Hari Kripa Business Venture Pvt.Ltd.
Download
Report
Transcript Hari Kripa Business Venture Pvt.Ltd.
PROPOSAL
FOR
ENVIRONMENTAL CLEARANCE
OF
Hari Kripa Business Venture Pvt.Ltd.
SP-37,RIICO Industrial Area,Kaladera,Tehsil-Chomu,Distt.Jaipur (Rajasthan)
Plot Area -15000 m2
Existing Capacity: MS. Ingot/Billets 25,000 TPA
Proposed expansion :MS&SS Ingots/Billets 83,000 TPA
Expanded capacity :MS&SS Ingots/Billets 1,08,000 TPA
Proposed capacity: TMT Bars(MS & SS) 1,07,000 TPA
Represented by
M.K Agarwal (Director)
R/o 8/405 Vidhyadhar Nagar Jaipur-302039
Ph. no :01423-265854/55,0141-2363980,9314526080,9414076474,
Fax.no. 0141-2371674
E-mail Id : [email protected],[email protected]
Date of work order: 14-06-2013
Study period: Post Monsoon (2013)
Total Project Cost: 1476 Lacs
CONSULTING ENGINEERS GROUP LTD.
CEG Tower, B-11(G), Malviya Industrial Area, Jaipur-302 017, Rajasthan, India.
Tel: +91-141 2751801 / 2751802, Fax: 2751806 www.cegindia.com
Form I
FORM – 1
I Basic Information
S. No.
Item
Details
1.
Name of the Project
Harikripa Business Venture Pvt.Ltd. (Proposed expansion
Project).
2.
S. No. in the schedule
The proposed project under expansion is categorized as
‘B’ of 3(a) (as per the Gazette Notification dated 14th
September, 2006 and subsequent amendment dated
01.12.09 & 4.4.2011).
(In
case
of
secondary
metallurgical
processing
industrial units only those projects involving operation
of furnaces such as induction and electric arc furnace,
submerged arc furnace, pre heating furnace, cupola
and crucible furnace with capacity more than 30,000
tonnes per annum would require environmental
clearance).
3.
Proposed capacity/
The existing and proposed capacities are as follows.
area/ length/ tonnage
(1) Existing capacity MS Ingots/Billet: 25,000 TPA
to be handled
(2) Proposed Enhancement MS & SS Ingots/Billet:
/command area/lease
area /number of wells
to be drilled.
11000+72,000 =83000TPA
(3)Proposed Expanded capacity MS & SS Ingots/Billets:
1,08,000 TPA
(4) Proposed capacity TMT Bars (MS& SS): 1,07,000 TPA
Land Area is 15,000 sq m as per the lease agreement
of RIICO. The site is located in the RIICO Indl. Area
Kaladera, Tehsil-Chomu, Distt. Jaipur, Rajasthan. The
enhancement in the production capacity does not
require the additional land area, as the available land
area is sufficient for the proposed expansion. No new
well is planned to be dug.
4.
New / Expansion /
Expansion Project.
Modernization
5.
Existing capacity/ Area
The existing capacity of the plant is as follows.
etc.
MS Ingots/Billets : 25,000 TPA
Area of unit : 15,000 sq.m.
i
Form I
6.
Category of project i.e.
Category “B”
'A' or 'B'
At point 7 III stage (3) sub point B (exemption from
Public consultation is allowed for all projects or
activities located
within industrial estates or park
approved by the concerned authorities and which are
not disallowed in such approvals as mentioned in the
Gazette Notification of 2006 and its subsequent
amendment on 01.12.2009 and 04.04.11 ).
7.
Does it attract the
No
general condition? If
yes, please specify.
8.
Does it attract the
No
specific condition? If
yes, please specify.
9.
Location
Plot/ Survey/ Khasra
Harikripa Business Venture Pvt.Ltd.
no.
SP-37, Kaladera, RIICO Industrial Area, Tehsil- Chomu,
Distt. Jaipur, Rajasthan
10.
