screw drivers not calibrated : tool must be replaced, 19KF, Investment proposal to be done • ESD rules not respected : verify that everybody conforms the ESD rules • working instruction list not up to date : in progress NEC Computers International 6 BUDGET Y2K : • Stockroom : – Actual (November) : 474729$ – Budget : 427719$ • Servers : – Actual : 402213$ – Budget : 641095$ • Notebooks : – Actual : 771892$ – Budget :611998$ NEC Computers International 7 Investments Y2K : • Stockroom : – Increase stockroom capacity in order to shorten the servers lead time : shelves + receiving – Amount = 48630$ • Notebooks : – Increase production capacity from 600/day to 900/day in order to achieve the target for end of the year : new layout + 6 trolleys for preload – Amount = 138000$ NEC Computers International 8 METHODS : • Quality measurement on the lines : – Acceptable Quality Level : cosmetics & docs – On Line Repair ratios • KAIZEN : the processes are always improved by the operators, in brainstorming meetings, controlled by leads or supervisors, • Progress group at receiving • Weekly meeting for OLR Quality improvement • Daily meeting for business & material management • New operators:2 days training + 3 (practice servers) NEC Computers International 9 Capacity calculation : on Wednesday, 11:00 Capacity required by order admin Material availability Capacity calculation parameters = number of working hours or number of people Wednesday, 12:00 Mail : working hours & capacity for the following week NEC Computers International 10 METHODS : 5S or Housekeeping • • • • • • Quality can only grow in a clean workshop Seiri = to throw away useless things Seiton = everything at its place Seiso = to clean Seiketsu= to be methodical, organized Shitsuke= to learn rigor NEC Computers International 11 METHODS : New product Introduction Purchasing Material planning Production planning MOs Engineering Marketing Products FCS dates roadmaps NEC Computers International 1 unit for FA test Tests & support Production: operator training, quality, routing times, efficiency, productivity, practice FA team : assembly method working instructions test process 12 Mission for the server production team • • • • To produce servers with Excellence in quality, delivered in time to the customer, and with respect of the budgeted costs. – This must be done with well trained people, in respect of the working conditions and environment, and continuously searching for improvement of the process. NEC Computers International 13 Layout : Servers NEC Computers International 14 Process for servers Packing 1 work station Shipping Quality Nationalization kits On Line Repair Burn-In 180 entry points Entry = 6 hours High = 12 hours Stockroom Kitting NEC Computers International Assembly 10 work stations 45 mn (Average) Max Capacity : 300/day/3 shifts 15 Objectives and results for servers • Quality : – On Line repair, Objective : 6.7 % current : 6.8% – Non conform products – Process issues – assembly errors – DOA, Objective 1 % , current : 0.1% • Lead times : Objective : 4 days from order placed to FOB – current lead time : 10 days (average) – production cycle time : 3 days (average) • Costs : – productivity : Objective :4/day/operator, current 3,35 NEC Computers International 16 Production cycle for servers • • • • J = order is placed in SOPSYS J+1 = MO is planned at J+2 J+2 = production, pretest, burn-in, J+3 = delivery to shipping NEC Computers International 17 QUALITY Y2K : Servers NEC Computers International 18 QUALITY Y2K : Servers %QUALITY OUTGOING SERVER 8,00% 7,00% 6,00% 5,00% 4,00% 3,00% 2,00% 1,00% NEC Computers International déc-00 nov-00 oct-00 sept-00 août-00 juil-00 juin-00 mai-00 avr-00 mars-00 févr-00 janv-00 1999 0,00% 19 QUALITY Y2K : Servers RMA (12 month rolling) 2,00% 1,50% % other (12 month) % NDF(12 month) 1,00% % Failed(12 month) 0,50% goal 19 9 jan 9 v-0 0 fév r-0 ma 0 rs00 av r-0 0 ma i-0 0 jui n-0 0 jui l-0 ao 0 ût0 se 0 pt00 oc t-0 0 no v-0 0 dé c-0 0 0,00% NEC Computers International 20 ai Se ne 1 m ai n e Se 3 m ai Se ne 5 m ai n e Se 7 m a Se ine m 9 ai n e Se 11 m ai n e Se 13 m ai n Se e 1 m ai 5 n e Se 17 m ai n e Se 19 m ai Se ne 21 m ai n e Se 23 m ai n Se e 2 m ai 5 Se ne 27 m ai n e Se 29 m ai Se ne 31 m ai n e Se 33 m ai n Se e 3 m ai 5 Se ne 37 m ai n e Se 39 m ai Se ne 41 m ai n e Se 43 m ai n Se e 4 m ai 5 Se ne 47 m ai n e Se 49 m ai ne 51 Se m CDI CDD TEMPS Manpower Y2K : Servers JP CABRERA 21/12/2000 NEC Computers International Effectif par semaine, SERVEURS 45 40 35 30 25 INT CDD 20 CDI 15 10 5 0 Semaine 21 04 /0 1/ 20 00 19 /0 1/ 2 03 000 /0 2/ 20 00 18 /0 2/ 2 04 000 /0 3/ 20 00 19 /0 3/ 2 03 000 /0 4/ 20 00 18 /0 4/ 2 03 000 /0 5/ 20 00 18 /0 5/ 2 02 000 /0 6/ 20 00 17 /0 6/ 20 00 02 /0 7/ 2 17 000 /0 7/ 20 00 01 /0 8/ 2 16 000 /0 8/ 20 00 31 /0 8/ 2 15 000 /0 9/ 20 00 30 /0 9/ 2 15 000 /1 0/ 20 00 30 /1 0/ 2 14 000 /1 1/ 20 00 29 /1 1/ 2 14 000 /1 2/ 20 00 29 /1 2/ 20 00 Productivity Y2K : Servers 40 Productivité 36 32 28 24 20 16 12 8 4 0 UNITS/DAY/OPERATOR objectif NEC Computers International Nbre de personnes présentes Polynomial (UNITS/DAY/OPERATOR) 22 04 /0 1/ 2 19 000 /0 1/ 2 03 00 0 /0 2/ 20 18 00 /0 2/ 2 04 00 0 /0 3/ 20 19 00 /0 3/ 2 03 00 0 /0 4/ 20 18 00 /0 4/ 2 03 00 0 /0 5/ 20 18 00 /0 5/ 2 02 00 0 /0 6/ 2 17 00 0 /0 6/ 2 02 00 0 /0 7/ 2 17 000 /0 7/ 2 01 00 0 /0 8/ 2 16 00 0 /0 8/ 2 31 000 /0 8/ 2 15 00 0 /0 9/ 20 30 00 /0 9/ 2 15 00 0 /1 0/ 20 30 00 /1 0/ 2 14 00 0 /1 1/ 20 29 00 /1 1/ 2 14 00 0 /1 2/ 20 29 00 /1 2/ 20 00 Efficiency Y2K : Servers Efficience Assemblage Serveurs 200 NEC Computers International 120 100 150 80 100 60 40 50 20 0 0 Efficience heures perdues Heures non productives Polynomial (Efficience) 23 Mission for the notebooks production team • • • • To produce notebooks with Excellence in quality, delivered in time to the customer, and with respect of the budgeted costs. – This must be done with well trained people, in respect of the working conditions and environment, and continuously searching for improvement of the process. NEC Computers International 24 Layout : Notebooks NEC Computers International 25 Process for notebooks Packing Shipping Quality Nationalization kits On Line Repair Pretest/Preload 192 entry points 3,5 hours Stockroom Kitting NEC Computers International Assembly 12 work stations 10 mn (Average) Max Capacity : 900/day/3 shifts 26 Objectives and results for notebooks • Quality : – On Line repair, Objective : 2.7 % current : 2.7% – Non conform products – Process issues – assembly errors – DOA, Objective 2 % , current : 1% • Lead times : Objective : 3 days from