COSL Drilling Europe
Download
Report
Transcript COSL Drilling Europe
Lage Nordby
Vice President Operations
COSL Drilling Europe AS
MSc in Naval Architecture from the Norwegian University of Science and Technology
16 years experience with rig operations with Schlumberger, Transocean and COSL, whereof 9
years in various international assignments. 6 years as Rig Manager in Egypt and Norway as
well as one year as HR Manager with Transocean in Norway, prior to current position.
Current work with COSL Drilling Europe AS involves operation of 2 accommodation units and
3 DP Drilling units.
1
NFLB
15.03.2013
www.cosl.no
COSL Drilling Europe
Building a rig (and it’s challenges)
Operations
Competence and capacity
3
COSL – China Oilfield Services Limited
China National Offshore Oil Corporation
CNOOC
45.28%
29%
Public
Public
54.72%
CNOOC
China Oilfield
Services
Limited
Core Business
Oilfield Services
2011
71%
CNOOC
32%
Public 38.42%
59.41%
CNOOC
Promoters 2.17%
China BlueChem
Limited
CNOOC Limited
Core Business
Core Business
Petro-Chemical
E&P
4
Public
68%
CNOOC
Offshore Oil
Engineering Co.
Ltd.
Core Business
Offshore Engineering
COSL DRILLING EUROPE AS
3 + 1 Semi
submersibles
COSLPIONEER 2 +2 years Statoil
COSLINNOVATOR 8 + 8 years Statoil
COSLPROMOTER 8 + 8 years Statoil
COSLPROSPECTOR (Under Construction)
8 Jack Ups
Operated by
Singapore office
COSL Drilling Europe
2011
5
2 Acc units
COSL RIVAL - ConocoPhillips
COSLRIGMAR - ConocoPhillips
CDE Management team
6
People
Employees 01.03.2013
Total
Offshore
Onshore
Forus/Mongstad
Yantai
775
625
150
110
45
15 apprentices
10 subsea trainees
3 students (MSc/BSc engineers)
Approx. 16000 applications
40% with relevant competence
30% with relevant competence and experience
COSL Simulator at SOTS in Stavanger
7
Activities
COSLRival
COSLRigmar
COSLPioneer
COSLInnovator
COSLPromoter
COSLProspector
Accomodation – 360
COPUK - Judy
Accomodation – 326
COPNO - Eldfisk
Driling/Completion
Statoil – FastTrack
Driling/Completion
Statoil –Troll
Driling/Completion
Statoil – Troll
Under Contruction
?
8
Operations concept
Mongstad Supply
Centre
COSLRIGMAR
COSLPROSPECTOR
COSLPIONEER
COSLINNOVATOR
COSLPROMOTER
9
COSLRIVAL
COSL DP3 Drilling Rig (GM4000)
MADE IN NORWAY
NOV Drilling equipment
Kongsberg DP & Navigation
Molde cranes 80 T, 20m
RR anker Winches
2 X Norsafe MAKO 655 Diesel jet
4 X Norsafe GES 40 Lifeboats
Simens/ ABB switch boards
6 X Wärtsila Diesel engines/ W12V32
6 X Siemens Generators
6 X Wärtsila LIPS Azimut Thrusters
MADE IN CHINA…
10
11
11
Building a Rig
www.cosl.no
New and unique way of constructing drilling rigs
Ref.: 90357
5/2/201328/9/2010
Mating of Pioneer
Ref.: 64812
6
Building a rig
The requirements
15
Flag – MPA (Singapore)
IMO MODU Code
ISPS Code
ISM Code
MARPOL
International
Convention on
Load Line
ILO 92/133 –
Accommodation
International Convention on
Tonnage Measurement of
Ships
16
Petroleumstilsynet / bistandsmyndigheter
Andre
bistandsmyndigheter
Approx 2800 requirements
Approx. 1300 are relevant
17
Class (DNV)
+ «Overlappende regelverk»
Drilling utstyr
OS-E101
Helidekk:
OS-E401
Sikkerhet
OS-A101
OS-D301
Kraner
Ship Rules Part 6 Ch.2 Sec.3
Stål/struktur
OS-B101
OS-C101
OS-C103
OS-C-401
RB-B401
RP-C103
RP-C201
RP-C202
RP-C203
RP-C204
Marine/Maskin
OS-D101
Elektrisk
OS-D201
Instrument
OS-D202
Ship Rules: Part 6
Ch.3 (EO)
Stabilitet
OS-C301
Posisjonering
OS-E301
Ship rules Part 6 Ch. 7 (DP)
18
Anvendelse av norsk offshore regelverk
Helikopterdekk
Sjøfart, Helikopter Dekk
Drilling Utstyr
Innretningsforskriften
Boligkvarter
Sjøfart, Boligkvarter
Sjøfart, Drikkevann
Innretningsforskriften
Andre petroleums relaterte systemer/ utstyr
Innretningsforskriften
Kraner
Sjøfart, Kran
Sikkerhet/brann
Sjøfart, Brann
Sjøfart, Konstruksjon
Sjøfart, Boligkvarter
Arbeidsmiljø
Sjøfart, Konstruksjon
Innretningsforskriften
Maritimt utstyr
Sjøfarts regelverk
Stål/struktur
Sjøfart, Konstruksjon
Livbåter og
redningsfartøy
Sjøfart, Livreddende
anordninger
Innretningsforskriften
Stabilitet
Sjøfart, Stabilitet
Sjøfart, Ballast
Posisjonering
Sjøfart, Ankerhåndtering
IMO 645
Forurensning
Sjøfart og PTIL regelverk
19
Standarder, retningslinjer og anbefalinger
NORSOK
NORSOK standarder:
ISO
standarder:
Boreutstyr, heiser, ergonomi, branndeteksjon, HVAC,
m.m.
