Transcript Slide 1

80.45 KM
TADIPUDI LIFT IRRIGATION SCHEME
L1
KM 5
GODAVARI
RIVER
L2
KM 15.90
L3
KM 33.50
L4
KM 80
0.00 KM
1st
Lift Height
Pumps
each
Discharge
Agreement Date
Present Stage
Length of the canal
Ayacut
Power required
Tender Amount
Pump House, Pressure Mains, Cistern : Progress
2nd Pump House, Pressure Mains
: Progress
Main Canal
: Progress
2nd
Lift Pumps, Pump Houses, Pres. Mains : Designs
&Drawings
Under
Approval
Utilisation : 14.40 TMC
Ayacut
: 2,06,600 Acres
PUMP
HOUSE
DELIVERY
CISTERN
MAIN
: 27.00 Mts
: 6 Nos. of 4,000 HP
: 700 Cusecs.
: 23-1-2004
: work in progress
: 80.45 Km.
: 2,06,572 Acres
: 28 MW
: Rs. 302.64 Cr.
CANAL
L1
KM 5
L2
KM 15.90
L3
KM 33.50
L4
KM 80
PROGRESS
4 Nos. of 3,000 HP each
For each pump house (2 Pump houses)
80.45 KM
TADIPUDI (V)
(WEST GODAVARI (DT))
PSC PRESSURE
MAINS (2 x 6
Nos.)
0.00 KM
GODAVARI
RIVER
TADIPUDI LIFT IRRIGATION SCHEME
1
PROJECT PROFILE : Located near Tadipudi (V) of West Godavari District about km 26.20
upstream of SACB, Dowlaiswaram
1)Rs. 132.00 Crs.,(G. O. Ms. No. 127, Dt: 27-803
2
Administrative Sanction Rs. 295.80 Crs.
: 2) Rs. 105 Crs G., O. Ms. No. 9, Dt: 20-1-2004
3) Rs. 58.40 Crs.,G. O. Ms. No. 13, Dt: 20-12005
3
No. of EPC Packages (2 old packages + 2 new
packages)
: 4 Nos
4
Agreement value of 4 packages
: 302.65 Crs.
5
Budget provision for 200607
: Rs.100 Crs.
6
Expenditure of the project
2004 – 05 : Rs. 48.06 Crs.
2005 – 06 : Rs. 43.11 Crs.
Cum. Exp.
7
8
: Rs. 91.17 Crs
Utilisation
: 14.47 TMC
Drinking water
: 5.3 lakh population
Ayacut
By gravity
: 1,38,000 acres
By lift
:
68,600 acres
Lift-I @ Km 5.0
Lift Height
: 21.305 M
No. of Pumps
: 1 No.
Total pumps capacity
: 1 x 370 HPs
Lift-II @ Km 30.25
Lift Height
: 23.13 M
No. of Pumps
: 2 Nos.
Total pumps capacity
: 2 x 510 HPs
Lift-III @ Km 39.45
Lift Height
: 24.108 M
No. of Pumps
: 3 No.
Total pumps capacity
: 3 x 900 HPs
Lift-IV @ Km 80.891
Lift Height
: 12 M
No. of Pumps
: 3 Nos.
Total pumps capacity
: 3 x 1230 HPs
Power required
: 23 MW
10
Land Acquisition
Required
: 2047 acres
Acquired
:
12
Estimated cost of L.A.
13
Mob. Advance (Rs. in Crores.)
733 acres
: Rs.41.51 Crs
Paid
Recovered
2004-05 : 15.04
5.34
2005-06 : 3.15
--
Total : 18.19
5.34
TADIPUDI LIFT IRRIGATION SCHEME
PKG
No.
Description
Agt. Value &
Date
Agt.
Period
Name of the
contractor
1
Supply, commissioning of pumping
machinery construction of pump house,
delivery cistern, 1st pump house
Rs. 30.47 Cr
Dt: 23-1-2004
18 Months
M/s KBL Ltd, Pune
2
Supply, commissioning of pumping
machinery construction of pump house,
delivery cistern, 2nd pump house
Rs. 30.81 Cr
Dt: 22-07-04
18 Months
M/s NCC Ltd, Hyd
3
Execution of main canal from KM 0.0 to
Km 80.450 to irrigate an ayacut of 1,38,000
Acres
Rs. 178.36 Cr
Dt: 04-10-2004
24 Months
M/s Maytas Infra Ltd,
Hyd
4
Construction of 4 Nos. of Lift Irrigation
Schemes (II lift), commissioning of
pumping machinery, construction of
pump house
Rs. 63.00 Cr.
Dt:. 09-04-2005
18 Months
M/s Unity Infra
projects Ltd, Mumbai
TADIPUDI LIFT IRRIGATION SCHEME
Pkg.No.
: Pump house – I, supply and
commissioning of pumping machinery, transformer,
substation raising main including construction of
pump house and delivery cistern etc., at Km 26.200
on AGRB near Tadipudi (V), Tallapudi (M), West
Godavari (D).
Name of the Contractor
: M/s. Kirloskar Brothers
Agreement Amount
Agreement Date
Mile stones
Date of Completion
: Rs. 30.48 Crs.
: 23-01-2004
:9
: 3/2006
Ltd.