Village
Kaladera
Tehsil
Chomu
District
Jaipur
State
Rajasthan
Nearest Railway
Railway Station : Loharwada 7.42 km Aerial distance (NE)
station/ Airport along
Jaipur Airport : 41.41Kms, Aerial distance (SE)
with distance in kms.
11.
Nearest Town, City,
Nearest Town & City: Chomu Town-10.96 km(E)
District Headquarters
District Headquarter: Jaipur-32.59(SE)
along with distance in
kms.
12.
Village Panchayat, Zilla
Village Panchayat : Kaladera
Parishad, Municipal
Zilla Parishad: District Collector, Jaipur, Rajasthan
Corporation, Local
Municipal corporation: Nagar Palika Chomu
body (Complete postal
Local Body: Tehsil-Chomu
address with telephone
ii
Form I
no. to be given)
13.
Name of the applicant
Mr. M.K. Agarwal (Director)
14.
Registered address
Regd. Office:
SP-37, Kaladera, RIICO Industrial Area, Tehsil- Chomu,
Distt. Jaipur, Rajasthan
15
Address for
M/s Harikripa Business Venture Pvt.Ltd.
correspondence
Room No. 615, 6th Floor ARG North Avenue VKI Area
Name
Sikar Road, Jaipur
Designation (Owner /
Director
Partner / CEO)
Address
M/s Harikripa Business Venture Pvt.Ltd.
SP-37, Kaladera, RIICO Industrial Area, Tehsil- Chomu,
Distt. Jaipur, Rajasthan
Pin Code
303801
E-mail
[email protected]
[email protected]
[email protected]
Telephone no.
01423-265854/55,0141-2363980,
9314526080,9414076474
16.
Fax No.
0141-2371674
Details of alternative
No other alternative site has been examined as the
sites examined, if any.
proposed expansion is planned within the existing area
Location of these sites
measuring 15,000 sqm. The location of the site is shown
should be shown on a
on the toposheet and enclosed as an Annexure-I.
Toposheet.
17.
Interlinked projects
No
18.
Whether separate
No
application of
interlinked project has
been submitted?
19.
If yes, date of
No
submission
20.
If no, reason
No
iii
Form I
21.
Whether the proposal
No
involves approval/
Clearance under: if
yes, details of the same
and their status to be
given.
The Forest
(Conservation) Act,
(1980)?
The Wildlife
(Protection) Act, 1972?
The C.R.Z. Notification,
1991?
22.
Whether there is any
No
Government
Order/Policy
relevant/relating to the
site:
23.
Forest land involved
No
(hectares)
24.
Whether there is any
No litigation is pending against the unit in any court of law.
litigation pending
against the project
and/or land in which
the project is proposed
to be set up?
Name of the Court
Case No.
Orders/directions of the
court, if any and its
relevance with the
proposed project.
25.
Expected cost of the
Existing : Rs. 926 lacs
project.
Proposed : Rs. 550 lacs
Total (after expansion): Rs. 1476 Lacs
iv
Form I
* Capacity corresponding to sectoral activity (such as production capacity for manufacturing,
mining lease area and production capacity for mineral production, area for mineral exploration,
length for linear transport infrastructure, generation capacity for power generation etc.,)
II
Activity
1.
Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use,
changes in water bodies etc.)
S.No. Information/Checklist
Yes/No
confirmation
Details thereof (with approximate quantities
/rates, wherever possible) with source of
information data
1.1
Permanent or temporary No
There is no change in land use as the existing
change on land use, land
land area measuring 15,000 sqm with the
cover
following break up is as follows.
or
including
topography
increase
in
Particulars
intensity of land use (with
Area
(sqm)
5250
2250
Perce
ntage
35.00
15.00
Plant Area
Road/Corrido
rs
Plantation
4950
33.00
Open Area
1550
17.00
Total
15,000
100
Land Cover: The existing project is located in
respect to local land use
plan)
notified RIICO Industrial area and the proposed
expansion is coming up in the existing land
area, thus there will not be any impact on the
physical
environment
due
to
proposed
expansion project.