Olf’s anbefalte retningslinjer:
Arbeidsmiljø, boring, kran og løft, m.m.
Kompetanse, beredskap, sikring, rørhåndtering, m.m.
SfS anbefalinger:
Arbeidstillatelse, Sikker Jobb Analyse, Fallsikring,
Fallende gjenstander, m.m.
20
…..Sea Voyage
Prep. Yantai
Las Palmas-Norway 12 days
Port Las Palmas 2 days
Yantai-Singapore 13 days
Port Singapore 4 days
Namibia - Las Palmas 19 days
Singapore-Mauritsius 16 days
Port Mauritius 1 days
Namibia(Walvis Bay) 1
days
Mauritsius-Namibia 15 days
(Average speed 8.5 knots)
Ref.: 90357
5/2/201328/9/2010
Building a rig
Arriving in the fjord
22
Rig Acceptance
Why 7-8 months in the fjord? (COSLPioneer, 4 months)
Technical challenges
Rig completion
Emergency Shut Down and Fire & Gas system
Electrical installation quality
Offshore acceptance
BOP control system (LMRP disconnect)
DP Stationkeeping - tuning
Heave compensated Drawwork – tuning
Vendors
Delivery quality and understanding of requirements
Capacity and availability of competance
Client scope & acceptance process
3rd party scope
Interpretation of requirements (Client vs Contractor)
Acceptance Test Program – what to expect?
Industry challenge
Agree on requirements
Achieve early clarifications
Agreed acceptance requirements
Focus the scope to critical activity
Electrical Challenges
Ex glands not
installed correctly
Action:
Full check and retermination (all compartments on the rig)
HV cables - wrong
crimping
LMRP disconnect
Time to
disconnect
Water Depth
318 meters
R
I
S
3 Deg
E
R
LMRP
BOP
Corrective Actions:
- Modification to BOP controls
- Change og BOP fluid
- Change out Valves and pipings
NOV Active Heave Drilling Drawworks
Water Depth
318 meters
R
I
S
E
R
LMRP
BOP
Kongsberg
Motion Reference Unit - MRU
Challange:
-Incorrect settings for AHD Drawwork
-Interface between MRU
software and HCD software
not syncronized
Operation - how did it go?
www.cosl.no
Operations
Key achievements
Simplistic HSE focus – Statoil best practice
COSLPioneer: «Rig of the month» after 8m
Continuous strong operational performance
COSLInnovator: 0.75 hrs dt first operating month
How?
Strong crew competance
Rig familarization - structure
QHSE / procedures made practicle
Merge process
Reduce paper
Meet people in their work place
Open and direct culture
28
Going forward..
Market competition for people
COSLProspector = opportunities
2013 Operational focus
Job Planning / Barrier Management
Experience Transfer
Common operating procedures
Common practice for experience transfer
Transfer Learnings to COSLProspector
Maintenance/stock optimizing
Keeping the COSL culture
29
Competence & Capacity
www.cosl.no
Personnel requirements 2013-2015
2700 personnel required to man 21 new entry drilling units
Onshore management of 18-21 rigs
11% of personnel aged 61-70 yrs with the next 5 yrs
18-21 rigs require 3’party WL, ROV, CMT etc.
Planning and preparation for new drilling campains
Follow up from authorities
Service personell from equipments manufacturars
Courses and training
31
Training Requirements
32
Competence & Capacity
Future challenges:
Vendors ability to recruit and train new and competent service personnel.
(Already stretched on both capacity and competence)
Shipyards ability to recruit and train new and competent yard personnel.
(Already stretched on both capacity and competence)
Drilling contractors ability to recruit and train new personnel.
(Will be a challenge in 2014 – 2015)
Possible consequences:
HSEQ !
Considerable delays if unplanned stop in operations !
Extensive delays in connection with modification projects, upgrades, SPS and new rigs !
33
Competence & Capacity
“Kilde www.offshore.no/ August 2012”
34
Service personell & equipment
Limited access to competent service personnel
Drilling Equipment, DP systems, electrical systems, engines and generators,
thrusters, etc..
Long delivery of critical equipment
BOP
26m
Lifeboats 21m
Drill pipe 8-9m
35
Do we have a challenge…
36
Now what?...
Coordinated information to the industry on future
requirements for resources and equipment
Reduce use of resources for rig mobilization / acceptance
Carefully evaluate initiatives, change of regulation,
revisions and industry requirements
Simplify training requirements
Insanity:
doing the same thing over and over again and expecting different results.
Albert Einstein
37
Thank you