order placed to FOB – current lead time : 10 days (average) – production cycle time : 3 days (average) • Costs : – productivity : Objective :4/day/operator, current 3 NEC Computers International 27 Production cycle for notebooks • • • • J = order is placed in SOPSYS J+1 = MO is planned at J+2 J+2 = production, pretest, preload, J+3 = delivery to shipping NEC Computers International 28 QUALITY Y2K Notebooks % OLR NOTEBOOK 5,00% 4,50% 4,00% 3,50% 3,00% 2,50% 2,00% 1,50% 1,00% 0,50% 0,00% Process Assembly Suppliers NEC Computers International déc-00 nov-00 oct-00 sept-00 août-00 juil-00 juin-00 mai-00 avr-00 mars-00 févr-00 janv-00 1999 1998 Goal 29 QUALITY Y2K : Notebooks % OUTGOING QUALITY CHECK NOTEBOOK 2,00% 1,80% 1,60% 1,40% 1,20% 1,00% 0,80% 0,60% 0,40% 0,20% NEC Computers International déc-00 nov-00 oct-00 sept-00 août-00 juil-00 juin-00 mai-00 avr-00 mars-00 févr-00 janv-00 1999 1998 0,00% 30 NEC Computers International déc-00 nov-00 oct-00 sept-00 août-00 juil-00 juin-00 mai-00 avr-00 mars-00 f évr-00 janv-00 1999 avr-0 mars-0 2,00 1,50 1,00 juil-0 juin-0 mai-0 avr-0 mars-0 f évr-0 janv-0 199 199 déc-0 nov-0 oct-0 sept-0 août-0 juil-0 juin-0 mai-0 QUALITY Y2K : Notebooks RMA (ARR) repartition 3,00 2,50 other NDF Failed goal 0,50 0,00 31 ai Se ne 1 m ai n e Se 3 m ai Se ne 5 m ai n e Se 7 m ai ne Se m 9 ai Se ne 11 m ai n e Se 13 m ai Se ne 1 m ai 5 n e Se 17 m ai Se ne 19 m ai n e Se 21 m ai Se ne 23 m ai n Se e 2 m ai 5 n e Se 27 m ai n e Se 29 m ai n e Se 31 m ai Se ne 33 m ai n Se e 3 m ai 5 Se ne 37 m ai n e Se 39 m ai Se ne 41 m ai n e Se 43 m ai n Se e 4 m ai 5 n e Se 47 m ai n e Se 49 m ai ne 51 Se m CDI CDD TEMPS Manpower Y2K : Notebooks JP CABRERA 21/12/2000 NEC Computers International Effectif par semaine, NOTEBOOKS 70 60 50 40 INT CDD 30 CDI 20 10 0 Semaines 32 Mission for the warehouse team • To receive and stock each component • with Excellence in inventory accuracy, • delivered in time to the productions or to the other warehouses, • and with respect of the budgeted costs. – This must be done with well trained people, in respect of the working conditions and environment, and continuously searching for improvement of the process. NEC Computers International 33 Layout : Stockroom NEC Computers International 34 Process for warehouse Prod. Planning Office : following up of MOs Max Capacity : 900 notebooks or 50 MOs/day/3 shifts + 300 servers or 100 Mos/day/3 shifts + 50 Mos for accessories Manufacturing Orders Inventory & picking lists Resupply Goods Mass Prekit preparation Docks Stockroom Picking Receiving Stockroom Picking warehousemen Protected Shuttles Production Stockroom NEC Computers International 35 ai Se ne 1 m ai n e Se 3 m ai n Se e 5 m ai n e Se 7 m a Se ine m 9 ai n e Se 11 m ai n e Se 13 m ai Se ne 1 m ai 5 n e Se 17 m ai Se ne 19 m ai n e Se 21 m ai Se ne 23 m ai n Se e 2 m ai 5 Se ne 27 m ai n e Se 29 m ai Se ne 31 m ai n e Se 33 m ai Se ne 3 m ai 5 n e Se 37 m ai Se ne 39 m ai n e Se 41 m ai Se ne 43 m ai n Se e 4 m ai 5 Se ne 47 m ai n e Se 49 m ai ne 51 Se m CDI CDD TEMPS Manpower Y2K : Warehouse JP CABRERA 21/12/2000 NEC Computers International Effectif par semaine, STOCK 35 30 25 20 INT CDD 15 CDI 10 5 0 Semaine 36 Inventory Adjustments Y2K Valeur ajustement 25000 20000 19.198,78 1999 2000 15000 10000 Transfer