Topography: The topography of the study area
shows that the area is plain and the highest
elevation of the study area is 485 m MSL and
the lowest elevation is 408 m MSL. There is no
perennial river. The overall topography will
remain same as at present.
1.2
1.3
Clearance of existing
No
It is an expansion project within the same
land, vegetation and
existing area and there will be no clearance of
buildings?
any existing land, vegetation and buildings.
Creation of new land
No
--
v
Form I
uses?
1.4
Pre-construction
No
--
Yes
Two additional Induction furnace , one AOD and
investigations e.g. bore
holes, soil testing?
1.5
Construction works?
one pulse jet bag filter will be installed
1.6
Demolition works?
No
--
1.7
Temporary sites used for
No
--
No
--
No
--
construction works or
housing of construction
workers?
1.8
Above ground buildings,
structures or earthworks
including linear
structures, cut and fill or
excavations.
1.9
Underground works
including mining or
tunneling?
1.10
Reclamation works?
No
--
1.11
Dredging?
No
--
1.12
Offshore structures?
No
--
1.13
Production and
Yes
Manufacturing process follow melting, casting of
manufacturing
MS & SS ingots through AOD and CCM. The
processes?
unit has planned to install two more induction
furnaces of 12 ton capacity each along with the
one rolling mill.
The unit will be manufacturing MS & SS ingots
and MS & SS bars, flats and rods.
1.14
Facilities for storage of
Yes
goods or materials?
The existing facilities for the storage of goods
and material will be used even after expansion
of the project, thus no physical changes will be
envisaged.
1.15
Facilities for treatment or
disposal of solid waste or
Yes
The water requirement in the project is mainly
for cooling purpose in continuous process. The
vi
Form I
liquid effluents?
water from the settling tank/cooling tank after
treatment will be re-circulated in the cooling
tower & plantation purpose also. The domestic
waste water is being treated in septic tank
which is followed by soak pit and the same will
be followed after expansion of the project.
The treatment or disposal of solid waste or
liquid effluent will be as follows:
Existing Phase:
Waste
Treatment
Slag from induction
furnace
Flue Gas
Domestic
waste
water
Industrial
waste
water
Domestic
waste
Used oil
Disposal
About
6-10%
being sold to
Cement
plants/Use
in
road
construction
/filling low lying
area in plant
premises
Being treated Collected dust
in the bag being sold to
house.
cement plants
Being treated in septic tank
followed
by
soak pit
Being treated Treated waste
in the settling water
being
tank/cooling
reused in the
tank
process
Being disposed
to
disposal
sites as per
MSW rules
Will be send to
the
registered
recyclers/ reused
as lubricant in
the plant
Operation Phase:
Waste
Treatment
Slag from induction
furnace
Slag from
vii
Disposal
About
6-10%
being sold to
Cement
plants/Use
in
Form I
AOD
Scaling
waste
1.16
1.17
Facilities for long term
No
road
construction
/filling low lying
area in plant
premises
Flue Gas
Being treated Collected dust
in the bag being sold to
house.
cement plants
Domestic
Being treated waste
in septic tank
water
followed
by
soak pit
Industrial
Being treated Treated waste
waste
in the settling water
being
water
tank/cooling
reused in the
tank
process
Domestic
Being disposed
waste
to
disposal
sites as per
MSW rules
Used oil
Will be send to
the
registered
recyclers/ reused
as lubricant in
the plant
Under expansion plan local people will be
housing of operational
employed, hence there will be no provision
workers?
made for housing of workers within the site.
New road, rail or sea No
-
traffic during construction
or operation?
1.18
New
road,
waterborne
transport
rail,
or
air No
-
other
infrastructure
including new or altered
routes
and
stations,
ports, airports etc?
1.19
Closure or diversion of No
-
existing transport routes
or infrastructure leading
to
changes
in
traffic
movements?
