Transcript Slide 1
Swimming Pool Feasibility study Town Hall Presentation 14 August 2013 Gnowangerup Swimming Pool What we know • Original pool (‘mineral baths’) was built in 1934 • Rebuilt inside the original shell and converted to scheme water in 1968 • Pool shell is now cracked, leaking and beyond repair • The existing pool will need to be demolished • Water treatment system is not compliant with the new Code and requires replacement • Pool heating system installed in 2006 is effective and can potentially be retained Population Forecast (WA Tomorrow 2012) Bands B and C show a long term decline Our community – some statistics Shire Population 1,454 Rates Levied $2,493,838 Total Revenue $6,347,220 Who swims? • Mostly school children • Frequently in classes • Some family activity • Lots of season pass users School population in the Catchment Ongerup 43 Borden 31 Nyabing 29 Tambellup 111 Cranbrook 80 Broomehill 60 Gnowangerup District Woodthorpe Total 159 15 528 Demographic profile (WA Tomorrow 2012) Losses forecast in children under 10 and in adults 45-55. Growth in 60-70 years What are the trends and influences • Population is static to declining • 600 in town, 289 houses, 144 families. av age 31 • 1300 in Shire, 710 houses, 328 families, av age 36 • • • • • Principal pool users are children This cohort is declining Big loss of working adults - and volunteers Only growth is oldies They favour hydrotherapy – warm water What’s been happening at the pool? 2009-10 2010-11 2011-12 2012-13 Season Pass 5,177 4,923 5,140 3,969 Swim Lessons 2,123 2,567 2,101 1,810 Child Entry 2,025 2,056 1,948 1,377 Adult Entry 621 463 479 235 Spectators 482 532 421 370 Total 10,428 10,541 10,089 *7,761 Pool patronage Estimated average over last 3 years Estimated entry numbers by type In-term school swim Entry fee Revenue 4,224 1.50 6,336 Vacation swim 640 1.50 960 Adult entry 500 4.00 2,000 Child entry 900 2.50 2,250 1.50* 5,250 Season pass entries 3,500 9,764 16,796 *Estimated average cost per swim from season passes More trends and influences • Pools are primarily used for play or lessons • Limited lap use and almost no competition demand • Adult use is for cooling off, fitness, or supervising children • Grounds and BBQs are a valued feature • Water is becoming more precious • New facilities are mostly co-located & multifunctional • CSRFF tied to increasing participation and accommodation of multiple groups • Facility needs to relate to size of catchment So what does the community want? What does it need? Something close by would be handy! Alternatives are a long way away. • Katanning (85km) • Mount Barker (116km) • Albany (150km). Community Survey Results Element Undesirable Nice to have Essential Total Important Not important Overall Councillors Rank only Learn to swim 0 0 0 17 76 448 1 1 Infant pool 0 1 21 32 38 383 2 2 Lap swimming lanes 0 12 29 22 29 344 3 3 Warmed water 1 7 30 31 22 339 4 4 Water play 0 14 30 20 27 333 5 5 Deep water 1 10 29 21 27 327 6 6 Landscape grounds 0 10 47 15 19 316 7 7 Competition pool 2 25 28 13 20 288 8 8 Heated water 5 22 36 11 11 256 9 9 An early response - H+H Architects Design From this……. 