[La petite BERTA] - OPAL
Download
Report
Transcript [La petite BERTA] - OPAL
•
•
•
•
•
Banc d’
Essais pour
Régulateurs
Turbines et
Alternateurs
(Bench)
(Tests for)
(Regulators)
(Turbines)
(Alternators)
AC Generator in Operation
• Synchronous Operation;
• Operation in Islanded System;
• In both modes of operation,
Speed/Frequency control is required.
AC Generator in Operation
In Both Modes
• To maintain balance and stability, mechanical power
must equal electric load;
• After a disturbance, system frequency should reset to its
set point value as fast as possible;
Two Important Principles
to Consider when Adjusting a Speed Governor
• Speed governor must be set to ensure
operating stability in an islanded power
system;
• Speed governor must avoid contributing to
natural electro-mechanical power
oscillations;
Synchronized Generator
• The synchronous interconnection transfers
the stabilizing energy from the stable units
to the unstable units;
• But does not stabilize a power system
where most of the units would be unstable
in an islanded system;
• Conclusion: every unit should be set to be
stable in islanded operation mode. That’s
the speed governor job.
Frequency behavior of an AC generator in an islanded
mode of operation
Frequency Behavior in a Multi-Machine System
P.S.S. Interference
WHAT’S RT-LAB BERTA FOR?
• Make unit under test contribute to power
system stability and frequency recovery;
• Test many speed governor settings
without threatening the grid stability;
• Validate speed governor and turbine
dynamic models in a closed loop set-up.
RT-LAB BERTA’s Main Feature
• MAKE THE ACTUAL
GENERATOR BEHAVE AS IF
OPERATING IN ISLANDED
MODE WHILE REMAINING
SYNCHRONIZED WITH THE
MAIN GRID;
• And set the speed governor consequently.
Modern PID Speed Governor
Servomotors
Chain
Permanent
Droop
Speed Governor Models
• Components hard to model:
– Frequency meter or speed sensor;
– Pilot Valve;
– Gate servomotors stroke and backlash;
– Mechanical regulator dash-pot (Temporary
droop).
• The older the equipment, the more difficult
to model adequately.
Hydraulic Turbine
Non-Linear Model
?
Many
Uncertainties
Water Starting Time
Net Head
?
?
?
Head Losses
Water Discharge
Modeling Techniques
• Use RTLAB-BERTA:
– Set the governor correctly according to
BERTA ’s real-time islanded mode simulation;
– Analyze the input/output signals and estimate
an appropriate model;
– Ask BERTA to compare the model behaviour
with the actual behaviour;
– During the same test session;
RT-LAB BERTA Test Bench Setup for
Actual Test in Powerhouse
SPEED GOVERNOR
BERTA TEST BENCH
TURBINE
GENERATOR
• RT-LAB BERTA Test Bench Software
includes the following modules:
– Digital calculators for frequency and electric
power;
– Modules to estimate the speed and
mechanical power;
– Real-time simulator of islanded power system
operation, including a P.S.S. simulation
function;
Islanded Operation Mode
Real-time Simulator
• Adequate setting adjustment of the governor,
considering actual system;
• Still considering the synchronizing effect;
• Allows to validate the turbine model at the actual
gate servomotor frequency of oscillation;
• Have a look on the next 2 slides: do you see a
big diffference between actual islanded
operation and RT-LAB BERTA’s simulation?
Actual Islanded System VS
BERTA’s Islanded System Simulator
Stable Case
Actual Islanded System VS
BERTA’s Islanded System Simulator
Unstable Case
P.S.S. Simulation Function
On-Site Tests with Different PID Settings
Islanded Operation Mode
Real-Time Simulator (next)
• What if your classical model is wrong?
• See next slide;
Reality VS Classical Model Simulation
Reality VS Classical Model Simulation
H-Q grid actual
frequency
Reality VS Classical Model Simulation
H-Q grid actual
frequency
Simulator Generated
Frequency
Islanded Operation Mode
Real-Time Simulator (next)
•
•
•
•
Now, modify your models;
It almost fits (red curve);
Black curve: turbine model modified;
Red curve: speed governor and turbine models
modified.
Matching Reality with Modified
Speed Governor Model
Turbine
and S.G.
Models
Modified
Turbine
Model
Modified
• RT-LAB BERTA’s islanded mode simulator is
well suited for all kinds of hydro and thermal AC
generator;
• They only need to be synchronized to the main
grid.
Voltage & Current Signal Panel
Connection Settings Panel
PID Controller Panel
Islanded Operation Simulation
Unstable Case
Islanded Operation Simulation
Stable Case
RT-LAB BERTA’s real-time computer, junction and switching boxes
and flat screen during on-site testing by Hydro-Québec powerhouse,
November 2008
Rear view of the RT-LAB BERTA real-time computer showing the I/O
connection with the speed governor during on-site testing by HydroQuébec powerhouse, November 2008
On-Site Tests. Two different sets of PID gains.
Frequency variation
On-Site Tests. Two different sets of PID gains.
Gate servomotors variation
On-Site Tests. Two different sets of settings.
Mechanical Power Variation