Transcript Slide 1
We Moved Your Core? What happens when Housing, Greek Life, and Construction Collide Versus? Micheal K. Seraphin Coordinator of Purchasing, Willamette University NWACUHO 2010 February, 8, 2010 Why this session? • History between Willamette and National Fraternities • Commitment on the part of the Willamette • Student Input & Involvement • Budgeting • Master Planning • My limitations as the presenter – I was the Area Coordinator for the Fraternities during ¾ of this process, and the Coordinator of Purchasing the other ¼. I do not work in Facilities or Project Management How did Willamette get to this point? G. Herbert Smith – 1927 DePauw University alum • President, Willamette University President from 1942-1969 • Secretary General, Beta Theta Pi Fraternity, 1935-1946 • President, Beta Theta Pi Fraternity, 1946-1951 • Fraternities vs. Residence Halls • Starting in 1946 – Five national fraternities have been housed on Willamette’s campus ▫ Beta Theta Pi ▫ Delta Tau Delta ▫ Phi Delta Theta ▫ Sigma Alpha Epsilon ▫ Sigma Chi The Process Fall 2007 Spring 2008/Summer 20008 • Breaking the news ▫ What the men felt ▫ Concerns they had ▫ How was the University going to accommodate them? ▫ Entitlement issues • Finding a new home • Controlling the flow of information • Meetings, meetings, more meetings • • • • • • • More meetings Damage control Preparation Making accommodations Bricks and trees Damages to the facility Saving goodbye Photos - Old Beta Theta Pi 5.30.08 Budget – Demolition of “Old Beta” Budget Changes Encumbrances (Encum. – Expen.) Over / Under Expense to Date Not to exceed $5k $ 5,000.00 $ 5,000.00 $ $ 2,250.00 $ 2,250.00 $ $ 710.00 $ 709.70 $ 709.70 Permits / Development Fees $ 710.00 $ 702.58 $ 702.58 $ - General Contractor HOFFMAN $ 150,000.00 $ 150,000.00 $ 150,000.00 $ - Owner Provided Construction $ 600.00 $ 561.27 $ 561.27 $ - Owner Provided FFE's $ - $ - $ - $ - Asbestos / Lead Abatement at BETA Demo $ 5,000.00 $ 35,450.50 $ 30,450.50 $ De-Commission Power / HVAC / Site Utilities $ 2,000.00 $ 5,051.40 $ 4,122.04 $ $ - $ - $ - Architectural Fees - HEA Engineering Fees - BMGP Engineering Plan Check Fee Salvage BETA Stoop and Chapter Stuff 30,500.00 $ $ $ Temporary Secure Baxter Excavation Fill Hole / Grading / Special Inspect 152.20 1,000.00 In Hoffman $ In Hoffman Moving / Storage of BETA Personal Items Total $ 2,000.00 $ $ 186,810.00 $ 4,980.00 $ 20.00 672.00 $ 1,578.00 5,000.00 929.36 - $ - $ - $ - 4,500.00 $ 6,412.44 $ 6,412.44 $ - 9,652.20 $ 198,178.19 $ 192,248.83 Photos - BETA Demo Summer 08 Budget – Backfill of “Old Beta” Budget Encumbrances Architect Fees $ Equip, Furniture $ - Other Costs $ 3,800.00 Construction $ 7,500.00 $ $ 47,300.00 $ Total 36,000.00 Changes $ $ Expense to Date 35,000.00 $ - 35,227.04 $ 4,251.50 $0.00 $ 0.00 - $ 6,999.00 35,000.00 $ 46,477.54 (Encum. – Expen.) Over / Under Photos - Beta Theta Pi Backfill Budget - General Budget Changes Architectural Fees Architectural Expenses- Added to budget will change $ 100,350.00 $ $ Engineering Fees Encumbrances Expense to Date (Encum. – Expen.) Over / Under 25,000.00 $ 125,350.00 $ 4,990.51 $ 4,990.51 $ 4,990.51 $ 2,700.00 $ 2,683.40 $ 2,254.40 $ Plan Check Fee $ 3,400.00 $ 70.10 $ 3,470.10 $ 3,470.10 $ - Building Permit(s) $ 4,100.00 $ 486.64 $ 4,472.89 $ 4,472.89 $ - Abatement General Contractor - FORTIS CONSTRUCTION Owner Provided Construction (w/WITS / Security) $ 24,000.00 $ (136.00) $ 23,864.00 $ 23,864.00 $ - $ 1,137,011.00 $ 87,101.00 $ 1,267,101.00 $ 1,203,745.95 $ $ 50,000.00 $ (5,242.12) $ 44,757.88 $ 44,757.88 $ - $ 25,000.00 $ (24,325.00) $ 675.00 $ 675.00 $ - $ (25,000.00) $ Owner Provided FFE's <Less Architectural Fee for Terra South> TOTAL: $ 1,351,551.51 $ 57,954.62 $ 115,560.84 $ (25,000.00) 1,452,364.78 $ 1,403,791.57 9,789.16 429.00 63,355.05 Other Construction Costs Budget Changes Encumbrances Expense to Date Entrance Controls $ 565.00 $ 565.00 $ 565.00 White Glove $ 510.00 $ 510.00 $ 510.00 Christensen Electric $ 14,320.50 $ 14,320.50 $ 14,320.50 JE Fire Watch $ 748.00 $ 748.00 $ 748.00 Salem Blue $ 82.68 $ 82.68 $ 82.68 Salem Blue $ 10.10 $ 10.10 $ 10.10 Salem Blue $ 5.40 $ 5.40 $ 5.40 River City Excavation $ 19,465.00 $ 19,465.00 $ 19,465.00 A-1 Striping Co. $ 360.00 $ 360.00 $ 360.00 Lowes $ 60.20 $ 60.20 $ 60.20 Sonitrol $ 1,250.00 $ 1,250.00 $ 1,250.00 Sonitrol $ 1,250.00 $ 1,250.00 $ 1,250.00 River City Excavation $ (5,093.00) $ (5,093.00) $ (5,093.00) $ 44.757.88 $ 44757.88 $ 44757.88 Total: Purpose Entrance Technology Fiber Fire Line Security Fire etc. Photos - New Beta Construction 2008_06_13 Total Expenses to Date… • $ 1,687,275.82 Photos - Beta Theta Pi 2010 Things to Consider/Lessons Learned • When to bring students into the process • Communicating with the rest of the campus • Communicating with the other potential students/residential communities • Real wants vs. real needs • Dealing with inter-organizational communication/issues Thanks for the following: • Jan Gardner – Director of Facilities • Cindy Anderson – Assistant to the Director of Facilities • The Men of the Gamma Sigma chapter of Beta Theta Pi • The Men of the Delta Zeta chapter of Sigma Chi Questions ? Micheal K. Seraphin [email protected]