Regional Seminar Series CCGT Plant Optimisation using Real Time Data Mark Bate Efficiency Team Leader EON – Connah’s Quay Power Station Empowering Business in Real.
Download ReportTranscript Regional Seminar Series CCGT Plant Optimisation using Real Time Data Mark Bate Efficiency Team Leader EON – Connah’s Quay Power Station Empowering Business in Real.
Regional Seminar Series CCGT Plant Optimisation using Real Time Data Mark Bate Efficiency Team Leader EON – Connah’s Quay Power Station Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. EON: Efficiency Targets Surpassed “We beat our Efficiency target in 2007 by 2.6%. The 2008 result was >1% against target . This equates to annual CO2 savings of over 135,000 Tonnes, saving enough gas to supply the annual needs of over 50,000 homes!.” Mark Bate, EON Efficiency Team Leader Business Challenge • Reduce Shaftline Trips • Improve Unit Efficiencies • Reduce CO2 emissions 2 Value now. Value over time. Solution • Performance Watchdog Displays optimise Plant • Proates models with data stored in PI • Performance Equations, ProcessBook and DataLink • ‘d4e’ Improvement project Results / Benefits • Reduced CO2 emissions by 135k Tonnes • Efficiency increased by 0.5%. Saving £20k in lost generation! • Saving over £4m per year © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master Hamilton North title style Lennox Connah's Quay ... taking power generation forward Douglas Hamilton Liverpool Rhyl River Dee Burton Point Deeside Point of Ayr Connah's Quay 3 Empowering Business in Real Time. Chester © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Contents of Presentation • Introduction to PI and PROATES • Early development of Plant Monitoring • Introduction of a Performance Watchdog Display • Benefits of ‘d4e’ Efficiency Improvement Projects • More recent developments • Summary 4 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Introduction to PI and PROATES • PI, ProcessBook and DataLink • allow Plant data to be interrogated post event or displayed as live values in a ProcessBook Display or Excel spreadsheet • PROATES(PROcess Analysis for Thermal Energy Systems) 5 • reads actual Plant data from PI • performs a series of thermal calculations based on the Plant • writes the results back to PI • calculations can also be referenced to Standard Conditions. • areas of poor performance are then identified and can be rectified. Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Project History • Installed in 2001 as part of Powertech Trial • Used by a few engineers • By 2003 extensive use by Operations Team 6 • Shaftline trips, troubleshooting • Trend analysis Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Trend Analysis 7 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Development of Plant Monitoring • As the use of PI flourished… • Development of ‘real time’ displays for comparing Unit Performance • Use of ‘Multistate’ symbols on displays to act as visual alarms • 8 Use of Datalink to create reports for various Plant performance issues (Condenser Tube Pick Report) Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. ClickComparisons Unit to edit Master title style 9 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. ClickComparisons Unit to edit Master title style 10 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click U2 Tube to edit Pick Master Report title style 11 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Performance Watchdog Click to edit Master title styleDisplay Problem with ‘GT Inlet Bleed Heating Valve’ 12 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Performance Watchdog Display • GT Air Inlet Bleed Heating Valve found open at around 8%, bleeding off warm air to the GT Air Inlet. Found out using PI Trends that this had been the case for almost 3 Days • Cycle Output increased by 7MW • Efficiency increased by 0.5% • This incident alone was estimated to have cost over £20k in lost generation! • 13 Surely we could make use of PI Performance Equations to minimise these events and give us early warning? Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title styleDisplay Performance Watchdog • Digital State 14 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Performance Watchdog Display • These PI screens helps us • • 15 maintain a 0.5% efficiency improvement on each unit, through optimising output and performance saving of over £4m per year across the site. Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title styleDisplay Performance Watchdog 16 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title styleDisplay Performance Watchdog 17 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title styleDisplay Performance Watchdog 18 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title styleDisplay Performance Watchdog 19 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title styleDisplay Performance Watchdog 20 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to of edit Master title style Benefits ‘d4e’ Efficiency Improvement Projects Cooling Water Systems +0.7% Gas Turbine / Compressor Improvements +0.6% • Filter upgrades and new offline wash strategy • Compressor Core Plugs fitted HRSG Pre Heater clean +0.2% • Many others…. 21 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to of edit Master title style Benefits ‘d4e’ Efficiency Improvement Projects • In 2007 we beat our Efficiency target by 2.6% • in 2008 result was >1% against target • This equates to annual CO2 savings of over 135,000 Tonnes, • saving enough gas to supply the annual needs of over 50,000 homes! 22 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style More Recent Developments CQ_B_Shift Shift Imbalance Totalizer Freq Resp Station Current Imbalance 22/09/2009 13:36 0 U1 -0.4 0 U2 0.3 0 U3 0.0 0 U4 2.8 MW/hr Availability Target Generation Actual Generation Delivery 5824 5840 100.3 1928 1931 100.2 Imbalance Variation Positive Imbalance Negative Imbalance 21.3 -5.5 5.3 -1.8 4.2 -3.3 0.0 0.0 11.8 -0.4 MWhrs MWhrs Within +/-2MWhr > 2MWh Spill > 2MWh Short 11.3 4.5 0.0 3.4 0.0 0.0 0.3 0.6 0.0 0.0 0.0 0.0 7.5 3.8 0.0 MWhrs MWhrs MWhrs 23 Empowering Business in Real Time. 1903 No Data 1993 MWhrs 1904 [-11101] All data events are 2004 filtered MWhrs in summar 100.1 0.0 100.6 % © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Live Imbalance Monitoring CQ_U1 - Load Imbalance 22/09/2009 13:51 CQ_B_Shift 2.5 1 MW Imbalance 2.0 1.5 1.0 0.5 0.0 -0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 -1.0 -1.5 0 Time Period Freq Participation U1 - Load Imbalance Spill > 2MWh Short < 2MWh MW Imbalance CQ_U1 - Load Profile 400.0 1 350.0 300.0 1 1 1 250.0 1 200.0 150.0 1 0 100.0 0 50.0 0.0 -50.0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 0 Time Period Base Load 24 Empowering Business in Real Time. Target Load Actual Generation Calculated Base Load © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style Imbalance Monitoring – Daily Reports Mon-21-Sep-09 CQ_U1 - Load Imbalance 1.5 1 MW Imbalance 1.0 0.5 0.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 -0.5 -1.0 -1.5 -2.0 -2.5 0 Time Period Freq Participation Load Imbalance Spill > 2MWh Short < 2MWh CQ_U1 - Load Profile 340 1 1 335 MW Imbalance 1 330 1 325 1 320 1 0 315 0 310 0 305 0 300 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Time Period Base Load 25 Empowering Business in Real Time. Target Load Actual Generation Calculated Base Load © Copyright 2009, OSIsoft Inc. All rights Reserved. Click to edit Master title style In Summary • Continually evolving process • The PI Watchdog screens ensure we are getting the most out of the current state of the Plant at all times • We have been able to develop and enhance our monitoring • PI has given us the confidence to address areas of: • poor plant performance • carry out effective cost / benefit analysis to obtain the necessary funding • Our PI system has become an integral part of the way we operate at Connah’s Quay. 26 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Thank you © Copyright 2009 OSIsoft, Inc. 777 Davis St., Suite 250 San Leandro, CA 94577