Construction of Dehkanabad plant of
potassium fertilizers on the base of
Tyubegatan potash deposit
Scheme of location of objects of the Dehkanabad plant
50 km
Karshi
41 km
Guzar
Processing complex
Dehkanabad
Dehkanabad
railway station
Housing
Sodium chloride storehouse
Railroad stockroom
49 km
(35 km - village road)
Tyubegatan potash deposit
Turkmenistan
Created capacities of the plant
200 thousand tones of potassium fertilisers per annum
К2О contamination, not less %
60
Moisture, not less %
2
Ca + Mg, not less (%)
NaCl, not less %
Insoluble matter, not less %
0,4
2
0,3
СПОСОБЫ ДОБЫЧИ И ПЕРЕРАБОТКИ РУДЫ
Method of
development
Method of ore
processing
Mining method.
Volume of ore extraction - 700 thous.
tons/year.
Mining combine with point sequence is used.
Flotation method.
Ore sharing to NaCl and KCl
KCl – 200 thous. tones/year
NaCl and admixtures – 375 tones/year
Merit extraction of KCl from ore - 85%.
ENTERPRISE STRUCTURE







Mine with additional complex
Transport gallery for ore transporting L= 500
meters
Processing complex – 700 thous. tones/year
Sodium chloride open warehouse – 70 hectares
Railroad warehouse of ready-made product 10 thous. tones/year
Housing for 2.5 thousand inhabitants
RAW MATERIAL BASE
Potash ore
Technical water
Feed water
Electric power
Natural gas
Tyubegatan deposit (КCl in ore - 36,88%).
Total ore resource – 309 ml. tones. Resources
of processing site I - 80.7 ml. tones (31.9 ml.
tones of KCl).
Ore requirement - 700 thous tones/year
Dehkanabad water reserve.
Requirement – 1.296 ml м3 per annum
Aksu-Dehkanabad sluice (under construction).
Requirement - 1000 м3 per day
According to Uzbekenergo specifications.
Requirement - 6 МWТ per annum
Beshbulak . Requirement - 5 ml м3 per annum
(without considering the requirements of
housing and attached populated area)
PERIOD OF LIFECYCLE AND PRODUCTION
Construction period
50 months
Lifecycle period
43.3 years
Capacity load:
1 year
2 and further periods
80%
100%
MARKET
thous tn
Country requirement
(according to Ministry of agriculture and water
resources of Uzbekistan)
Possible export to the neighboring countries
(Tajikistan, Kirghizistan, Kazakhstan,
Turkmenistan and Afghanistan)
Main competitors
270 KCl (physical compound)
50
Russia, Byelorussia,
Turkmenistan (if similar plant is built)
MAIN TRENDS OF TECHNICAL ECONOMICAL
ASSESSMENT *
Capacity, thous. tones
200
Capital investments, USD ml
85
including:
bank credits
centralized sources (equivalent)
58
27
Price of 1 ton of product at the warehouse, USD.
95
Volume of commodity output, USD ml.
19
Number of created workplaces, persons.
600
Credit reimbursement period, years (preliminary)
15
Period of construction, years
4
Pay-back period, years (if profitable approx 30%)
10
* Estimated data will be determined in technical economical assessment TEO