Transcript Slide 1

FR-AIS Technical Architecture
Speaker: Thomas LUTZ
Author: Hannes BRUNNER
Washington, March 2008
About the speaker
 Thomas Lutz is a Senior Software Designer of the FR-AIS
software (FR-AIS – Frequentis Aeronautical Information
Management System).
 Mr. Lutz has 10 years experience in software design and
development for information systems for air traffic management
and Geographical Information systems.
 He was instrumental in the development of the Eauropean
Aeronautical Database (EAD) and the new AIXM compliant
Canadian AIS system in 2007.
 In his recent work on EAD and the Frequentis AIS using AIXM Mr.
Lutz has hands on experience with the latest AIXM technologies.
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 2
AIXM 5 – a great step ahead
 The introduction of AIXM 5 will be another great step ahead for air
traffic safety. It will bring
 Better efficiency and safety of aeronautical data interchange
 Move away from message-centric to data-centry approach
 Improved situational awareness
 Great platform for integrating with non-AIS systems
 Good basis for system implementations based on the underlying
UML model (AICM)
 Integration of static data with dynamic data (XNOTAM)
 Adoption of open standards (e.g. ISO 19100 etc.)
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 3
AIXM 5 Key Improvements
1. Temporality
-
Baseline
-
Version
-
Permanent Delta
-
Temporary Delta
2. Extensibility
-
New features
-
New attributes
-
New domain values
3. Introduction of Metadata and Integrity
4. Geometry information in GML
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 4
What are the challenges? (technical)
 Technical impact on existing systems:
-
Adaptation of underlying data model requires significant (costly) changes of
the systems / software
modifications
-
Interface implementations have to be adapted
-
Techical / commercial: often a procurement has to take place to order system
changes
-
Connected legacy systems may not support the new functionalities
-
Backwards-compatibility not always possible
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 5
How to deal with the technical impacts?
 Less complicated than the operational impacts
 FR-AIS will try to hide the technical changes and will keep a
compatibility layer
 AIXM 5, AIXM 4.5, AIXM 3.3 and ARINC 424 and other exchange
formats will be supported
 Not all compatibility levels have the same level of functionality
 Interface-level compatibility will be retained as far as possible
 New domain values will be mapped to old ones
 Incremental implementation of AIXM 5 features
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 6
What are the challenges? (operational)
 Operational impacts:
-
End-users have very limited interest in the technical realisation – everything
should stay as it is.
-
Considerable training effort involved in data model changes due to changing
HMIs
-
Some changes in AIXM 5 like XNOTAM are philosophy changes and may
require operational re-structuring
-
Significant impacts on operational procedures
-
Operational impact of system changes – every technical transition has an
impact on operations
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 7
How to deal with the operational impacts?
 Try to keep techical changes as far as possible transparent, new
features are optional
 Keep HMI and work flow as close as possible to existing
implementation.
 Perform technical upgrade incrementally to avoid resource impact
 Perform philosophy-related changes later in the process
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 8
Incremental Upgrades Release 5 (e.g.)
 Step 1a Implementation of Data compatibility Layer and flexible Rule
Engine
-
Data compatibility layer allows different formats for data input and output
Supports different AIXM versions, ARINC 424, other formats, custom formats are
possible (custom reports)
Rule management is enhanced to allow more flexible definition and modification of SDO
rules
 Step 1b: Implementation of temporality Model for PERM data and
UP/download interfaces and Obstacle Model
-
As FR-AIS supports large parts of the temporality model already, this is not such a big
change
Introduction of flexible “data states“ allowing flexible adaptation of workflow to current
practice or intermediate strategy
 Step 1c: De-coupling of HMI from underlying AICM version
-
Allow AIXM version of choice for each user / (sub)organisation
 Step 1d: Extensibility
-
Flexible modification and addition of new entities and attributes
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 9
Current Status
 Implementation is converging with AIXM 5
 Several key features are available or will be available soon
 Additional AIXM 5 features are constantly being added
 Underlying implementation will be AIXM 5 long before exposure
to end-users
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 10
Making AIXM 5 attractive to end-users
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 11
Making AIXM 5 attractive to end-users
© FREQUENTIS 2007
File: fr-ais_architecture
Date: (c) Dec 2005
Author: H. Brunner
Rev.1
Page: 12
Questions?