IEC Working Group Updates

Download Report

Transcript IEC Working Group Updates

IEC WG Summaries
Austin, TX
October 24, 2007
WG 13 – EMS API
Convener: Terry Saxton
The principal task of the IEC 61970 series of
standards is to develop a set of guidelines and
standards to facilitate (1) the integration of
applications developed by different suppliers in
the control center environment and (2) the
exchange of information to systems external to
the control center environment.
WG13 – Activities
• NWIPs on:
– Model Exchange Headers (Lars-Ola)
– SE Solution Interface (Jay)
– EMS Model Update Interface (Jay)
– CIM OWL Schema (Arnold)
– Program Invocation through the GID (John)
• 301 Update each year
• Resolution of CIM issues
WG 14 - System Interfaces For
Distribution Management
Convener: Greg Robinson
Next steps for documents:
• Part 1: Interface Architecture and General Requirements
– (maintenance cycle) Revised document to IEC in February 2008
• Part 2: Glossary
– (maintenance cycle) Revised document to IEC in August 2008
• Part 3: Network Operations
– (maintenance cycle) Revised document to IEC in July 2008
• Part 4: Records & Asset Management
– FDIS released to IEC December 2006
• Part 5: Operational Planning and Optimization
– NWIP & initial CD to IEC in August 2008
• Part 6: Maintenance & Construction
– NWIP & initial CD to IEC by December 2007
• Part 7: Network Extension Planning
– NWIP & initial CD to IEC December 2008
WG14 - Activities
• Part 8: Customer Support
– NWIP & initial CD to IEC in September 2007
• Part 9: Meter Reading and Control
– Revised CD to IEC in September 2007
• Part 10: External to DMS
– NWIP & Initial CD to IEC in December 2008
• Part 11: Common Information Model for DMS
– NWIP & initial CD to IEC in February 2008
• Part 12: Use Case Technical Report
– NWIP & initial CD to IEC in July 2008
• Part 13: Common Distribution Power System Model
– FDIS to IEC in August 2007
• Part 14: XML Naming and Design Rules
– Draft document in review, NWIP & initial CD in February 2008
WG 16
Convener: Jim Waight
WG 19
Convener: Paul Skare
Scope: Interoperability within TC 57
Vision: All new TC57 standards should use/extend
the CIM as the common semantics for their
configuration/engineering modeling, and 61850
for [SCADA oriented / IED / field]
communications. Other existing standards would
likely take a mapping approach. Foster a
common data modeling approach across TC 57.
WG19 – Activities
• Reference Architecture: lead = Terry
Saxton
• Quality Codes: lead = Ketil Rian
• 61850 to Control Center: lead = Christoph
Brunner
• Good Working Practices document