Super-beam work package in the νDS
Download
Report
Transcript Super-beam work package in the νDS
Super-Beam work package
Marco Zito
Dapnia-Saclay
On behalf of the SB w2 team
EuroNu 5/2/2008
Thanks to M. Dracos for providing materials!
EuroNu CERN
February 5, 2008
Marco Zito
Outline
• About this workpackage
• Focusing on the most challenging/crucial problems :
–
–
–
–
The target - talk by C. Densham
The collector
The target/collector integration
Neutrino beam simulation
• Participating institutes: IN2P3, CEA/IRFU(previously
Dapnia), CCLRC, Cracow U. of Technology
• Deliverables and milestones -> a CDR for the
Superbeam!
EuroNu CERN
February 5, 2008
Marco Zito
What Euroν DS Superbeam is about-1
• Consider as baseline the SPL to Frejus concept
MEMPHYS
Far detector feasibility, excavation,
engineering is covered by the Laguna DS
EuroNu CERN
February 5, 2008
Marco Zito
What Euroν DS Superbeam is about-2
• Proton driver and target : many issues in common
between Super-Beam and NF
• Decide to join forces and tackle these problems in this
WP
• The NF WP will focus on the muon front-end
• The conclusion of this WP will then be incorporated in
the SB and NF CDR’s
EuroNu CERN
February 5, 2008
Marco Zito
SPL
• Important and very positive recent news (see next slides
from R. Garoby and F. Gerigk)
• CDR for SPL available
• Ongoing work by dedicated team
• Refinements, R/D, further studies in other frameworks
(HIPPI, IA …)
• Changes to this proton-driver design only from the
optimization of the target and collection or from the
physics and detector studies
EuroNu CERN
February 5, 2008
Marco Zito
CERN-AB-2007-014-PAF
EuroNu CERN
February 5, 2008
Marco Zito
EuroNu CERN
February 5, 2008
Marco Zito
EuroNu CERN
February 5, 2008
Marco Zito
EuroNu CERN
February 5, 2008
Marco Zito
Collector
• Main challenges:
• design of a high current pulsed power supply (300
kA/100 μs/50 Hz),
• cooling system in order to maintain the integrity of
the horn despite of the heat amount generated by
the energy deposition of the secondary particles
provided by the impact of the primary proton beam
onto the target,
• definition of the radiation tolerance,
• integration of the target.
EuroNu CERN
February 5, 2008
Marco Zito
Collectors
M. Dracos
horns
In operation
In operation
completed
Or solenoid
(SB)
built
MiniBooNE
EuroNu CERN
February
5, 2008
NUMI
Marco Zito
CNGS
K2K
Focusing system: magnetic horn
M. Dracos
Current of 300 kA
p
To decay channel
Protons
B=0
Hg Target
EuroNu CERN
February 5, 2008
B1/R
Marco Zito
Horn prototype ready for tests
EuroNu CERN
February 5, 2008
Marco Zito
M. Dracos
The power supply
Due to the high price go to a modular system and
increase small by small the current
EuroNu CERN
February 5, 2008
Marco Zito
M. Dracos
Neutrino Beam simulation
• Needed to optimize the target, collector, decay tunnel
• Use modern tools (GEANT 4) and recent data (HARP)
• Input to the physics work package for the performance
evaluation
• Need to develop in synergy with similar studies in
existing SB and in the IDS community
EuroNu CERN
February 5, 2008
Marco Zito
M. Dracos
P (kW)
"Physics" studies to be restarted
energy deposition
z (cm)
EuroNu CERN
February 5, 2008
corne 2
z (cm)
corne
Marco Zito
Sensitivity 3.5GeV
Dm223
Preliminary
90%CL
95%CL
99%CL
10-2
Minimum:
q13= 1.2°
(90%CL)
10-3
10-4
10-3
EuroNu CERN
February 5, 2008
10-2
Marco Zito
10-1
sin22q13
A.Cazes thesis
Deliverables
Deliverable
Delivery date (months)
Requirements for
proton driver
6
Target and Collection
design report
30
Target and Collection
integration
36
Beam characteristics
36
Final report
48
EuroNu CERN
February 5, 2008
Marco Zito
Milestones
Milestone
Delivery date (months)
Proton driver report
12
Prel. Design of Target and
Collection
24
1st Target and Collection
integration drawings
24
1st Est. of Nu Beam
Intensity
24
Final Target and Collection
36
integration drawings
Design of target station
40
Report on Nu Beam
Intensity
42
EuroNu CERN
February 5, 2008
Marco Zito
Conclusions
• SuperBeam work package of the Euroν DS is focusing on
the key issues for this project
• The SPL to Fréjus project is the baseline
• Excellent news from SPL side
• Feasibility and conceptual solutions for the target and
collector (horn) will be studied
• A strong European collaboration is ready to contribute to
this field
EuroNu CERN
February 5, 2008
Marco Zito