2010 PowerPoint Template

Download Report

Transcript 2010 PowerPoint Template

1st Quarter
Contractor Business Meeting
Facilities Session
March 9, 2012
Mike Kehoe
Plant Engineering
Agenda
– Security
• Vendor Passes and Drive-in Tags – Natalie Joyner
• Camera Phones
– Contractor Crane Operations – Kehoe
• Lift Plans
• Contractor Crane Briefing
– Pre-Task Planning – Kehoe
– Unplanned Event – Sensitive Work Area – Kehoe
– Safety – Rod Taylor
• Update to Y-1078
– Cranes
– Controls
• Scaffolds and Ladders
– O55 Commercial Procurement – Ed Wright
2
O15 Security Review
• NN 9327 – Non-Employee Access Badge Request
• Visitor Management System (VMS)
– NNS Procedure 12-202 (Access to Company Premises)
– NNS Procedure 12-200 (Identification Badges and Passes)
• Drive –In Tag Request
– NN 9297 – Newport News Shipbuilding Drive-In Tag Request
– NNS Procedure 12-206 (Vehicle Access)
• Camera Phone Reminder – They are not permitted anywhere in the
plant.
3
Contractor Crane Operations - Lift Plans!
• Lift plans are required for each and every lift while working for HII-NNS
on or offsite.
• They must be briefed by the foreman prior to the lift.
• L&H consultants/management will monitor their use and shut down
any lift that is not in compliance with this requirement.
4
Lift Plans
• Yard-wide Lifting and Handling Requirements for Departments working
with contractors. Lift plans are required for all suspended loads. This
includes loads suspended from forklifts, backhoes, etc. Lift plan issues
and accident reporting apply to rigging applications as well as crane
work.
• Take two. Take time to review the lift plan, equipment and rigging.
After the job is hooked up and the rigging is snug, stop before you lift
and do a second check or a ‘take two’ to ensure everyone is really
ready and the travel path is clear.
• Remember: ANYONE is authorized to stop the lift when conditions are
questionable.
5
Contractor Crane Briefing Class
• Mandatory for all contractor crane operators before performing lifting
and handling operations. Attendance of riggers is recommended but
optional.
• Scheduled only 1 day each month in B133-2.
• Class size is limited to 15.
• Ask your contract coordinator about class schedule.
• E- mail to [email protected] to sign up for class.
• Attendance records are maintained. Not required to attend more than
once.
6
Pre-Task Planning
• All projects are to have pre-task plans.
• Review plan with work crew before commencing the work
• Important to evaluate your work area
• Identify potential hazards
• Review required PPE (Personal Protective Equipment)
• Describe work to be performed, hazards associated with each step, and how to
eliminate or control the hazard
• Identify sensitive work areas
• Work crew sign off
• Contract Coordinators/Field Engineers should audit pre-task plans.
7
Pre-Task Planning
8
Unplanned Event – B522 datacenter power outage
9
Unplanned Event – B522 datacenter power outage
• Sensitive Work Areas –
– What are the working conditions that may be unique to the area of work?
– Sensitive work areas must be identified and required approvals must be given.
10
Control of Hazardous Energy – Update to Y-1078
• Changes in Y-1078
– Driving to try to lock everything
• One additional safety measure must be taken if only a tag can be used
to secure an energy isolation device.
• Devices controlling gravity (blocking, stands, etc.) that are in direct
proximity of the work area and clearly visible are excluded.
• General Foreman or equivalent approval must be obtained.
• If an energy source can re-accumulate hazardous energy levels, then
zero energy must be verified at least at the beginning of each shift or
more frequently if needed.
11
Cranes
• Working around cranes
• Controls
– In direct path of crane structure
– Not in direct path of crane structure
12
Scaffold and Ladders
• Scaffold ladder requirements are contained in the Contractor Resource
Manual.
13
Newport News Shipbuilding “Supplier Gateway“
http://supplier.huntingtoningalls.com/sourcing/index.st
m
O55 Commercial Procurement
*Facilities & Major Capital Projects Buying Team
– Ed Wright
– Dale Martin
– Carla Potter
757-688-1533
757-688-5279
757-688-4952
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
O55 Commercial Procurement
Newport News Shipbuilding “Supplier Gateway“
http://supplier.huntingtoningalls.com/sourcing/index.stm
QUESTIONS????
• If you have questions regarding this presentation, please contact your
Contract Coordinator or:
Mike Kehoe
O41 – Plant Engineering
757-534-3241
[email protected]