Investigation
: Completed

Designs approved
: 30 Nos. against 40 Nos.

Structures approved
: 2 Nos. against 3 Nos.

Execution (laying pressure mains)
: 12 Kms length against 16 Kms
Pumps
: All 4 Nos. at site
Pump houses
: Completed
Cistern
: Completed
Lifts
: Lift Completed
Pressure mains
: 5 Nos completed against 6 Nos

Qty. of concrete work done
: 5550 cum against 6000 cum

No. of Machinery
: 7 Nos. (3 Cranes, 4 Tippers)

Expenditure
:

LA
: Required 722.78 acres, acquired 434.44 acres
2004-2005
2005-2006
Cum. Inc. Mob. Adv. only
- Rs. 12.70 Crs.
- Rs. 12.14 Crs.
- Rs. 24.84 Crs.
TADIPUDI LIFT IRRIGATION SCHEME
Pkg.No. : Pump House – II,
supply and
commissioning of pumping machinery, transformer,
substation raising main including construction of
pump house and delivery cistern etc., at Km 26.250
on AGRB near Tadipudi (V), Tallapudi (M), West
Godavari (D).
Name of the Contractor
: M/s. Nagarjuna Cont.
Agreement Amount
Agreement Date
Period of completion
: Rs. 30.81 Crs.
: 22-07-2004
: 24 Months (8 Mile
Co.,
Stones)
Target date of Completion : 6/2006

Investigation
: Completed

Designs approved
: 27 Nos. against 40 Nos.

Structures approved
: 2 Nos. against 3 Nos.

Execution (laying Pressure mains) : 6 Kms length against 16 Kms
Pumps
: All 4 Nos. of pumps at site
Pump house
: work is in progress in 1 pump house
Pressure mains
: 2 Nos. against 6 Nos. laid
Cistern
: Completed
Lifts
: work commenced.

Qty. of concrete work done
: 2500 cum against 3500 cum.

No. of Machinery
: Deployed 3 Nos. of Cranes

Expenditure
Crs.
:
Crs.
2004-2005
- Rs. 9.09
2005-2006
- Rs. 9.41
Cum. Inc. Mob. Adv. only
- Rs. 18.50
TADIPUDI LIFT IRRIGATION SCHEME
Pkg.No. : Execution of main canal Km 0.00 to 80.45
and its distributaries, FCs including CM & CD works
complete to irrigate an ayacut of 1,38,000 acres
(appr.)
Name of the Contractor
Agreement Amount
Agreement Date
Period of completion
Date of Completion
: M/s. Mytas Infra Projects Lt
: Rs. 178.36 Crs.
: 04-10-2004
: 24 Months (8 Milestones
: 10/2006

Investigation
: Completed

Designs (Canal)
: 60.45Kms. against 80.45Kms
Structures
: 20 Nos. against 216 Nos.

Execution (Canal)
: 13 Kms length against 80.45 Kms

Qty. of earth work done
: 16.21 Lakh cum against 1,00,00,000 cum

Qty. of concrete work done : 13,600 cum

No. of Machinery
: 60 Nos. (12 executers, 30 tippers, 5 tractors, 5 dozers etc)

Expenditure
:
Acquisition
2004-2005
- Rs. 26.27 Crs.
2005-2006
- Rs. 17.21 Crs.
Cum. Inc. Mob. Adv. only
- Rs. 43.48 Crs Land
: Required 796.33 acres, acquired 112.62 acres
TADIPUDI LIFT IRRIGATION SCHEME
Pkg.No. : Construction of 4 Nos. of LI Schemes (II stage)
at KM 5.00, KM 15.90, KM 33.50 and KM 80.80 of main
canal of Tadipudi LIS. Supply installation, testing and
commissioning of pumping machinery transforms,
substations,
raising
mains,
approach
channels,
construction of pump house, pressure mains one, delivery
system, electrical works etc., and excavation of main canal
and distributaries FCs including construction of CM & CD
works etc.,
Name of the Contractor
: M/s. Unity Infra Projects Ltd
Agreement Amount
: Rs. 63.00 Crs.
Agreement Date
: 09-04-2005
Period of completion
: 16 Months
 Investigation
: Completed
 Designs
: In progress
 Execution
: 5 KM against 200 Km
 Laying of pipe line
: Pump house 1 No. against 4 Nos., Pressure mains : 1 No.
against
4 Nos., Cistern : 1 No. against 4 Nos., Lift
1 No. against 4 Nos.
 No. of Machinery
: 5 (Crane-1 No., Tippers – 4 Nos.)
 Expenditure
: 2005-2006 - Rs. 4.35 Crs. Inc. Mob. Adv. only
Land acquisition
: Required 401 acres, acquired 20 acres