Transcript iti.vgtu.lt
ŽIRMŪNŲ G. 116 TEAM : Norbert Varnyu Andre Zeferino Laury Rocca Serra Kotryna Supejevaitė Liudmila Rapin Team introduction Laury Liudmila 21/07/2015 2 Greater Bamboo Lemur 21/07/2015 3 Greater Bamboo Lemur Facts about the greater bamboo lemur: it was believed to have become extinct by the early 20th century. only 60-160 lemurs are left in the wild. only lives in the jungles and forests of Madagascar; a star in the animated movie Madagascar. 21/07/2015 4 Content Problem statement Energy efficiency Heating system Design & construction Penthouse proposal Calculation of the investment & return 21/07/2015 5 21/07/2015 6 21/07/2015 7 Why renovate? PROBLEMS: Most in poor condition. Inefficient heating systems and engineering equipment. No insulation. Bad quality windows, roofs. Unattractive design. 21/07/2015 8 1. Energy efficiency Insulation of external walls External Insulation Insulation : 140 mm isover 32 λ = 0,032 W/m.K U-Value = 0,21 W/m2.K ϕ = 5,5 kW 21/07/2015 9 1. Energy efficiency Green roof Green roof substrate Filtre Layer Drainage layer Extensive green roof Insulation : 200 mm polyurethane λ = 0,025 W/m.K Protection mat Waterproof membrane Insulation Vapour control layer 21/07/2015 U-Value = 0,12 W/m2.K ϕ = 1,98 kW 10 1. Energy efficiency Ground floor Insulation of ground floor Insulation Slab Insulation : 200 mm polyurethane λ = 0,025 W/m.K U-Value = 0,123 W/m2.K ϕ = 0,6 kW 21/07/2015 11 1. Energy efficiency Sustainable and alternative insulation 21/07/2015 Embodied energy 12 1. Energy efficiency Windows and balcony doors thermal conductivity Price Maintenance Durability recyclable Wood PVC Aluminum 21/07/2015 13 1. Energy efficiency Windows and balcony doors PVC windows and balcony doors Double glass 4/16/4 mm λglass = 1,2 W/m.K λair = 0,027 W/m.K U-Value = 1,98 W/m2.K ϕ = 18,2 kW 21/07/2015 14 1. Energy efficiency Apartment access doors PVC Apartment access doors U-Value = 1,2 W/m2.K ϕ = 0,77 kW 21/07/2015 15 1. Energy efficiency Differences Actual/After 80 H E A T L O S S E S K W 70 60 After renovation Actual 50 40 30 20 10 0 21/07/2015 Roof construction Ground floor construction Dividing walls, stairwell External wall windows+balcony doors Apartment acces doors 16 1. Energy efficiency Total heat losses 21/07/2015 Actual After 137,5 kW 28,5 kW 17 1. Energy efficiency Consumption Actual After 275 kWh/m2/year 13 kWh/m2/year 21/07/2015 18 2. Heating system Choice of heat pump COP Tax credit Area required AIR/AIR GROUND/WATER 28,5 kW of heat losses 36kW for the heat pumps 1 heat pump for each part of building 2 heat pumps 21/07/2015 19 2. Heating system Choice of sensors Heat pump Horizontal sensors Vertical sensors Depth : 60/120cm Depth : 100m 21/07/2015 20 2. Heating system For the project Vertical sensors : 570 m of sensors 6 drilling of 95 m Horizontal sensors : 2880 ml of sensors 3000-3500 m2 of surface area 21/07/2015 21 2. Heating system Choice of sensors Efficiency Price Area required Vertical sensors Horizontal sensors 21/07/2015 22 2. Heating system 2 ways to install sensors Severals strates of sensors 1 strate of sensors 21/07/2015 23 2. Heating system Heat pump and system for 1 block of the building 21/07/2015 24 3. Design & construction Cladding alternatives alternatives stucco brick wood Cost product life (years) life cycle thinking practice average 50+ (depending on maintenance) good standard high 100+ good standard average 25-75 (depending on maintenance) good standard low 50 better May require some training (cutting & sealant joints) aluminum vinyl average low 20-50 25 good typical standard standard hardboard low 10-25 typical standard fibercement 21/07/2015 25 3. Design & construction Embodied energy for façade materials 21/07/2015 26 3. Design & construction Fiber cement board – Simple & Sustainable The nice thing about FCB is that its + usually made with recycled content, + has a long life span, + requires little maintenance, + economical, + unique design, + defense to moisture, rain, snow, or hail. The down side is - the embodied energy in its creation. 21/07/2015 27 3. Design & construction Cost effective "Cost Versus Value Report" Remodeling magazine 2009: „Siding replacement with fiber cement products – number one for four years as the leader in returning value for residentail remodeling and home resales.„ 21/07/2015 28 3. Design & construction Cladding system The original facade would insulated and overcladed 21/07/2015 29 3. Design & construction Cladding system 21/07/2015 30 3. Design & construction Cladding system Fire Barrier 21/07/2015 31 3. Design & construction Cladding system Frame 21/07/2015 32 3. Design & construction Window in the facade 21/07/2015 33 3. Design & construction Balcony 21/07/2015 34 3. Design & construction Lets bring a facade to life 21/07/2015 35 3. Design & construction Enclosing 1 Less corrosion 2 The risk of frost damage is eliminated 3 Reduced energy consumption 4 Lower maintenance costs 5 Noise reduction 6 Higher property value 7 Increased security 8 Better indoor climate 21/07/2015 36 3. Design & construction Frameless sliding system inexpensive and “lightweight” design Construction techniques Glass with casters, slides in two-track enclosed frame. 