from St Sylvain 4.026,84 5000 2.283,621.829,22 0,00 672,46 0,00 -1.068,71 61,48 326,54 0 -1.413,66 -1.795,00 -382,84 -720,90 -546,53 -1.387,92 -1.764,44 -2.347,63 -3.011,60 -5000 -4.123,44 -7.788,69 -7.190,33 -10000 -11.104,25 NEC Computers International Décembre Novembre Octobre Septembre Aout Juillet Juin Mai Avril Mars Février Janvier Décembre Novembre Octobre Septembre Août Juillet Juin Mai Avril Mars Février -15000 37 Efficiency Y2K : picking & delivery to production NEC Computers International 38 Weakness and axes of improvement • Global : • supply chain : forecasts accuracy, bids not taken in account, specific components with low volumes => suppliers not flexible • dependence of engineering on Boxborough • production planning : launch of production with components arriving the same day => shortages • too many temporary people => low skills level • Stockroom : • not enough space on the docks and shelves • no software for picking list nor MO grouping NEC Computers International 39 Weakness and axes of improvement • Notebooks: • Quality management must be improved by 10 points • Floor and walls to be repaired • Servers : • Packing becomes very hard because of the weight of servers : a handling tool has to be developed, in progress • Not enough light on the line : budgeted, IP to be done • both Nb & Sv: • compressed air screw drivers : budgeted for 2001 • On Line working instructions : budgeted for 2001 NEC Computers International 40 Training : proposal for 2001 Cost Center 3500 3500 3530 3530 3530 3530 3530 3530 3530 3530 3530 9373 9373 9373 9373 9373 9373 9373 9373 9373 9373 9373 9383 9383 9383 9383 9383 9383 9383 3530-9373-9383 9373-9383 Name Training Heading Babin V Anglais individuel Babin V Finance Guedon J Anglais classique Quemener J Anglais classique Cognolato S Anglais classique Meslet P L' Entretien Annuel d'activité Guedon J Douane + Transport Quemener J Douane + Transport Cognolato S Douane + Transport Cabrera J Douane + Transport 3 pers Outlook Taconne. A réseau Allaire. E Anglais classique Benoit. F Anglais classique Juret. A Anglais classique Leger. C Anglais classique Pilard. J Anglais classique Cabrera J Anglais individuel Palmier JM Construire, Animer et gérer son équipe Lecomte R Construire, Animer et gérer son équipe Allaire. E L' Entretien Annuel d'activité Cabrera J Manager un centre de responsabilité Heriteau B Anglais classique Leroux B Anglais classique Martin D Gestion de temps Heriteau B Perfectionnement gérer son équipe Leroux B Perfectionnement gérer son équipe Sauvaget B Certification Multiplatforme Geffard P L' Entretien Annuel d'activité 6 pers Formation Secouriste 8 pers Technique Servers NEC Computers International Date Cost 6.500 F 3.200 F 1.850 F 1.850 F 1.850 F 1.300 F 0F 0F 0F 0F 0F 5.000 F 1.850 F 1.850 F 1.850 F 1.850 F 1.850 F 8.000 F 2.100 F 2.100 F 1.300 F 44.000 F 1.850 F 1.850 F 1.400 F 715 F 715 F 16.500 F 1.300 F 0F 0F Total Training Cost 6.500 F 9.700 F 11.550 F 13.400 F 15.250 F 16.550 F 16.550 F 16.550 F 16.550 F 16.550 F 16.550 F 21.550 F 23.400 F 25.250 F 27.100 F 28.950 F 30.800 F 38.800 F 40.900 F 43.000 F 44.300 F 88.300 F 90.150 F 92.000 F 93.400 F 94.115 F 94.830 F 111.330 F 112.630 F 112.630 F 112.630 F Total Cost center 9.700 F 6.850 F 71.750 F 24.330 F 41 END NEC Computers International 42