Transcript Slide 1
CMID
REPORT
SEQUENCES
This report is prepared along the following
headings of:
1. 0 Background of Company
Cooperate Mission
Vision
Range of Engineering Consultancy
Range of Services
Bank Facilities (If any)
Asset and Machinery
Previous and on going project
Company membership (if Any)
Corporate Information (detail)
Organisation Chart
Personal Information staff
2.0 Background of Project
Introduction
Objective
Problem Statement
Project Particular
Scope of Project
Project Planning
The join venture company (if Any)
3.0 Feasibilities Studies Report
3.1 Site Preparation and Analysis
Strategy Located
Existing Condition
Site analysis (photograph, Map, etc)
Topography
Soil investigation data
Or Surveying data
Or water related data, etc
3.2 Preliminary Studies
SWOT Analysis of Proposed Project
Advantage of The Project
3.3 Project Development Cost
Introduction
Development Program
Assumption
Estimated Project Development Cost
Pre Development Cost
Construction Cost (building/road/water
structure/infrastructure, etc)
LINTON UNIVERSITY COLLEGE
SCHOOL OF CIVIL ENGINEERING
4.0 Agreement with Specification
Procurement Methods
Contract Agreements
Contract Document
Condition
Form of Tender
Special of provision
Letter of Acceptance
Contract Drawing
Specification of infrastructure (building,
road, etc)
5.0 Detail Design Development + Drawing
Introduction
Plan and Elevation
Structural/Road/Water structure Design
(using Staad pro/Mx Road/etc)
(3D)+crosss Section detail-----
emphasize…!!!!!
Standard Code (BS. AASHTO, etc)
6.0 Infrastructure and Utilities
Parking and road network
Electricity
Water Supply
Sewerage and Drainage system
Etc
7.0 Project management Technique
Project Schedule and Planning
Work Breakdown Structures
Gantt Chart (use Microsoft Project)
Critical Path Methods (CPM)
8.0 Health Safety Aspect and Construction
methods
Introduction
Health and safety project
Safety Management
Regulation building/road/water treatment
for health and safety
Procedures of Works
Quality Management (QA/QC)
Machinery and Material management
Procedures of works
Surveying work
Piling
RC
Or earthwork
Cut and fill
Retaining wall, etc
9.0 Conclusion and Recommendation
References
Appendices
LINTON UNIVERSITY COLLEGE
SCHOOL OF CIVIL ENGINEERING