Transcript Document
INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details 1 UPGRADATION DETAILS (wherever only upgradation is taken up) Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 62 81 130% 2 Aug-07 64 84 131% 3 Aug-08 80 84 105% 4 Aug-09 68 90 132% TOTAL 274 339 124% Admission Rate % = Filled Seats/Sanctioned Seats * 100 2 BBBT DETAILS Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 96 114 119% 2 Aug-07 96 120 125% 3 Aug-08 96 144 150% 4 Aug-09 96 132 137% TOTAL 384 510 139% Admission Rate % = Filled Seats/Sanctioned Seats * 100 3 ADVANCE MODULE DETAILS Sanctioned Seats Filled Seats Admission rate % Sr. No. YEAR 1 Aug-07 / Feb-08 96 65 20 67% 21% 2 Aug-08 / Feb-09 96 73 15 76% 15% 3 Aug-09 / Feb-10 96 94 31 98% 32% TOTAL 288 232 66 81% 23% August February August Admission Rate % = Filled Seats/Sanctioned Seats * 100 February 4 INDUSTRY SPECIFIC MODULE DETAILS Sr. No. YEAR Filled Seats No. of Industries Admission rate % 1 Aug-07 / Feb-08 0 0 0 2 Aug-08 / Feb-09 0 0 0 3 Aug-09 / Feb-10 0 0 0 TOTAL 0 0 0 Admission Rate % = Filled Seats/Sanctioned Seats * 100 5 APPRENTISE TRAINING Sr. No. YEAR DESIGNATED TRADE 1 2007-08 NA 2 2008-09 3 2009-10 NO. OF TRAINEES ENGAGED NA NA NA NA NA 4 TOTAL 6 TRANSITION RATE Sr. No. YEAR BBBT to ADVANCE (X) Transition rate 1 Aug-07 / Feb-08 65/20 46% 2 Aug-08 / Feb-09 73/15 40% 3 Aug-09 / Feb-10 94/31 48% TOTAL 232/66 45% Note: How Many Students joined Advance Module from the lot of X ( X = BBBT Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admited in Advance Module / X 7 TRANSITION RATE Sr. No. YEAR ADVANCE to INDUSTRY SPECIFIC (X) 1 Aug-07 / Feb-08 0 0 2 Aug-08 / Feb-09 0 0 3 Aug-09 / Feb-10 0 0 TOTAL 0 0 Transition rate Note: How Many Students joined Specific Module from the lot of X ( X = Advance Module Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admitted in Specific Module / X 8 PASSOUT RATE - BBBT (NCVT Pattern) Sr. No. YEAR Total Appeared Total Passout 1 Jul-07 85 77 2 Jul-08 97 95 3 Jul-09 108 106 TOTAL 290 278 PASSOUT RATE - ADVANCE MODULE Sr. No. YEAR Total Appeared Total Passout 1 Feb-08 55 50 2 Feb-09 73 68 3 Feb-10 88 59 TOTAL 21 6 177 PASSOUT RATE - For ITI taken up for upgradation (NCVT Pattern) Sr. No. YEAR Total Appeared Total Passout 1 Jul-07 59 59 2 Jul-08 61 59 3 Jul-09 35 35 TOTAL 134 133 9 PLACEMENT EMPLOYMENT Sr. No. 1 YEAR 2006 – 07 2007 – 08 2008 - 09 TOTA L PASS ED 463 522 517 EMPLOYMENT IN INDUSTRY 210 240 225 SELF EMPLOY MENT NIl NO. OF REGISTRATION WITH EMPLOYMENT EXCHG. 398 475 435 NO. OF CAMPUS INTERVIEW HELD 15 20 23 10 EARNINGS PER MONTH Sr. No. YEAR AVERAGE MONTHLY SALARY 1 2006-07 Nil 2 2007-08 3350 3 2008-09 3600 Total Average 3475 11 PROCUREMENT OF GOODS ITI's (FOR 6 BBBT + 3 ADVANCE + 6 UPGRADED TRADES) Total No. of Unit NAME BBBT AM TRADE (Trade taken for Fundamentals of elect. & comp. Basic fitting Basic mechanical process Fundamentals of general chemistry Basic Instrumentatio n Basic unit operation Advance aocp Advance Im Advance lacp FT WD IT AOCP LACP Total Required Qty. Total Available Qty. % Availability 1 172 161 94 % 1 1 668 818 633 778 95 % 95 % 1 769 763 99 % 1 818 785 96 % 1 342 329 96 % 1 1 1 2 1 1 1 1 510 595 250 1041 678 171 1379 4609 489 486 141 943 648 141 1329 4539 96 % 82 % 57 % 91 % 95 % 83 % 96 % 98 % 12 COUNSTRUCTION OF CIVIL WORKS Sr. No. 1 2 ADDITION AND ALTERATION / NEW WORK Total Progressive Expenditure incurred Rs. 68.63 lacs. Expected Date of Completion : work completed SET UP OF ADVANCE MODULE WORKSHOP 1 Expected Date of Completion : Work completed CONSTRUCTION PHOTOGRAPHS REQUIRED 13 STAFF VACANCY (To be filled by November-2009) Sr. No. ITEM No. of Sanctioned No. of Filled No. of Vacant 1 Principal 01 0 01 2 Teaching Staff 54 44 11 3 Other 20 15 05 75 59 17 Total 14 Training of Trainers Sr. No. Total Instructors No. of Instructor 1 55 No of Instructor Completed training CTI CTI Training Training POT 1 Year Training 3 Months 12 02 CTI Engineering Technology 3 Month CTI Trade Technology 6 