Transcript Slide 1

Accredited Standards Committee
C63® - EMC
Subcommittee 1:
Techniques and Developments
Zhong Chen
SC1 Chair
11-14-2013
1
Accredited Standards Committee
C63® - EMC
Scope
SC1 Techniques and Developments Scope
Subcommittee 1 provides the technical expertise and
resources necessary for maintaining existing and
newly proposed C63® approved standards
documents. New or existing measurement techniques
and associated instrumentation, measurement
methods, and limits development related to EMC are
incorporated as assigned by the Main Committee ASC
C63®.
2
Accredited Standards Committee
C63® - EMC
Memberships
•
Subcommittee 1 and Working Group Membership
List
• Two new members: Mits Samoto and Khairul
Aidi Zainal
3
Chair
Chen, Zhong
Vice Chair
Hodes, Harry
Secretary
O’Neil, Janet (non-voting)
Name
Role within Subcommittee 1
Affiliation
Arthurs, Mark
Attayi, Masud
Camell, Dennis
Chen, Zhong
DeLisi, Bob
Ghizzone, Dean
Griffin, Andy
Hare, Ed (non-voting)
Harrington, Tim
Heirman, Don
Hodes, Harry
Hofmann, Bob
Hoolihan, Dan
Kiemel, Greg
Klinger, Jeff
Kuczynski, Victor
Lombardi, Rick
Long, Randy
O’Neil, Janet
Parker, Doug
Pettit, Ghery
Potts. Nate
Samoto. Mits
Schafer, Werner
Sigouin, Dan
Silberberg, Jeffrey L
Member
Member
Member
Chair
Member
Member
Member
SC1 Web Content Manager
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Secretary
Member
Member
Member
Member
Member
Member
Member
Sony
Research In Motion
NIST
ETS-Lindgren
Underwriters Laboratory
Northwest EMC
CISCO Systems
ARRL
FCC
Don HEIRMAN Consultants
Proficiency Testing Services ng
Hofmann EMC Engineering
Hoolihan EMC Consulting
Northwest EMC
Compatible Electronics, Inc.
Vican Electronics
Visteon Corporation
Laboratory Accreditation Bureau
ETS-Lindgren
Liberty Labs
Intel
Liberty Labs
Liberty Labs Asia
Schaefer Associates
Industry Canada
FDA Center for Devices & Radiological Health
Umbdenstock, Don
Wall, Art
Ward, Dennis
Whitesell, Steve
Member
Member
Member
Member
TYCO International
Radio Regulatory Consultants
PCTEST Engineering Laboratory
Whitesell Consulting, LLC
4
Update on Working Groups
C63.4
Third Recirculation ballot sent to balloting group August
2013; closed in September 2013. Ballot met the approval
requirements
% approval (majority test) entire ballot body: 73%
% approval (2/3rd test) returned votes, excluding abstentions:
82.6 %
4 negative ballots
5
Third Recirculation Subjects
•
•
•
•
•
•
2 dB rule for cables and plug-ins (NR-new PINS)
Rack mounted equipment set up (NR-E)
Remove regulatory application of C63.4 (NR)
Revise procedures above 1 GHz (NR-new PINS)
Typo—change C63.26 to C63.23 (NR-E)
Modify that table top material does not always
affects measurements (NR-E)
• When hybrid antennas are used above 1 GHz
the test site is not to be qualified using absorber
patch (NR)
November 2013
C63® Meeting
Slide 6
Third Recirculation Subjects
• Recal for hybrids made same as other
antennas (NR-E)
• 1 dB hybrid antenna tolerance is justified
(NR)
• Date C63® references (NR)
NOTE: PINS proposal to cover many of these items will be
discussed later in the WG meeting
November 2013
C63® Meeting
Slide 7
Third Recirculation Subjects
• Enter items considered for future work into
present document (NR-new PINS)
• Do not lose outstanding issue for next edition (NRnew PINS)
•
•
•
•
•
Clarifying the use of CISPR 16-4-2 (MU)(NR-E)
Remove Annex N-waiting for C63.5 (NR-T)
Use “device” consistently (NR-E)
Remove antenna cal by accredited cal labs (NR-T)
Requirements for bonding impedance (NR-T)
November 2013
C63® Meeting
Slide 8
Motion
• Motion to request that C63.4 final
comment resolutions be circulated to the
balloting group, and subsequently C63.4
to move to publication.
9
WG C63.5 Status
• Several revisions were processed, last version D4.8
• IEEE reviewed and provided editorial comments – Aug
2013
• Sent to main committee – Sept 2013
• Balloting started – Oct 2013
• Ballot ended – Nov 8, 2013
SC1 – May 2013
10
WG C63.5 Status
IEEE statement of results
There were 26 people in the ballot pool and 20 balloters
responded. Of the 20 responses,
there were 6 disapprovals (with comments),
1 abstention,
10 approvals (with comments) and
3 approvals (with no comments).
The ballot did not pass according to the C63 Operating
Procedures as the majority of the balloting group did not
approve the document (13 out of 26 = 50%).
SC1 – May 2013
11
WG C63.5 Plans
• Compile comments and develop response.
• Incorporate comments into another draft for new ballot
• Re-circ ballot February next year
SC1 – May 2013
12
WG C63.25 status
• Measure TD and sVSWR at 4 spots and 2 heights in several labs.
 Need test plan
 Measure to 12 GHz
 Determine correlation between two methods.
 NWEMC chamber(s) measurement
 UL chamber measurement
• Look at using PODS/bicon as TD antenna
 Measure TD ringdown signature
 Study modeling of antennas
o Compare different antennas
o Revise current draft to update IEEE formatting.
SC1 - May 2013
13
WG C63.25 Plans
Measure UL SAC in November 2013
Measure other site(s) ?
Send out revised draft to WG by February 2014
SC1 - May 2013
14
C63.26/10
• WWG met on November 11th and 12th, 2013
1. 28 attendees (5 via webinar) + 9 observers
2. C63.10-2013 published on September 13, 2013
3. Reviewed draft of C63.26-201x
4. New draft to be compiled end of January, 2014 and
balloted within Subcommittee 1.
5. Voting results and comments to considered at next
WWG meeting
6. Revised PINS submitted for approval - compliance
testing of (licensed) transmitters used in licensed
radio services
C63.7
• New PINS C63.7
• Guide for Construction of Open-Area Test
Sites for Performing Radiated Emission
Measurements (Free Space OATS)
• Working groups formed with Don Heirman,
Bob Hofmann, Harry Hodes, Cooer
LaFond and Ray Klouda
• Initial draft is circulated with in the working
group.
16