1.20
New or diverted
No
-
viii
Form I
transmission lines or
pipelines?
1.21
Impoundment, damming,
No
-
culverting, realignment or
other changes to the
hydrology of
watercourses or
aquifers?
1.22
Stream crossings?
No
--
1.23
Abstraction or transfers
Yes
The domestic & Industrial water requirement will
of water from ground or
be met from RIICO water supply
surface waters?
1.24
Changes in water bodies
No
or the land surface
The existing drainage pattern will be followed
without affecting drainage pattern.
affecting drainage or runoff?
1.25
Transport of personnel or Yes
With the expansion plan of the unit there will be
materials
for
an increase in raw material with increase in man
construction, operation or
power. In the existing project ten trucks/ day
decommissioning?
being used, after expansion it will increase to
sixteen trucks/ day for materials transportation.
The transportation of the raw materials and
manufactured goods to the desired destination
will be carried out by PUC vehicles. There will
be movement of personnel, material and
machineries.
1.26
Long-term dismantling or
No
--
No
--
yes
There will be temporary influx of people under
decommissioning or
restoration works?
1.27
Ongoing activity during
decommissioning which
could have an impact on
the environment?
1.28
Influx of people to an
area in either temporarily
expansion of the project. Local employment will
ix
Form I
or permanently?
be provided through the proposed expansion of
the project.
1.29
Introduction of alien
No
--
No
--
No
Nil
species?
1.30
Loss of native species or
genetic diversity?
1.31
Any other actions?
2.
Use of Natural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are nonrenewable or in short supply):
S.
Information/checklist
Yes
Details thereof (with approximate quantities
No.
confirmation
/No
/rates, wherever possible) with source of
information data
2.1
Land especially
No
No additional land will be acquired as the
expansion will occur within the same premises.
undeveloped or
agricultural land (ha)
2.2
Water (expected source
Yes
After proposed expansion
& competing users) unit:
Fresh Water requirement shall be 55 KLD
KLD
Source of Water : RIICO water supply
Industrial Process : 50 KLD for CCM & Rolling
Mill
Domestic Water Consumption: 10 KLD
2.3
Minerals (MT)
No
-
2.4
Construction material –
Yes
During expansion of the unit material will be
stone, aggregates, sand /
used for plant form for the induction furnace only.
soil (expected source –
1) Stone -100 tons
MT)
2)Aggregate-1000cu.ft
3)Sand-1000 cu.ft
The material will be sourced from the local
suppliers.
2.5
Forests and timber
No
-
Yes
The power requirement will increase as the
(source – MT)
2.6
Energy including
electricity and fuels
production capacity will increase by adding two
x
Form I
(source, competing
more Induction furnace of 12 Ton capacity, one
users) Unit: fuel (MT),
AOD, one rolling mill and one bag house. The
energy (MW)
proposed & existing power details are as follows.
Description
Existing
Proposed
Total
Contract
4995
13000
17995
demand
kVA
kVA
kVA
Connected
5250 kW
8000 kW
13250
load
kW
The 33 kV power line is laid down from the
nearest GSS located in the RIICO Industrial
area, Kaladera and the power increase will be
from 132 kV line from the same source power
supply.
Fuel: One D.G. Set capacity 400 kVA is installed
for the power backup for the common areas and
after expansion one more 600 kVA capacity D.G
set will be installed. Fuel required for the D.G.
set will be 206 ltrs/hr (80 ltr/ hr+126 ltr/hr).
2.7
Any
other
natural No
resources
-
(use
appropriate
standard
units)
3.
Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise concerns
about actual or perceived risks to human health.
S.
Information/Check list
Yes/
Details thereof (with approximate
No.
confirmation
No
quantities/rates, wherever possible) with
source of information data
3.1
Use of substances or No
materials,
which
are
hazardous
(as
per
--
MSIHC rules) to human
health
or
the
environment
(flora,
fauna,
water
and
xi
Form I
supplies)
3.2
Changes in occurrence No
of
disease
disease
or
-
affect
vectors
(e.g.
insect or water borne
diseases)
3.3
Affect the welfare of
No
-
people e.g. by changing
living conditions?
