Slayt 1 - ifrtr.com

Download Report

Transcript Slayt 1 - ifrtr.com

RAILWAY TRANSPORT IN TURKEY
Hacer UYARLAR
Board Member of UTIKAD
RAILWAY TRANSPORTATION
Total length of the railways 12.008 km
27 % is electrified
34 % is signallized
Private companies can operate own wagons
Monthly block train departures has reached to 5700
1000 block trains for international operations
13 block train routes to Europe
Automotive transportation by rail
RAILWAY NETWORK
Total Lines: 12.008 km (Convantional+High Speed)
FREIGHT TRANSPORTATION
Freight Transportation Nettonne
(Thousand)
Freight Transportain On the Basis of Goods
Nettonne
ELECTRIFICATION
3.216 km
8.792 km
27 %
73 %
Conventional lines : 2.328 km
High Speed Train lines : 888 km
SIGNALIZATION
4.016 km
7.992 km
34 %
66 %
Conventional lines : 3.128 km
High Speed Train lines : 872 km
LIBERALIZATION OF TURKISH RAILWAYS
“Rail transport will increase in Turkey”
Liberalization Law has entered into force as of 1 May 2013
Turkish State Railways Transportation Company is established
TCDD will be the operator of the national rail infrastructure network
Private companies can operate own locomotives & wagons
PUBLIC - PRIVATE SECTOR COOPERATION
With the railways being the prioritized transport policy since 2003, significant
steps were taken towards the development of advanced railways industry with
the cooperation of domestic and foreign private sector
entities and in this scope;
•
•
•
Adapazarı High Speed Train Factory (EUROTEM)
Çankırı High Speed Turnout Factory (VADEMSAŞ)
Sivas Modern Concrete Sleeper Factory (SİTAŞ)
were established
LOGISTICS CENTERS
 Samsun, Denizli and İzmit Logistics Centers are opened
 1. step of Eskişehir and Kayseri Logistics Centers are completed
 2. step of Eskişehir and 1. step of Erzurum Logistics Center are beginning to work
 Balıkesir Logistics Center is under construction, 2. step of Kayseri Logistics Center will be begin
 Other logistics centers’ projects are continuing
LOGISTICS CENTERS IN TURKEY
KOSEKOY / IZMIT
HALKALI / ISTANBUL
BOGAZKOPRU / KAYSERI
KEMALPASA / IZMIR
HASANBEY / ESKİŞEHİR
LOGISTICS CENTERS IN TURKEY
RAILWAY PROJECTS
MARMARAY
PROJECT
TRACECA
BALO PROJECT
SILK WIND BLOCK
TRAIN
KARS-TBILISI-BAKU
PROJECT
VIKING TRAIN
PROJECT
MARMARAY PROJECT
“Marmaray Project will be opened on 29 October 2013”
Rail tunnel under
Bosphorus
Marmaray project will
provide a continuous
communication
between the Asian
with European
continents.
Linking Europe rail
network to Middle East
and CIS
75.000 pax per hour in one direction / Total travel time: ~ 105 min.
A new capacity for the freight traffic (42 train per day)
BALO PROJECT
“Great Anatolian Logistics Organizations Project”
UTIKAD:
Shareholder of BALO
KARS - TBILISI – BAKU RAILWAY PROJECT
The foundation of the part in Turkey was laid on 24 July 2008
92% realization of the project in Turkish side was achieved
It is planned to complete the project within 2014
TRACECA
“The New Silk Road”
Aim:Strengthening of economic
relations, trade and transport
communication in the regions
of the Black Sea basin, South
Caucasus and Central Asia
owing to active work based on
political will and common
aspirations of all memberstates
Member Countries:
• Armenia
• Azerbaijan
• Bulgaria
• Georgia
• Iran
• Kazakhstan
• Kyrgyzstan
SILK WIND BLOCK TRAIN
Route: China - Kazakhstan - Caspian Sea - Black Sea
Countries:
 China
 Kazakhstan
 Azerbaijan
 Georgia
 Turkey
VIKING TRAIN PROJECT
The Black Sea is connecting with the Baltic Sea by the “Viking Train”
The connection of the Viking Train
will be able to be established to
Mediterranean, Europe, Middle East
and Central Asia via Turkey.
It is targeted to connect Europe to
Middle East and Cental Asia
through TRACECA Corridor in the
shortest way.
HIGH SPEED LINE PASSENGER
TRANSPORTATION
Opened Lines
 Ankara-Eskisehir High Speed Train
 Ankara – Konya High Speed Train
8.741.921 passengers were transported and 31.320 services were rendered by HST between March 2009 December 2012 on Ankara-Eskişehir and Ankara Konya lines. 3.349.524 passengers were transported in 2012,
corresponding to 31% increase as compared to 2011.
Under Construction Lines
 Ankara – Sivas High Speed Train
 Ankara – Izmir High Speed Train
 Bursa High Speed Train
Ankara-Istanbul High Speed ​Train Line
will be opened on 29 October 2013
HIGH SPEED RAILWAY LINES
Total Invest Amount
Construction Amount
High Train Multiple Unit (74 pcs)
Residuary Invest Amount
: 16
: 14
: 2
: 14
Billion
Billion
Billion
Billion
617 Million $
487 Million $
130 Million $
5 Million
$
While High Speed Train Project Completed;
As year ;
48 million passenger
2 billion 105 million $ revenue
916 million $ net revenue
ANKARA - ISTANBUL HIGH - SPEED TRAIN
PROJECT
FIATA WORLD CONGRESS 2014 - ISTANBUL
13 - 18 OCTOBER 2014
BOMONTI HILTON HOTEL & CONFERENCE CENTER
www.fiata2014.org
CONTACT DETAILS OF UTIKAD
ASSOCIATION OF INTERNATIONAL FORWARDING
AND LOGISTICS SERVICE PROVIDERS
General Manager
E-mail Address
Web Site
Phone
Fax
Address
: Mr. Cavit UGUR
: [email protected]
: www.utikad.org.tr
: + 90 212 663 62 61
: + 90 212 663 62 72
: Senlikkoy Mahallesi, Saci Sokak,
No:4/F, Florya 34153
Bakirkoy – Istanbul / TURKEY
Thank You
Hacer Uyarlar
Board Member of UTIKAD