Transcript Document
C-15 Stormwater Utility & Response Team: A Small Business Approach Stormwater Utility Demand Rutgers University was contracted by the Meadowlands Commission to determine the feasibility of a Stormwater Utility. The Stormwater Utility Feasibility Report was issued in July 2007. They are rapidly becoming a necessity in New Jersey for managing aging infrastructure and minimizing the impact of vast impervious surfaces. The creation of these utilities will result in charging fees to residents and business owners to support better stormwater management that will reduce flooding and improve water quality. Plan for Small Business This business plan examines the opportunities of the Stormwater Response Team to either market their services to individual property owners or work directly for the Stormwater Utility. The differences between these two approaches are examined below. Working Directly with residents and business ownersServices: To help private owners reduce their contribution to flooding for a reduction in their stormwater utility fee Marketing: Strategy should focus on fee reduction and increased business revenue and improved quality of life Functions Working Under the Utility The Stormwater Utilitiy Feasibility Report describes three levels of responsibility that can be achieved by a utility and its expected cost based on level of involvement. •Scenario 1: Operation & Maintenance (O+M) only - $1.8M •Scenario 2: Maintenance & Critical Improvements “Minor Copex” - $4.0M (Scenario 1 & replacement of major water control structure per year) •Scenario 3: Maintenance & Critical Improvements Plus Plan “Major Copex” - $6.7M (Scenarios 1 and 2 & complete implementation of Floodplain Management Plan over a ten-year period. Services: To conduct audits of businesses within areas known to be susceptible to flooding. The utility uses their fees to pay the Response Team to examine opportunities for installing stromwater management. Marketing: Strategy should focus on how working with firm can only benefit users by improving conditions of their property and surrounding work area. Should also include distribution of educational material to inform community of stormater issues and proactive solutions Cost The user fee of the utility is based on the amount of impervious surface owned by the user. It turns out to be $31.06/1000ft2 per year. The Feasibility Study states that the minimum allowable fee in order to complete basic O+M is $8.44/1000ft2 per year. Structural BMPs cost more than this to install and design. Even with fee reduction, the real economic incentive to encourage owners to be proactive is the increase in business revenue they will receive from reduction of flooding. Cost for both approaches is the same and summarized in table 1: Staff Quantity Engineers 2 Secretary 1 Total Direct Costs: Overhead (30%): Profit (30%) TOTAL ANNUAL BUDGET: Salary $60,000 $40,000 Table 1: Estimate of Operating Cost for Business Total $120,000 $40,000 $160,000 $48,000 $48,000 $256,000