3.4
Vulnerable groups of
No
-
No
-
people who could be
affected by the project
e.g. hospital patients,
children, the elderly etc.
3.5
Any other causes
4.
Production of solid wastes during construction or operation or
decommissioning (MT/month)
S.
Information/Checklist
Yes/
Details thereof (with approximate
No.
confirmation
No
quantities/rates, wherever possible) with
source of information data
4.1
Spoil, overburden or
No
-
mine wastes
4.2
Municipal waste
Yes
Description
(domestic and or
commercial
wastes)
Quantity/day
Existing
30 Kg
Expansion
30 Kg
Total after
60 Kg
expansion
4.3
4.4
Hazardous wastes (as
Yes
Used oil (Category 5.1) According to Hazardous
per Hazardous Waste
Wastes
Management Rules)
Transboundary Movement) Rules, 2008.
Other industrial process
No
wastes.
(Management,
Handling
and
Slag generated from the induction furnace &
AOD and scaling waste will be generated.
4.5
Surplus product.
No
4.6
Sewage sludge or other No
The generation of sewage effluent will be sent to
xii
Form I
sludge
from
effluent
septic tank followed by soak pit. The generation
treatment.
Type
waste
of process waste will be treated as follows.
of
Existing
Quantity
(TPA)
1525
Proposed
quantity
(TPA)
5063
Quantity after
expansion
(TPA)
6588
Slag
Source of
waste
generation
Induction
furnace
AOD
-
1000
1000
Scaling waste
Rolling Mill
--
1000
1000
Bag filter
2.0
4.0
6.0
Workers
30 kg/day
30 kg/day
60 kg/day
Machines
2 KLPA
2KLPA
4KLPA
Slag
Dust/
Particulates
Domestic
Waste
Used oil
4.7
Construction or
No
--
No
--
No
--
Management
Will be Sold to
Cement
Industries/Use
in
road
construction
/filling low lying
area
in
plant
premises
Will be Sold to
Cement Industries
Will be Sold to
Cement Industries
Will be disposed as
per MSW Rules
Will be sold to
Authorized vendor
demolition wastes.
4.8
Redundant machinery or
equipment.
4.9
Contaminated soils or
other materials.
4.10
Agricultural wastes.
No
Not applicable
4.11
Other solid wastes.
No
--
5.
Release of pollutants or any hazardous, toxic or noxious substances to air
(Kg/hr)
S.
Information/ Checklist
Yes
Details thereof (with approximate
No.
confirmation
/No
quantities/rates, wherever possible) with
source of information data
5.1
Emissions from
Yes
The fugitive emissions will be generated from the
combustion of fossil
vehicles used for transportation and material
fuels from stationary or
handling.
mobile sources.
5.2
Emissions from
production processes.
Yes
The major source of emission in the existing
project is from Induction furnace which is being
controlled by bag house and after expansion one
xiii
Form I
more bag filter will be installed for the induction
furnace and AOD as per the Environment
Protection Act/Rule 1986.
5.3
Emissions from
Yes
Main source of emission is exhaust gases from
materials handling
the vehicles, However preference will be given to
including storage or
use the PUC certified vehicles to minimize the
transport
effect.
The fugitive dust emission are greatly reduced
(10 times) in case of paved surfaces. No
Unpaved surface shall be left in the unit to
restrict generation of fugitive dust.
5.4
Emissions
from No
construction
including
Fugitive emissions will be there
activities
plant
and
equipment
5.5
Dust or odors from
No
--
No
--
Emissions from burning No
--
handling of materials
including construction
materials, sewage and
waste.
5.6
Emissions from
incineration of waste
5.7
of waste in open air (e.g.
slash
materials,
construction debris)
5.8
Emissions from any
No
--
other sources
6.
