Update on OGC involvement in GEOSS

Download Report

Transcript Update on OGC involvement in GEOSS

Summary Kick-off meeting AIP-6
(March 28-29, NOAA, Washington DC)
Slides provided by
Bart De Lathouwer
Open Geospatial Consortium
AIP Lead
[email protected]
Architecture Implementation Pilot
•
„The GEOSS Architecture Implementation Pilot (AIP) develops
and deploys new process and infrastructure components for the
GEOSS Common Infrastructure (GCI) and the broader GEOSS
architecture.“
• AIP is an agile, evolutionary development process, that proves
the maturity of the infrastructure components.
• Need to establish a good set of standards and results that show
web access to large sets of EO data.
• The process was initiated in 2007. AIP-5 results:
– http://www.ogcnetwork.net/pub/ogcnetwork/GEOSS/AIP5/ind
ex.html
A process, elaboration of GEOSS Architecture
SBA Tasks,
UIC, CBC,
STC
URR, Data Sharing Task Force
Transfer to
operations
requirements
2011-2015
User
Needs,
Scenarios
Design,
Develop,
Deploy
support
ADC activities
including:
Architecture
Implementation
Pilot (AIP)
Task AR-09-01b
SIF outreach
Operational
Capability
GEOSS
Common
Infrastructure (GCI)
Task AR-09-01a
persistent
implementation
GCI-Coordination Team
Activities in an AIP phase
Participation
IN-05 Architecture Implementation Pilot
Evolutionary Development Process
Concept
Development
Participation
Call for
Participation
Updates for each step
Architecture
Documentation
Continuous interaction
with external activities
Participation
Kickoff
Workshop
Participation
Development
Activities
Baseline
Operational Baseline and Lessons Learned for next evolutionary spiral
Participation
Persistent
Operations
GEOSS Components – AIP Baseline
AIP Agile Development Phases
• AIP-1 Kickoff: Jun 2007; Alpha operations Nov 2007; Arch Workshop Feb 2008
– "Core" Architecture defined initial version of GCI
• AIP-2 Kickoff Sep 2008; demo ISRSE May 2009; Beta operations Sep 2009
– SBA implementations of common cross-cutting architecture;
Refined GCI concept supporting transition to operations
• AIP-3 Kickoff Mar 2010; results to Beijing Plenary; Complete Feb 2011
– Network building in GEOSS SBA communities;
Piloted Broker and Processing capabilities
• AIP-4 Kickoff May 2011; results to Istanbul Plenary; Complete Dec 2011
– Increased access to priority earth observation data; via
server software, tutorials and application clients
• AIP-5 Kickoff May 2012; results to Brazil Plenary; Complete Dec 2012
– SBA application scenarios; Research prototypes
“Fostering interoperability arrangements and common practices for GEOSS”
GEO Task IN-05
GEOSS Design & Interoperability
Priority Actions
• GEOSS Research and Prototyping
• GEOSS Interoperability Analysis and Support
• Encourage mature systems to interoperate with GCI
• Ensure access to GEOSS Data-CORE
Approach
• Manage evolutionary architecture of GEOSS
Standards and Interoperability Forum (SIF)
Architecture Implementation Pilot, Phase 5 (AIP-5)
Responses to AIP-6 Call for Participation
•
•
•
•
•
•
•
•
•
CITE-SENSE
COBWEB
Compusult
Esri
FCU
GEOSS Water Services
Geoviqua
GEOWOW & EarthServer
…
•
•
•
•
•
•
•
•
•
GLOS
INCOSE
ITRI
MEDINA
MINES ParisTech
NASA
Afriterra Foundation
GMU
…
Many more, as part of response. Please visit
http://www.ogcnetwork.net/node/1890
AIP-6 Kickoff Objectives
•
•
•
•
•
•
•
•
Mature AIP-5, SBA & Technical
Ministerial showcases - Sprint-to-Summit
Focus on Authentication & Data Sharing
More In-Situ observations
Involvement of Developing Countries
Increase Capacity Building
For the End-User (direct of indirect)
Increase awareness
– Use metrics
AIP-6 Working Group Leaders
• Water
– David Arctur
• Argiculture & Disasters
Managemnt
– Liping Di, Joan Maso
• Energy
– Lionel Menard
• Health & Climate &
Weather
– Arne Berre
• Data Sharing
– Steve Browdy
• Capacity Building
– Lucia Lovison-Golob
• GCI Research
– Joan Maso
• System Design
– Larry McGovern
AIP-6 Contributions – initial analysis
SBA
Organisation
He
Cl
We
CITI-SENSE
S,R
S,R
S,R
Dm
Ag
Technical
Wa
Bd
En
Eco
GCI
Sys
V
COBWEB
V
V
V
Compusult
S,R
V
Esri
S,R,A
FCU1
S,R
V
V
V
S,R
FCU2
GEOSS Water
Services
S,R
S,R,A
GeoViqua
GEOWOW &
EarthServer
S,R
V
S,R
V
V
V
V
V
GLOS
Incose
Auth
Dev
Countr End
Crowd Mobi In-Situ ies
User Capacity Building
S,R
A
A
A
ITRI
A
A
A
V
A
A
V
S,R,A
V
MEDINA
V
V
S,R,A S,R,A
MINES ParisTech
S,R,A
NASA
(Afriterra
Foundation)
GMU
S,R,A
V
S,R,A
V
S,R,A
1
2
1
5
2
5
1
1
1
V
V
V
V
V
V
V
V
V
V
AIP-6 Master Schedule
CFP Issued
CFP Response Due
Kickoff, Washington
Showcases
SBA Testing
GEO Plenary, Geneva
09-Feb-2013
15-Mar
28-Mar
15-May
01-Dec
17-Jan-2014
AIP Communication Plan
• Telecons
– AIP Plenary telecon – Tuesdays
• http://www.ogcnetwork.net/AIPtelecons
– WG Telecons – as determined by WG Leaders
• E-mail list-servers
– [email protected]
– Lists for working groups (see twiki)
• Collaboration Resources
– www.ogcnetwork.net/AIPilot
– Geoviqua Wiki for AIP internal dev.
http://twiki.grumets.uab.es/twiki/bin/view/AIP6/WebHome
– GEO Best practice Wiki http://seabass.ieee.org
Thanks to all who made
the AIP-6 Kickoff a success
• Thanks to Session Leaders, Rapporteurs and
Participants
• Thanks to NOAA for hosting the workshop
– Martin Yapur!
• Please contact Bart De Lathouwer if you would like to
participate
– Call remains open for the duration of the project
References
• GEO
– www.earthobservations.org
• GEO Architecture Implementation Pilot
– www.ogcnetwork.net/AIPilot
• GEOSS resources and SIF
– geossregistries.info