Transcript Slide 1

CMID
REPORT
SEQUENCES
This report is prepared along the following


headings of:
1. 0 Background of Company
 Cooperate Mission
 Vision
 Range of Engineering Consultancy
 Range of Services
 Bank Facilities (If any)
 Asset and Machinery
 Previous and on going project
 Company membership (if Any)
 Corporate Information (detail)
 Organisation Chart
 Personal Information staff
2.0 Background of Project
 Introduction
 Objective
 Problem Statement
 Project Particular
 Scope of Project
 Project Planning
 The join venture company (if Any)


3.0 Feasibilities Studies Report
3.1 Site Preparation and Analysis
 Strategy Located
 Existing Condition
 Site analysis (photograph, Map, etc)
 Topography
 Soil investigation data
 Or Surveying data
 Or water related data, etc
3.2 Preliminary Studies
 SWOT Analysis of Proposed Project
 Advantage of The Project
3.3 Project Development Cost
 Introduction
 Development Program
 Assumption
 Estimated Project Development Cost
 Pre Development Cost
 Construction Cost (building/road/water
structure/infrastructure, etc)
LINTON UNIVERSITY COLLEGE
SCHOOL OF CIVIL ENGINEERING

4.0 Agreement with Specification
 Procurement Methods
 Contract Agreements
 Contract Document
 Condition
 Form of Tender
 Special of provision
 Letter of Acceptance
 Contract Drawing
 Specification of infrastructure (building,
road, etc)

5.0 Detail Design Development + Drawing
 Introduction
 Plan and Elevation
 Structural/Road/Water structure Design
(using Staad pro/Mx Road/etc)
 (3D)+crosss Section detail-----
emphasize…!!!!!
 Standard Code (BS. AASHTO, etc)

6.0 Infrastructure and Utilities
 Parking and road network
 Electricity
 Water Supply
 Sewerage and Drainage system
 Etc

7.0 Project management Technique
 Project Schedule and Planning
 Work Breakdown Structures
 Gantt Chart (use Microsoft Project)
 Critical Path Methods (CPM)

8.0 Health Safety Aspect and Construction
methods
 Introduction
 Health and safety project
 Safety Management
 Regulation building/road/water treatment
for health and safety
 Procedures of Works
 Quality Management (QA/QC)
 Machinery and Material management
 Procedures of works
 Surveying work
 Piling
 RC
 Or earthwork
 Cut and fill
 Retaining wall, etc
9.0 Conclusion and Recommendation
References
Appendices



LINTON UNIVERSITY COLLEGE
SCHOOL OF CIVIL ENGINEERING