Generation of Noise and Vibration, and Emissions of Light and Heat:
S.
Information/Checklist
No.
confirmation
Yes/No
Details
thereof
quantities/rates,
(with
wherever
approximate
possible)
with
source of information data with source of
information data
6.1
From operation of
equipment e.g. engines,
Yes
The noise will be generated from the operation
of the equipments like, materials handling, rolling
xiv
Form I
6.2
ventilation plant,
mill as well as light and heat will also be
crushers
generated from the induction furnaces.
From industrial or similar
Yes
processes
Thermal and gaseous emissions are significant
in steel manufacturing. The steel melting furnace
area will have the roof top ventilators to keep-off
the hot gases with the installation of fume
extraction system.
Acoustic treatment will be done for partition
compartments, machineries/equipments, pumps,
fans, compressors to reduce noise levels and
measures will also be taken to prevent the noise
pollution.
6.3
From construction or
No
No significant construction activities is involved
demolition
6.4
From blasting or piling
No
-
6.5
From construction or
Yes
During the proposed expansion construction
operational traffic
phase, noise will be generated from movement
of vehicles.
Transportation of the material & machineries will
be done at the peak time of the day.PUC
certified vehicles will be preferred.
6.6
From lighting or cooling
No
-
Yes
Heat, light and gaseous pollutants are emitted
systems
6.7
From any other sources
during melting of scrap iron.
7.
Risks of contamination of land or water from releases of pollutants into the
ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.
Information/Checklist
No.
confirmation
Yes/No
Details
thereof
quantities/rates,
(with
wherever
approximate
possible)
with
source of information data
7.1
From handling, storage, No
Used oil/ spent oil generated from DG set and
use
other machinery will be collected and disposed
or
spillage
of
hazardous materials
7.2
From
sewage
discharge
or
of to registered recyclers.
of No
--
other
xv
Form I
effluents to water or the
land
(expected
mode
and place of discharge)
7.3
By deposition of
No
--
pollutants emitted to air
into the land or into
water
7.4
From any other sources
No
--
7.5
Is there a risk of long No
--
term
build
up
pollutants
in
of
the
environment from these
sources?
8.
Risk of accidents during construction or operation of the Project, which could
affect human health or the environment
S.
Information/Checklist
No.
confirmation
Yes/No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
8.1
From
explosions, Yes
During
construction
/operation
phase
from
inappropriate handling of HSD; molten metal
storage, handling, use
may pose risk of fire & burns. Statutory warning
or
will be written /labeled wherever necessary &
spillages, fires
production
of
hazardous substances
appropriate measures will be adopted to avoid
risk.
8.2
From any other causes
8.3
Could the project be No
No. The site is in Kaladera, RIICO Indl. Area
affected
tehsil. Chomu, Distt. Jaipur, Rajasthan and falls
by
natural
disasters
causing
environmental
damage
(e.g
No
-
under seismic Zone-II.
Floods,
earthquakes, landslides,
cloudburst etc)?
9.
Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative
impacts with
other existing or planned activities in the locality
xvi
Form I
S.
Information/Checklist
No.
confirmation
9.1
Lead to development of Yes
The project depends on the power supply ,traffic
supporting
and adequately disposes the slag (waste)
cities,
ancillary development or
development stimulated
by the project which
could have impact on
the environment e.g.:
•
Supporting
infrastructure
(roads,
power supply, waste or
waste water treatment,
etc.)
• housing development
9.2
•
extractive industries
•
supply industries
•
other
Land use after use of No
-
the site, which could
have
an
impact
on
environment
9.3
Set a precedent for later No
-
developments
9.4
Have cumulative effects
No
-
due to proximity to other
existing or planned
projects with similar
effects.
II
Environmental Sensitivity (within 15 km radius – detailed as under): Study area
map of 15 km radius is enclosed as Annexure – II.
S.
Areas
Name/ Identity
others
Areas protected under Yes
Chomu Palace 11.36 km
None
international
(East)
No.