Month - - BBBT 01 AM 02 Other Training more than 7 Days 03 15 REVENUE GENERATION Sr. No. Revenue Generated (Rs.) ACTIVITY Budget I ncome of institute 0230 Labour & employment 4.60 1 (Please attach detail sheet of Revenue Generation) 16 PLACEMENT BEREAU ACTIVATION Sr. No. 1 2 3 YEAR 2006-07 2007-08 20008-09 Total Total Trainee Pass out 77 169 191 437 Bio Data Placed on Website Registered With Employment Exchange 77 169 191 437 35 117 162 314 No. of Campus Interview Held 10 09 19 No. of Trainee got Job Avg. Salary / Month - -- 17 BUDGET - EXPENDITURE DETAILS Sr. No. Comp onent Budget Provision (Year2009-2010) Expenditure Remaining Expenditure Plan Non Plan Total Plan Non Plan Total Plan Non Plan Total 1 Miscell aneous - 19.20 19.20 - 19.20 19.20 - - - 2 Machin ery & Equip ment - 6.00 6.00 - 5.98 5.98 - - - 3 Civil 32.42 - 32.42 - - - 32.42 - 32.42 TOTAL 18 WOMAN PARTICIPATION Sr. No. STEPS TAKEN TO INCREASE PARTICIPATION RESULTS Will be seen in Aug. 2010 1 1. Jagruti abhiyan . 2. Seminar in school. 3. Advertisement ACTION TAKEN FOR ALLUMNI ASSOCIATION Sr. No. STEPS TAKEN TO ASSOCIATE THE ALLUMNI RESULTS Nil 1 Nil 19 ACTIVITY FOR DISADVANTAGE GROUP Sr. No. 1 STEPS TAKEN 1. Jagruti abhiyan . 2. Seminar in school. 3. Advertisement RESULTS Will be seen in Aug. 2010 ORIENTATION PROGRAM FOR IMC Sr. No. 1 STEPS TAKEN Meeting Contacts RESULTS IMC formed & Expenditure for COE to develop COE sector. 20 RAISING AWARENESS AMONG POTENTIAL STUDENTS & INDUSTRY Sr. No. STEPS TAKEN RESULTS 1 Industrial visit - About 200 students visited several Industry. 2 Campus Interview -06 Companies have arranged campus Interview. - 187 Students attended & 89 students selected. 3 On Job Training - 40 trainees will go for on job training during April – 2010. 21 PART: 2 Best Practices Presentation 22 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE GATE OF ITI Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD SIGN BOARD NEAR GATE OF ITI Before After I.T.I. PARDI LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE ROAD TO ITI Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COE BUILDING Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD LANDSCAPING & FRONTAGE Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING BLOCK B LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD BUILDING & WORKSHOP CORRIDORS Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD THEORY & AUDIO VISUAL ROOM Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CONFERENCE ROOM Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Existing workshop for CHBT • • • • • • Mod.1 - Fundamental of Electronics & Computers Mod.2 - Basic Fittings and Measurements Mod.3 - Basic Mechanical Processes Mod.4 - Fundamental of General Chemistry & Mod.5 - Basic Instrumentation Mod.6 - Basic unit Operations and Processes Physics LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT-1 Electronics & Computers Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 2 Basic Fitting Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 3 Mech.Process Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 4 Chemistry Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 5 Instrumentation Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 6 Unit Operation Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHAT 01 ADV. AO Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHAT 03 ADV. IM Before After Instrument Mechanic Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ELECTRONICS LAB Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD IT LAB Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Before Plastic Processing Operator After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Wireman Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Mechanic Diesel Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COPA Lab. Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD APPAREL PARK LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COE STAFF DRESS CODE Before After PLACEMENT ADVISORY After BUREAU Before PLACEMENT ADVISORY BUREAU Before After LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Website of ITI Training Materials for each COE Module M-1 Fundamental of Electronics & Computer Lesson No.. Lesson Name 1 Atomic theory 2 Active & Passive components 3 Integrated circuits 4 Logic Gates 5 MS- Word 6 MS- Excel 7 MS - powerpoint 8 AutoCAD Training Materials for each COE Module Basic Fittings and Measurements M- 2 Lesson No. Lesson Name 1 Vernier Caliper 2 Micrometer 3 Dial Gauge 4 Hand Tools 5 Drilling Machine 6 Limit- Fit 7 Taps & Die 8 File, Hackshaw, Bench vice Training Materials for each COE Module M-3 Basic Mechanical Processes Lesson No. Lesson Name 1 Lathe machine 2 Cutting tool material 3 Tapper turning 4 Welding 5 Metal joining process 6 Thread cutting 7 Safety precaution Training Materials for each COE Module Fundamental of General Chemistry & Physics M -4 Lesson No. Lesson Name 1 Units & Measurement 2 Viscocity & Density 3 Acid , baise solution 4 Metal & Non metal 5 Transformers 6 Volumetric Analysis 7 Physical dimension Training Materials for each COE Module Basic Instrumentation M -5 Lesson No. Lesson Name 1 Pressure measurement equipments 2 Temperature measurement equipments 3 Level Indicators 4 Purge systems 5 Flow meters 6 PH meter 7 Hygro meter, Hydro meter 8 Anemometer Training Materials for each COE Module Basic unit Operations and Processes M -6 Lesson No. Lesson Name 1 Fluid flow operation 2 Extraction & leaching 3 Absorption & Adsorption 4 Lagging material 5 Distillation 6 Fertilizers 7 Mfg. processes Urea, Soap, Nitric acid etc. 8 Screening 9 Filteration Training Materials for each COE Module Adv. AOCP Lesson No. Lesson Name 1 Fluid Transportation 2 Valves 3 Pumps 4 Heat transfer 5 Evaporation 6 Distilation & its types 7 Centirifugation 8 Crystalisation 9 Water & Air polution LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Energy Saving Status of ISO Certification • ISO Consultant has been selected and order to be given to Ahmedabad neboulous. • ISO training has been conducted on dated 5th Jan. 2010, 22nd Feb. 2010, 19th March. 2010. • ISO audit will be conducted on 16th April 2010. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Civil Work under CoE For New Building • Rs. 32 Lac. Sanctioned for new building. • T.S. approved tendering process by PWD. Will be carried out. • For New Existing Building • Electrification compeleted. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Miscellaneous Expenditure •Provision for current year 2009- 2010 Rs. 19.20 lacs. • How many tender issued Nil • How many order placed Nil • Amount of Expenditure incurred upto 31st March 2010 Rs. 19.20 lacs. •How much expenditure is to be incurred up to March - 2010 Rs. 19.20 lacs. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Machinery Equipment •Provision for current year 2009- 2010 Rs. 6 lacs. • How many tender issued Nil • How many order placed Nil • Amount of Expenditure incurred upto 31st March 2010. Rs. 5.98 lacs. •How much expenditure is to be incurred up to March - 2010 Rs. 5.98 lacs. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Status of On roll in BBBT/ Advance Module •On Roll BBBT 132 •Advanced AOCP 11 •Advanded IMCP 11 •Advanced LACP •Total 10 164 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation • Open land available in sq. mt. 86821 sq.mt. • Perimeter of Boundary wall in meter of compund 1200 mts. •How many plants planted in July 2009 5000 Nos. • How many plants survived as on 31st March 4500 + (984 grown up trees till June 09) 2010. • Which different type of plants planted in ITI in July 2009 Boganvel, Neem, Saptapadi, Asopalav & others. Plantation LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation Survival Plantation Plantation Plantation Plantation Plantation Plantation Plantation Plantation LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Seminar on E.M.F. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Staff Meeting THANK YOU 80