Update on Plan for Tier-1 @ KISTI-GSDC

Download Report

Transcript Update on Plan for Tier-1 @ KISTI-GSDC

Ian Bird WLCG MB, 19 th March 2013 March 6, 2013 [email protected]

1

OB: 8

th

March

• • • Removal of support for CMS by ASGC (no Tier 1 or Tier 2) Discussion on rethinking the pledge process/timing Try to avoid the “decreasing spiral pledge” problem Action to discuss with RSG – ideally in MB Presentations on: Concurrency forum and likely evolution Data Preservation – outlook Updating the computing models [email protected]

March 6, 2013 2

OB & LHCC

• • • • Significant topic was resource requests for 2015 Important to have the computing model updates in order for the LHCC to make supporting statements about the due diligence of efforts to be efficient Updated estimates of 2015 needs given to RSG and summarised/discussed in OB and LHCC Details on next slides A few indications of countries where resources may become an issue; but not of major concern yet (but we need to see the pledges!) We assume flat budgets – in some cases they are downwards [email protected]

3 March 6, 2013

1400 1200 1000 800 600 400 200 0 1400 1200 1000 800 600 400 200 0

2013

2015 resources

140 140 120 120 100 80 60 40 20 ALICE ATLAS CMS LHCb 100 ALICE 80 ATLAS 60 CMS 40 LHCb 20 0 0 2013 2015 2013 CPU 2015 Disk 250 120 200 0 2013 2015 100 80 60 40 20 0 Tier 0 Tier 1 Tier 2 150 Tier 0 Tier 1 100 Tier 2 50 2013 2015 2013 2013 Tape 2015 2015 2013: pledge OR actual installed capacity if higher March 6, 2013 [email protected]

4 ALICE ATLAS CMS LHCb Tier 0 Tier 1

Resource evolution – 1

• • For ALICE requests essentially flat for 2014/15, assuming KISTI + Mexico are available Have introduced new processing schema, less full processing passes Significantly improved CPU efficiency for analysis  ATLAS: Ongoing efforts to reduce CPU use, event sizes, memory, … Fit within a flat budget, but assumes event sizes and CPU/event are at 2012 levels – this implies significant effort during LS1 to achieve Plans for improvements are ambitious  [email protected]

5 March 6, 2013

• •

Resource evolution – 2

CMS: • 2015 request also fits within a flat budget, as long as 2014+2015 are planned together (step from flat resources to 2015 needs exceeds flat funding) Significant effort required to reduce potential x12 increase in need (to get back to “only” x2) due to: Pile-up increase, change of trigger rates, going from 50-25ns (had unexpected effect on reco times) Use Tier 1s for prompt reconstruction; do only 1 full reprocessing / year Also commissioned large Tier 2s for MC reconstruction, using remote data access (result of data federation work in last 18 months) LHCb: Have sufficient CPU for LS1 needs; but limited by available disk • Potentially means cant use all CPU in 2014, then implications for 2015 (MC work gets pushed back) Significant effort needed to reduce size of DST & no. disk copies They have already reduced disk copies so now needs significant changes in data management to get more gains Also working to improve software, but needs specialised effort (parallelisation, etc) March 6, 2013 [email protected]

6