1
xvii
Form I
conventions, national or
local legislation for their
ecological,
landscape,
cultural or other related
value
2
Areas
which
are Yes
-Punana
ka
sar(water -
important or sensitive for
Body) ,12.00 km(aerial
ecological
distance)SW
reasons
-
Wetlands, watercourses
-River(Mendha)
or other water bodies,
km(NW)
coastal
-Bandi River ,11.7 Km
zone,
biospheres,
mountains,
9.38
(SE)
forests.
3
Areas used by protected, None
important
or
-
-
None
-
-
None
-
-
sensitive
species of flora or fauna
for
breeding,
nesting,
foraging, resting,
over
wintering, migration
4
Inland, coastal, marine
or underground waters
5
State, National
boundaries
6
Routes or facilities used
by the public for access
to recreation or other
tourist, pilgrim areas
Yes
Description
Loharwada Railway
station
Chomu Rly.Station
Jaipur Rly.Station
Sindhi Camp Bus
Stand
Chomu Bus stand
Jaipur Air port
National Highway11
State highway-8B
Chomu town
xviii
Distance from site
7.42 km (Aerial distance)
NE
9.44 km(Aerial distance) E
32.78(Aerial distance) SE
27.01 (Aerial distance)SE
11.44 km(Aerial distance)
E
41.41 km (Aerial distance)
SE
11.36 km (Aerial distance)
E
2.12 km (Aerial
distance)NE
10.96 km ( Aerial distance)
E
Form I
7
Defense installations
Yes
Jaipur Cantt.-31.19 km (SE)
8
Densely populated or
Yes
Chomu Town -10.96 km (E)
Yes
Hospitals, educational institutions facilities are
built-up area
Areas occupied by
sensitive man-made land
available in Kaladera & Chomu within area of 10
uses
km radius.
(hospitals,
HOSPITALS
Govindgarh samudayik
9.76 km (NE)
Hospital
Primary Govt. Hospital
2.02 km (NE)
,Kaladera
Sevayatan Hospital
11.69 km (E)
Chomu
Govt.Hospital Chomu
11.03 km (E)
EDUCATIONAL INSTITUTIONS
Sanskrit
2.16 km (NE)
College,Kaladera
Govt.Sr.Secondary
2.17 km (NE)
School,Govindgarh
SSG Pareek
11.00 km (E)
college,Chomu
Govt. Girls
12.40 km (E)
college,Chomu
Saraswati
Vidhya
niketan Sr. secondary
2.47 km (NE)
school Kaladera
Govt.School Kaladera
2.00 km(NE)
Ravindra School
2.44 Km(NE)
Kaladera
Govt.secondary
4.10 Km ( SW)
school,Durga ks Bas
schools, places of
worship, community
facilities)
10
Yes
Areas containing
-Chomu
important, high quality or
Palace-11.29
scarce resources
Km (E)
--
(ground water resources,
surface resources,
forestry, agriculture,
fisheries, tourism,
minerals)
11
Areas already subjected No
to
pollution
--
or
environmental damage.
(those
legal
where
existing
environmental
xix
None
Form I
standards
are
exceeded)
12
Areas susceptible to
No
The site is in Kaladera, RIICO Indl. Area tehsil.
natural hazard which
Chomu, Distt. Jaipur, Rajasthan and falls under
could cause the project
seismic Zone-II.
to present environmental
No major event is reported so far
problems (earthquakes,
subsidence, landslides,
erosion, flooding or
extreme or adverse
climatic conditions)
“I hereby undertake that the data and information given in the application and
enclosure are true to the best of my knowledge and belief and I am aware that if
any part of the data and information submitted is found to be false or misleading
at any stage, the project will be rejected and clearance given, if any to the project
is revoked at our risk and cost.”
Date:
M.K.Agarwal
(Director)
M/s Harikripa Business venture Pvt.ltd.
SP-37,Kaladera,RIICO Industrial
Area.Distt.Jaipur
Place: Kaladera
xx