NSRF MONITORING COMMITTEE THIRD MEETING 28 NOVEMBER 2008

State of Play of the Systems for Management and Implementation of the EU Structural Instruments

Operational Programme “Technical Assistance” European Regional Development Fund Boryana Pencheva Director Management of EU Funds Directorate Ministry of Finance

CONTENTS

 Optimization of the procedures  Strengthening the administrative capacity  Unified Management Information System  LOTHAR instrument  Information and publicity  Technical assistance

MEASURES FOR OPTIMIZATION OF THE PROCEDURES

 Amendments in CoM Decree No 182 on the establishment of Monitoring Committees of the National Strategic Reference Framework and the Operational Programmes:  Appointment of the deputy prime-minister for chairperson of the Monitoring Committee of the National Strategic Reference Framework;  Harmonization of the legislation for monitoring of the Structural Funds and Cohesion Fund – including definitions of the terms “Head of MA, CCU and CA”.

MEASURES FOR OPTIMIZATION OF THE PROCEDURES

 Amendments of CoM Decree No 121/2007 on awarding of grants under the Operational Programmes:  Defining a three months period for the evaluation;  Strengthening the publicity and transparency;  Declarations under art. 10 – for persons authorized to represent the candidate;  Changes in the guidelines for applicants after the launch of the schemes is forbidden;  Strengthening the coordination on the approval of major projects.

MEASURES FOR OPTIMIZATION OF THE PROCEDURES

 Draft CoM Decree amending CoM Decree No 55/2007 on award procedure conducted by beneficiaries of agreed grant:  Simplified regime compared to the similar Public Procurement Law procedures;  The procedure for restricted selection drops off;  Reconsideration of the requirement for the declarations for absence of certain circumstances;  Control regulation.

STRENGTHENING THE ADMINISTRATIVE CAPACITY

 Established Interministerial working group for strengthening the administrative capacity (Order of the prime minister No R-35 from 16 May 2008)  Preparation of trainings programmes on horizontal issues  Elaborated training plan for the experts from the structures responsible for the management, implementation and monitoring of the EU Structural Instruments  Three trainings conducted by 21 November 2008 – 168 experts from the MAs and IBs have been trained

UNIFIED MANAGEMENT INFORMATION SYSTEM

 Opertional modules:  Parameters;  Registration;  Evaluation;  Contracts.

 A contract for further development of the system has been signed on 17 September 2008.

 An interministerial working group has been established to assist the project implementation.

 10 meetings of the working group have been conducted.

UNIFIED MANAGEMENT INFORMATION SYSTEM

 An updated schedule for development of the complete functionality of the system has been prepared.

 A test version of the “Project management” module has been developed and installed.

 The “Financial” module and the module “On-the-spot checks and irregularities management” are under development.

3000

INFORMATION UPLOADED IN UMIS 2977 2417

2500 2000 1500 1000 500 0 Users

260 70

Procedures Candidates Project proposals Contracts

710

LOTHAR INSTRUMENT

 An interministerial working group was established on 9 April 2008.

 A mechanism for tracing of the forecast for the financial implementation of the OPs has been introduced.

 The first results are in place after the active application of LOTHAR.

60000000 50000000 40000000 30000000 20000000 10000000 0

Technical Assistance

INFORMATION AND PUBLICITY

 Established Interministerial working group for raising the transparency and unification of the web-sites of the operational programmes, co-financed by the European Union (Order of the deputy prime-minister No R-62 from 9 July 2008)  Specific regulations included in the CoM Decree №121/2007 to publish on the Unified information portal www.eufunds.bg

:  Indicative annual working programmes;   Calls for proposals; Lists of the approved projects.

STATE OF PLAY OF THE SYSTEMS FOR MANAGEMENT AND IMPLEMENTATION OF THE EU STRUCTURAL INSTRUMENTS THANK YOU FOR YOUR ATTENTION!

www.eufunds.bg