Transcript Slide 1

AIXM 5 Development Status

AIXM – the first versions

Sources 1997 AICM 1.0

AIP

1999 AICM/AIXM 2.1

Jun 2003 EAD Operational 2002 AICM/AIXM 3.3

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

AIXM - Internationalization

Global Requirements Complete Data Model (Military/Civilian) Standards (ISO)

2002 Jun 2003 EAD Operational 2002 AICM/AIXM 3.3

2003 2004 Mar 2005 AIXM 4.0

Sep 2005 AIXM 4.5

2005 2006 2007

AIXM 5 - Global Standard

AIXM

Sep 05 AIXM 4.5

End 2007 - AIXM 5.0

Final Release 2006 2007 Release Candidate 1 Release Candidate 2 2008 2009

Mission

• Based on global aeronautical data requirements – ICAO standards and practices – Industry requirements • Modular and extensible • Support current and future AIM information system requirements – Digital AIPs – Automated charting and publications – Integrated digital NOTAMs – Aerodrome Mapping Databases and applications – Situational displays – Etc.

Conceptual (content) Model

AIXM components

Exchange format specification

Timeline

AIXM 5 Dynamic / delta (NOTAM) Static / baseline / AIRAC (AIP, charts, etc.) AIXM 3.3

AIXM 4.5

RC 1 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

AIXM 5 RC 1

• First draft UML model and XML schema • Starting from AIXM 4.5

• Still missing many features and attributes that are necessary in order to support digital NOTAMs

Timeline

AIXM 4.5

RC 1 2 AIXM 5 Dynamic / delta (NOTAM) Static / baseline / AIRAC (AIP, charts, etc.) AIXM 3.3

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

AIXM 5 RC 2

• Support for Airport Mapping Database (AMDB) • Obstacle model -> Vertical Structures model • Full compliance with the Geography Markup Language (ISO 19136) XML Schema • Refinement of the Temporality model • Punctual corrections and extensions following feedback from the stakeholder community

Timeline

AIXM 4.5

RC 1 2 3 AIXM 5 Dynamic / delta (NOTAM) Static / baseline / AIRAC (AIP, charts, etc.) AIXM 3.3

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

AIXM 5 RC 3

• Objectives – model for Aerial Refuelling Routes – model for Military Training Routes – “Digital NOTAM” message format – revision of the Service model ?

– rules for AIXM application schemas

Validation and implementation

AIXM 4.5

RC 1 trials, feasibility, planning, ...

AIXM 5 2 3 Dynamic / delta (NOTAM) Static / baseline / AIRAC (AIP, charts, etc.) AIXM 3.3

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

AIXM 5 trials

• EUROCONTROL – (TU Darmstadt, 2006) AMDB-xNOTAM – (TU Darmstadt, 2007) Procedures-xNOTAM – xNOTAM Trial (JAN-JUN 2008) • FAA – Digital NOTAM submission project …more details after the lunch break!