Nael Energy & General Enterprises
UAE , Abu-Dhabi , Tel : 00971 2 6776757, Fax : 00971 2 6776449, P.O.Box 2045
UAE , Al-Ain ,
Tel : 00971 3 7621400, Fax : 00971 3 7630401, P.O.Box 15253
http://www.nael. ae, E-mail : [email protected]
About Us
Nael Energy and General Enterprises Establishment has been established in 1977, since that time it
has been grown into one of the most efficient and successful contractors in the region. NEGE through years
of experience ,has built an Engineering & Contracting House with local and international expertise capable of
competing for the most sophisticated and complex projects.
In addition NEGE is a member of the Nael & Bin Harmal Group of Companies and plays a vital role in
supporting the Groups ambitions for success and growth.
Diversity
We serve the following fields:
 Civil works
 Water & Sewerage Plants
 Power Transmission & Distribution
 Environmental Engineering
 MEP & HVAC
 Irrigation & Landscaping
Organization
We are organized into six departments. These departments provide a wealthy resource pool to support the
operational divisions. Besides being a resource pool these departments also offer logistical and financial
planning support to the project divisions
 Administration
 Financial
 Tendering , proposing & Contracts
 Engineering & planning
 QA/QC
 IT
Our clients
Nael Energy has been involved in a wide range of projects for clients such as the Municipalities , Water
and Electricity Authorities , Department of Military works , Telecommunication corporations , District
cooling providers , 11KV substations and O.H.L.
Operational Division Activities
Civil Division
1.
General civil.
2.
Hard & Soft landscaping.
3.
Irrigation networks
Fluid Systems
1.
Water transmission lines.
2.
Water distribution networks.
3.
Sewage and drainage networks.
4.
Water distribution pumping stations.
5.
Water transmission pumping stations.
6.
Water treatment plants.
7.
Sewage treatment plants.
8.
Sewage pumping stations.
9.
Storm water pumping stations.
10. Operation and maintenance.
Power Transmission & Distribution
1.
Power transmission / distribution.
2.
Power generating.
3.
Substation packages.
4.
Airfield lighting.
5.
External and street lighting.
Environmental Engineering
1.
Solid waste management.
2.
Incineration.
3.
Emissions monitoring & control.
4.
VOC recovery.
MEP & HVAC
1.
District cooling.
2.
HVAC.
3.
Electrical Installation.
4.
Sanitary Engineering.
ISO Certificate
Project # 1
Al-Ain Water Distribution network pump station at
AARC
•Client
: TRANSCO
•Main Contractor : Torishima Pump manufacturing
•Consultant
: ILF
•Period
: 24 months
•Completion date : December 2011
•Value
: 220,235,003 Dhs
•Contract No
: N6820
Scope of work :•
Construction of the new Al-Ain pumping station at AARC .
•
Hydraulic design for the complete water distribution network.
•
Supply of DI line pipes including cement mortar lining.
•
Supply & installation of DN 600 (5.6 Km) , DN 700 (2.9 Km), DN 1000 (9.7 Km),
DN 1200 (3.6 Km), DN 1600 (37.8 Km)
Project # 2
Rehabilitation of Pumping Stations
•Client
: ADSSC
•Main Contractor : Nael Energy
•Consultant
: Hyder
•Starting date
: 24th May 2010
•Period
: 24 months
•Value
: 90,000,000 Dhs
•Contract No
: 1797
Scope of work :•
Treatment capacity 250,000m3/day.
•
Replacement of the existing sand filter media.
•
Implementation and installation of a new SCADA for the treatment plant.
•
Siemens Simatic PCS7 (Process Control System) DCS System based on Siemens S7400H PLC System (417-4H PLCs)
•
Construct new pumping station PS W8 suitable for the new flow rate and head, on
higher ground to the north of the existing PS W8
•
Construct 500 mm GRP gravity sewers between existing inlet sewer and the new PS
W8
•
Construct new 350 mm GRP pumping main between the new pumping station PS W8
and the discharge chamber
•
Blank off the inlet of 250 mm GRP rising main at the pressure vessel chamber at the
existing PS W8
Project # 3
Upgrading the traffic movement and intersections in
central area of Al Ain
•
•
•
•
Client
Consultant
Period
Value
: Al Ain Municipality.
