Regional Seminar Series CCGT Plant Optimisation using Real Time Data Mark Bate Efficiency Team Leader EON – Connah’s Quay Power Station Empowering Business in Real.

Download Report

Transcript Regional Seminar Series CCGT Plant Optimisation using Real Time Data Mark Bate Efficiency Team Leader EON – Connah’s Quay Power Station Empowering Business in Real.

Regional Seminar Series
CCGT Plant Optimisation using Real Time Data
Mark Bate
Efficiency Team Leader
EON – Connah’s Quay Power Station
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
EON: Efficiency Targets Surpassed
“We beat our Efficiency target in 2007 by
2.6%. The 2008 result was >1% against
target . This equates to annual CO2
savings of over 135,000 Tonnes, saving
enough gas to supply the annual needs of
over 50,000 homes!.”
Mark Bate, EON Efficiency Team Leader
Business Challenge
• Reduce Shaftline Trips
• Improve Unit
Efficiencies
• Reduce CO2 emissions
2
Value now. Value over time.
Solution
• Performance Watchdog
Displays optimise Plant
• Proates models with data
stored in PI
• Performance Equations,
ProcessBook and DataLink
• ‘d4e’ Improvement project
Results / Benefits
• Reduced CO2 emissions
by 135k Tonnes
• Efficiency increased by
0.5%. Saving £20k in lost
generation!
• Saving over £4m per year
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit
Master
Hamilton
North title style
Lennox
Connah's Quay ... taking power generation forward
Douglas
Hamilton
Liverpool
Rhyl
River Dee
Burton Point
Deeside
Point of Ayr
Connah's Quay
3
Empowering Business in Real Time.
Chester
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Contents of Presentation
• Introduction to PI and PROATES
• Early development of Plant Monitoring
• Introduction of a Performance Watchdog Display
• Benefits of ‘d4e’ Efficiency Improvement Projects
• More recent developments
• Summary
4
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Introduction to PI and PROATES
• PI, ProcessBook and DataLink
•
allow Plant data to be interrogated post event or displayed as live values in
a ProcessBook Display or Excel spreadsheet
• PROATES(PROcess Analysis for Thermal Energy Systems)
5
•
reads actual Plant data from PI
•
performs a series of thermal calculations based on the Plant
•
writes the results back to PI
•
calculations can also be referenced to Standard Conditions.
•
areas of poor performance are then identified and can be rectified.
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Project History
• Installed in 2001 as part of Powertech Trial
•
Used by a few engineers
• By 2003 extensive use by Operations Team
6
•
Shaftline trips, troubleshooting
•
Trend analysis
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Trend Analysis
7
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Development of Plant Monitoring
• As the use of PI flourished…
•
Development of ‘real time’ displays for comparing Unit Performance
•
Use of ‘Multistate’ symbols on displays to act as visual alarms
•
8
Use of Datalink to create reports for various Plant performance issues
(Condenser Tube Pick Report)
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
ClickComparisons
Unit
to edit Master title style
9
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
ClickComparisons
Unit
to edit Master title style
10
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
U2
Tube
to edit
Pick Master
Report title style
11
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Performance
Watchdog
Click to edit Master
title styleDisplay
Problem with ‘GT Inlet Bleed Heating Valve’
12
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Performance Watchdog Display
• GT Air Inlet Bleed Heating Valve found open at around 8%, bleeding
off warm air to the GT Air Inlet. Found out using PI Trends that
this had been the case for almost 3 Days
•
Cycle Output increased by 7MW
•
Efficiency increased by 0.5%
•
This incident alone was estimated to have cost over £20k in lost generation!
•
13
Surely we could make use of PI Performance Equations to minimise these
events and give us early warning?
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
to edit Master
title styleDisplay
Performance
Watchdog
• Digital State