6mm thick, tempered glass. Windows can slide through entire length of the balcony. Seal brush inhibits wind vibrations. 21/07/2015 37 21/07/2015 38 3. Design and Construction The design idea: Recycling or up-cycling shipping containers Use simple and compact design; possibility for standardization or even prefabrication 21/07/2015 39 21/07/2015 40 3. Design and Construction Penthouses 56m2 each 4 penthouse all together Possibility to enhance the basic model and use renewable resources 21/07/2015 41 x. Green penthouse 21/07/2015 42 5. Calculation of the investment & return Phases Assumptions Cost calculation Financing options Returns calculation Performance indicators 21/07/2015 43 5. Calculation of the investment & return Assumptions Growth rate of energy and electricity prices: 5 %/y; Interest rate: 3 %/y; Inflaction rate: 2,6 %/y; Loan duration: 20 years; Project duration: 10 years; Duration of construction and retrofit : 6 months; Energy consuption: before 275KWh/m²/y, after 13 KWh/m²/y 21/07/2015 44 • 5. Calculation of the investment & return Cost calculation Construction costs of Penthouse Description Price € Quantity Cost € Refurbishment costs Windows/Doors € 43.913,04 Elevator (€/level) Staircase (lightweight) €/level Facade € 15.449,28 Building cost (€/m²) Balcony € 24.673,04 Insulation/Heating € 58.453,51 Roof € 71.478,26 Labor costs € 85.586,85 Maintenance costs € 2.400,00 Total cost € Description 21/07/2015 Cost Total cost Cost for an apartment 5300 10 € 53.000,00 1300 10 € 13.000,00 650 224 € 45.600,00 € 211.600,00 € 52.900,00 302.000 45 5. Calculation of the investment & return Financing options Total investment without penthouse € 302.000 1. Initial contribution (own funds) - 10% of total investment € 30.195,40 2. Financing of Government - 30 % of total investment because efficiency measures have reduced energy consumption at least 40% € 90.586,19 3. European project "Jessica" - 15 % of total investment € 45.293,10 4. Discounted bank loan € 120.129,86 5. Total Investment for owners € 150.325,26 Total investment with penthouse € 513.560 1. Initial contribution (own funds) - 10% of total investment € 30.195,40 2. Financing of Government - 30 % of total investment because efficiency measures have reduced energy consumption at least 40% € 90.586,19 3. European project "Jessica" - 15 % of total investment € 45.293,10 4. Discounted Bank loan € 308.118,98 5. Total Investment for owners 21/07/2015 € 338.314,38 46 5. Calculation of the investment & return Returns calculation - energy saving Year Price of Energy (€/KWh) Discounted heating cost of the whole house (€/year) Price of electricity €/KWh Discounted electricity cost of the whole house (€/year) Discounted saved sum € Amount saved over the years € 2014 0,085 42075,00 0,115 2691,00 39384,00 49230,00 2015 0,089 41835,94 0,121 2675,71 39160,23 88390,23 2016 0,094 41598,23 0,127 2660,51 38937,73 127327,95 2017 0,098 41361,88 0,133 2645,39 38716,49 166044,44 2018 0,103 41126,87 0,140 2630,36 38496,51 204540,95 2019 0,108 40893,19 0,147 2615,41 38277,78 242818,73 2020 0,114 40660,85 0,154 2600,55 38060,29 280879,02 2021 0,120 40429,82 0,162 2585,78 37844,04 318723,06 2022 0,126 40200,10 0,170 2571,09 37629,02 356352,08 2023 0,132 39971,69 0,178 2556,48 37415,22 393767,29 2024 0,138 39744,58 0,187 2541,95 37202,63 430969,92 21/07/2015 47 5. Calculation of the investment & return Returns calculation - sale of penthouse Estimated selling price/ 1m² € 1.300,00 Number of apartments 4 Square meters for an apartment (m²) 56 Cost of an apartment € Total amount of the sale € 291.200,00 72.800,00 We assume that: bank loan for 10 years with intrests 4,5% the apartments will be sold within 1 year of construction: and the present value is € 275.757,58 THE GAIN IS (275.757,58 – 187.989,12) = 87.768,46 € 21/07/2015 48 5. Calculation of the investment & return - Performance indicators without Pentahouse INVESTMENT COSTS FOR OWNER € 150.325,26 PAYBACK 2,5 years NPV € 280.644,66 ROI 187% ROI = 187 % 21/07/2015 with Penthouse INVESTMENT COSTS OF REFURBISHMENT € 150.325,26 PAYBACK 2,5 years NPV ROI € 280.644,66 187% INVESTMENT COSTS OF BUILDING € 187.989,12 NPV € 87.768,46 ROI 47% ROI = 234 % Investments cost = 338.314,38 49 5. Calculation of the investment & return Goals - Results: Need to continue renovation effort; Need to revive the construction sector during the crisis; Reduce the dependancy on imported fossil fuel supplies . 21/07/2015 50 Conclusion Saving 262 kWh/m2/year energy consumption. Heating system – geothermal heat pumps. Sustainable facade – fiber cement blocks, glazed balconies. Penthouse – extra 56 x 4 m2. Return 21/07/2015 51 ŽIRMŪNŲ G. 116 TEAM : Norbert Varnyu Andre Zeferino Laury Rocca Kotryna Supejevaitė Liudmila Rapin