: Wilbur Smith.
: 18 months.
: 34,000,000 Dhs.
Scope of work :•
Complete infrastructure & electrical works.
•
Street Lighting
•
Traffic lights
Project # 4
Bawadi Mall (Al Ain)
•
Client
: Nael Investment
•
Consultant
: Shankland Cox
•
Period
: 22 months
•
Complete date : Oct. 2008.
•
Value
: 260,000,000 Dhs.
Scope of work :•
Construction of District cooling plant.
•
Construction of 11 sub-stations
•
Supply, Install and commissioning of lighting system, power
system ,distribution boards, isolators for mechanical
equipment, fire alarm system, public address system, CCTV,
SMATV, BMS ,central battery system , telephone system , low
voltage cables and lightning protection system.
•
Install and commissioning of light fixture, low voltage panels ,
stand by generator , 1500 KVA transformers, 11 KV panels and
11 KV cables.
Bawadi Mall (Al Ain)
Scope of work (Cooling Plant):The District Cooling Plant (DCP) within Al Ain Central Market consists of
a 2,500m² building comprising the following floors:
1.
2.
3.
Basement Floor: it includes the Water Tanks and Pumps
Room.
Ground Floor: it includes the Plant Room and other technical
areas, i.e. HV Panels Rooms, Transformers Room &
Workshop.
Mezzanine Floor: Administrative Office, Store, Control Room
and
LV Panel Room.
The DCP comprises 7 Chillers of 1,200TR each (Carrier Make)
resulting in a total cooling capacity of approximately 8,000TR
and it is designed to serve with cooling all the other buildings
within the Central Market premises, i.e. Bawadi Mall, Heritage
Village, Hotel and Accommodation Apartments via 700mm dia
pre-insulated cooled water pipes. It also comprises 4 Cooling
Towers, 7 primary pumps, 7 condenser pumps and 5 secondary
pumps. It has an independent power substation consisting of 6
transformers (3x2.5MVA and 3x1.5MVA) and related HV and
LV switchgears. The plant operation is monitored and
controlled by a BMS (Building Management System).
Infrastructure work:•
•
•
•
•
•
•
11 K.V cables (11 K.M)
1000 K.V.A Transformer (1 No)
1500 K.V.A Transformer (34 No.)
L.V panel (33 No.)
T.R.M (1 No.)
Q.R.M (2 No.)
11 K.V panel (9 No.)
Bawadi Mall (Al Ain)
Bawadi Mall (Al Ain)
Project #5
Al Hili Fun City Phase1 (Al Ain)
•
Client
: Tourist Development & Investment Company
•
Consultant
: Otak International
•
Period
: 18 months
•
Complete date : December 2009.
•
Value
: 22,000,000 Dhs.
Scope of work :•
Construction of new gate & various building
•
Complete Refurbishment works as the following :•
Installation and commissioning for the following games






Flying clowns
Family swinger
Flying coaster
Road train
Sky tower
Mini Airport






Carrousel
Bumber Car
Mini Scooter
Jump Rider
Astro Jet
Para Trooper
Al Hili Fun City Phase1 (Al Ain)
Project # 6
Apartment Villas at Al Muwaiji, Al Ain
Plot No.(129B)
•
Client
: Mr.Nael Rashid Al Shamsi
•
Consultant
: ARAK
•
Period
: 18 months
•
Complete date : January 2011.
•
Value
: 21,500,000 Dhs.
Scope of work :•
Supply, Install and commissioning of the following :•
LV & HV Power network
•
HVAC
•
Drainage & Plumbing
Project # 7
Al-Hili Buildings (Al Ain)
•Client
: Housing Committee
•Main Contractor : Nael Bin Harmal Hydroexport
•Sub Contractor : Nael Energy
•Consultant
•Period
: Dorsh
: 24 months
•Complete date : April 2009.
•Value
: 50,000,000 Dhs.
Scope of work :Complete HVAC & Infrastructure works.
Al-Hili Buildings (Al Ain)