Cassidy Elementary – Renovation

Download Report

Transcript Cassidy Elementary – Renovation

Cassidy Elementary –
Renovation
• Architect:
Tate.Hill.Jacobs: Architects
• General Contractor:
• Substantial Completion Date:
• Contract Sum:
• Change Orders to Date (1):
• Current Phase:
• Estimated Completion:
D.W. Wilburn, Inc.
August, 2010
$9,061,000
$2,878.14
1 (On Schedule)
19%
August 2009
Cassidy Elementary –
Renovation
Rendering of Final Façade
August 2009
Cassidy Elementary –
Renovation
•Work Completed in Last 30 Days:
•Storm sewers installed on south side and across new front parking lot.
•Grading complete around new Morton Parking Lot. Concrete curbs and
subgrade installed.
•Grading started at sidewalks and playground. Concrete retaining walls in
place.
•Fire Protection water pit installed at Cassidy Rd. Gas main installed. Sanitary
sewer manholes and connector piping installed.
•Demolition continues with new stage opening and new openings and
doorways for corridor extensions. Stairway demolition is approximately 75%
complete.
•Foundations for stage complete.
•Music Classroom addition foundation, 1st floor slab, 2nd floor joist and slab
installed. Masonry bearing walls and steel column/beams complete. Interior
masonry partition walls on going.
•Plumbing rough-ins have continued as masonry walls are installed.
•Electric conduits and rough-ins continue in Admin Addition above ceiling and in
August 2009
masonry walls as needed.
Cassidy Elementary –
Renovation
•Current Work Effort (August):
•Storm sewers will continue as site work allows.
•New 3” domestic water main service will complete.
•Site grading will complete around the playground. Sidewalk/paving work will
complete at playground area.
•Chimney demolition to begin the first week of September – pending
confirmation that chimney swifts have vacated.
•Stage concrete slab and masonry bearing walls to be complete. Roof joists for
Music Rm. and Stage Addition to be in place.
•HVAC ducting and piping to start in the Admin. Addition and existing building in
Phase 1 area.
•Sprinkler piping to start in the Admin. Addition and existing building in Phase 1
area.
•Electric conduit and rough-ins to continue.
August 2009
Cassidy Elementary –
Renovation
New Admin. Addition 2nd
Fl.
New Playground Retaining
Walls
Interior Gym
New Stage & Music Room Addition
August 2009