14
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Performance Watchdog Display
• These PI screens helps us
•
•
15
maintain a 0.5% efficiency improvement on each unit, through
optimising output and performance
saving of over £4m per year across the site.
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
to edit Master
title styleDisplay
Performance
Watchdog
16
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
to edit Master
title styleDisplay
Performance
Watchdog
17
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
to edit Master
title styleDisplay
Performance
Watchdog
18
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
to edit Master
title styleDisplay
Performance
Watchdog
19
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click
to edit Master
title styleDisplay
Performance
Watchdog
20
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to of
edit
Master
title style
Benefits
‘d4e’
Efficiency
Improvement Projects
Cooling Water Systems
+0.7%
Gas Turbine / Compressor Improvements
+0.6%
• Filter upgrades and new offline wash strategy
• Compressor Core Plugs fitted
HRSG Pre Heater clean
+0.2%
• Many others….
21
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to of
edit
Master
title style
Benefits
‘d4e’
Efficiency
Improvement Projects
• In 2007 we beat our Efficiency target by 2.6%
• in 2008 result was >1% against target
• This equates to annual CO2 savings of over 135,000 Tonnes,
• saving enough gas to supply the annual needs of over 50,000 homes!
22
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
More Recent Developments
CQ_B_Shift
Shift Imbalance Totalizer
Freq Resp
Station
Current Imbalance
22/09/2009 13:36
0
U1
-0.4
0
U2
0.3
0
U3
0.0
0
U4
2.8
MW/hr
Availability
Target Generation
Actual Generation
Delivery
5824
5840
100.3
1928
1931
100.2
Imbalance Variation
Positive Imbalance
Negative Imbalance
21.3
-5.5
5.3
-1.8
4.2
-3.3
0.0
0.0
11.8
-0.4
MWhrs
MWhrs
Within +/-2MWhr
> 2MWh Spill
> 2MWh Short
11.3
4.5
0.0
3.4
0.0
0.0
0.3
0.6
0.0
0.0
0.0
0.0
7.5
3.8
0.0
MWhrs
MWhrs
MWhrs
23
Empowering Business in Real Time.
1903 No Data
1993 MWhrs
1904 [-11101] All data events are
2004
filtered
MWhrs
in summar
100.1
0.0
100.6
%
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Live Imbalance Monitoring
CQ_U1 - Load Imbalance
22/09/2009 13:51
CQ_B_Shift
2.5
1
MW Imbalance
2.0
1.5
1.0
0.5
0.0
-0.5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
-1.0
-1.5
0
Time Period
Freq Participation
U1 - Load Imbalance
Spill > 2MWh
Short < 2MWh
MW Imbalance
CQ_U1 - Load Profile
400.0
1
350.0
300.0
1
1
1
250.0
1
200.0
150.0
1
0
100.0
0
50.0
0.0
-50.0
0
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
0
Time Period
Base Load
24
Empowering Business in Real Time.
Target Load
Actual Generation
Calculated Base Load
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
Imbalance Monitoring – Daily Reports
Mon-21-Sep-09
CQ_U1 - Load Imbalance
1.5
1
MW Imbalance
1.0
0.5
0.0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31 32
33
34
35 36
37
38
39
40
41
42
43
44
45
46
47
48
-0.5
-1.0
-1.5
-2.0
-2.5
0
Time Period
Freq Participation
Load Imbalance
Spill > 2MWh
Short < 2MWh
CQ_U1 - Load Profile
340
1
1
335
MW Imbalance
1
330
1
325
1
320
1
0
315
0
310
0
305
0
300
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 22
23
24
25
26
27
28
29
30
31 32
33
34
35 36
37 38
39
40
41 42
43
44
45
46
47
48
Time Period
Base Load
25
Empowering Business in Real Time.
Target Load
Actual Generation
Calculated Base Load
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Click to edit Master title style
In Summary
• Continually evolving process
• The PI Watchdog screens ensure we are getting the most out of the
current state of the Plant at all times
• We have been able to develop and enhance our monitoring
• PI has given us the confidence to address areas of:
•
poor plant performance
•
carry out effective cost / benefit analysis to obtain the necessary funding
• Our PI system has become an integral part of the way we operate at
Connah’s Quay.
26
Empowering Business in Real Time.
© Copyright 2009, OSIsoft Inc. All rights Reserved.
Thank you
© Copyright 2009 OSIsoft, Inc.
777 Davis St., Suite 250 San Leandro, CA 94577