Network Connections – e-VLBI
Tasso Tzioumis
ATNF
Basic Network
•
•
•
•
•
•
2 dark fibres from NextGen network
AARNet3 regional network
CSIRO + Universities – Gigabit connections
“Production” network (~1 Gb/s)
“Research” Network (~10 Gb/s) x ?
CSIRO ITS Business Case
– ATNF inputs
– Submitted 13 May 2004
31/5/2004
A. Tzioumis
2
The NextGen Network
31/5/2004
A. Tzioumis
3
Network “Lighting up”
•
•
•
•
Dark Fibres (only 2 lit-up commercially)
Need equipment every 80 Km
$8-10M to light Base network
”Australia Research & Education Network”
(AREN) funding? – $5M
• AARNet management of connections
• Replace current phone/data links
31/5/2004
A. Tzioumis
4
Network speeds & costs
• Coarse Wave Division Multiplex (CWDM)
– 8 x 1 Gb/s
– Relatively inexpensive
– Lifecycle 3-4 years
– CSIRO $1-1.5M + $150-350k/year
• Dense Wave Division Multiplex (DWDM)
– 80 x 10 Gb/s (or 40 Gb/s)
– CSIRO $1.7-2.5M + $300-500k/year
– Lifecycle >10 years
31/5/2004
A. Tzioumis
5
“Last mile” connections
• Need network “tail-end” connections to
each site
• Expensive BUT included in budgets
• AARNet will manage project
• Sites provide “air-conditioned” rack
• ATNF sites surveyed and costed (NDC)
• Connection Maps
31/5/2004
A. Tzioumis
6
Parkes Connections
31/5/2004
A. Tzioumis
7
Mopra Connections
31/5/2004
A. Tzioumis
8
Narrabri Connections
31/5/2004
A. Tzioumis
9
Production Network
ANU, Siding
Springs
ATNF Mopra
(Coonabarab
ran)
ATNF
Narrabri
Cotton
Research
Narrabri
ATNF Parkes
AARNet Regional Network
Sydney
Access
Node, UTS
10
Research Network
ATNF
Narrabri
ATNF
Mopra
ATNF
Parkes
ATNF
Epping
SX
Transport
Tidbinbilla
This Project
Swinburne
Univ
Ceduna
Mt
Pleasant,
Tas
Related (future) Projects
11
Tail Link Costs
• Production net - $900k-1.4M
– +$40k per extra link
• Research DWDM network
• 10 Gb/s links
– $72k for link <600 Km (Mopra, Parkes)
– $144k for link >600 Km (Epping)
• Tidbinbilla “in scope”
– Link with ICON network
– Up to $400k?
– ANU/Stromlo connections
31/5/2004
A. Tzioumis
12
Related & Future links
• Mt. Pleasant observatory
– LIEF proposal
• Ceduna Radio telescope
– Long distance (200km) to NextGen
– Telstra?
• Swinburne
– Capital cities network – Traffic?
• NTD pathfinder in WA ?
– New Norcia?
• Overseas – Japan, USA
31/5/2004
A. Tzioumis
13
Key Milestones
Event/Milestone
Deliverable
Date
AARNet secures AREN Agreement with DEST
funding
May-04
AARNet completes RFT
for equipment
Supplier selected and equipment
costs known
May-04
AARNet secures
member sign-offs
Agreement from participating
universities and CSIRO
Jun-04
AARNet provides
physical connections to
CSIRO sites
Connections into active equipment
in site computer rooms
Aug-04
Production network
operational with gigabit
links
Cutover from existing leased lines
to gigabit backbone
Aug-04
Research network links
(first phase) operational
Dedicated links operate at 1 Gb
Nov-04
Benefits
•
•
•
•
•
eVLBI – World leader
Data Grid – AVO
Pulsar Timing (ATNF – Swinburne)
Efficient Service delivery (one-IT)
Research Net – enhance CSIRO
reputation
• (AREN is $42.5M project)
31/5/2004
A. Tzioumis
15
eVLBI - Opportunity
• Production network will happen
– Independent of eVLBI
• Great opportunity
– High BW connections to telescopes
– Minimal cost to ATNF/Unis
– “leverage” on developments
• Unique opportunity – MUST take!!
31/5/2004
A. Tzioumis
16