4 lane 25m pool ) Learners pool ) Total area of 264 m2 Toddlers pool ) …....to this $5,805,486 6 lane 25m pool ) Plus Leisure pool ) Total area of 535 m2 What we really need to build Learn to swim Infant pool Lap swimming lanes Warmed water Water play Deeper water Landscaped grounds Competition pool Heated water (indoor) - paramount for safety -0.9m-1.2m deep - for toddlers -150-300mm deep - good for fitness - minimum 25m - to extend season – up to 26 - paramount for fun - 0.0m-2.0m - water confidence & fitness – > 1.5m - key attraction –grassed areas/shade shelters - useful for carnivals - 6 lanes x 25m - for hydrotherapy– up to 35 0 0 Lets specify the elements Element Specification Learn to swim As much shallow water (0.9m-1.2m) as affordable Infant pool Zero depth to 500mm Lap swimming lanes 25m long and as many lanes wide as we can afford and 1.2m deep Warmed water Using the existing solar heating system relocated Water play Shallow through to deep water and portable play equipment Deep water For water confidence and for fun and programming Landscaped grounds Lawns, BBQs, planted wind breaks, shade Competition pool Not required to FINA standard Heated water Not required Other Aesthetic and appealing, easy to access So what could this look like and what would it cost? • View the concept plans Carrying capacity Water body 25m pool (250m2) Bathers per area 1:3.5m2 Number Bathers 71 Learn to swim pool (100m2) 1:2.5m2 40 Deep water pool (30m2) 1:3.5m2 9 Total bathers permitted in the water 120 Construction methods • • • • Concrete Fibreglass - sectional - ALT Fibre reinforced plastic - modular - Yamaha Vinyl covered stainless steel - modular - Myrtha Lap Pool 15m x 5m Learn to swim pool 7.8 x 3.4 x 1.0 Toddlers Pool 7.5 x 4.1 x 0.5 Order of probable cost Stage 1 External Services External Works Landscaping Building Works Swimming Pools Builders Preliminaries Total Construction Cost Contingencies Furniture and Fittings Professional Fees Escalation District Allowance Total Est. Cost Stage 2 Stage 3 41,000 53,985 10,000 145,700 814,950 10,499 96,065 115,484 1,056,715 11,837 163,791 24,500 12,732 124,501 21,008 205,426 $ 161,061 $ 1,574,932 $ Stage 4 132,000 13,200 145,200 22,506 16,771 27,671 212,148 $ Stage 5 10,000 156,055 16,606 182,661 28,312 5,000 21,597 35,636 273,206 $ Stage 6 41,000 98,500 13,950 153,450 23,785 17,723 29,244 224,202 $ Total Options 41,000 53,985 30,000 91,000 244,200 1,103,005 3,000 153,319 33,000 1,686,509 3,383 253,614 29,500 3,638 196,962 6,003 324,988 46,024 $ 2,491,572 $ 23,760 295,520 140,850 48,450 50,858 559,438 57,342 25,000 64,178 105,894 811,852 Revenue Season Pass ($200, $120, $75) School swim/Lessons ($2.00) Casual entry ($2 coin) Government grant Housing rental Event income Hire group fees Total 2015-16 6,000 4,000 5,000 3,000 4,000 750 300 23,050 2016-17 6,750 5,000 7,100 3,000 4,000 1,000 500 27,350 2017-18 6,750 5,500 7,500 3,000 4,000 1,200 750 28,700 Expenditure Salaries Superannuation Chemicals Electricity Water Building maintenance Pool maintenance Grounds maintenance Staff housing Telephone Debt servicing (500K 10yrs) Depreciation (30yrs straight) Events Programming Shire admin allocation Total $ 70,000 8,400 9,500 27,000 5,880 3,500 4,500 8,000 3,000 1,000 35,973 81,667 500 200 8,000 267,120 $ 71,750 8,610 9,738 27,675 6,027 3,588 4,613 8,200 3,075 1,025 35,973 81,667 540 250 8,200 270,929 $ 73,544 8,825 9,981 28,367 6,178 3,677 4,728 8,405 3,152 1,051 35,973 81,667 575 300 8,405 274,827 Analysis Operating loss only $ 118,430 $ 117,740 $ 120,082 Total operating loss including depreciation, debt servicing and shire admin costs $ 244,070 $ 243,579 $ 246,127 Subsidy per entry on all costs $ 27.04 $ 21.56 $ 20.55 Funding Shire of Gnowangerup Reserve Loan Gnowangerup Community State Government DSR CSRFF grant CLGF (2012/13 & 2013/14) R4R (Regional Grouping) Federal Government RDAF + TIRF + ARENA Total Sum % 100,000 500,000 4% 20% 70,000 3% 740,000 630,000 30% 25% 330,000 13% 125,000 5% $2,495,000 100%