European Grid Development, Market
Development and Renewable Energy
International Energy Conference
Copenhagen, 12 March 2008
Peter Jørgensen
Vice President, Planning
12 March 2008
New Tasks, New Tools
1
Agenda
Third Package - Infrastructure Development
Unique Role of TSO’s
From National to Regional and European Planning
From Planning to Investment Decisions – Incentives and Criteria’s
Public Authorization Procedures
12 March 2008
New Tasks, New Tools
2
Third Liberalization Package
- infrastructure development
Unbundling
-
Avoid distorted investment incentives within integrated companies
Strong national regulators
-
Review investment plans of TSOs
-
Monitor network security and reliability
ACER – Agency for the Cooperation of Energy Regulators
-
Perform regulatory oversight of ENTSO – 10-year investment plans
-
Decide on regulatory regime applicable to infrastructure
ENTSO – European Network of Transmission System Operators
12 March 2008
-
Identify, manage and finance research and innovation
-
Coordinate grid operation according to agreed codes
-
Perform investment planning – coordinated long term planning
-
Prepare system adequacy forecasts for summer, winter and long term
New Tasks, New Tools
3
Responsibility of TSO’s
- from long term planning to real-time operation and settlement
-25 year
-1 year
-1 month
-1 week
-1 day
Real-time
Operation
Planning and R&D
Building and maintenance of infrastructure
System operation
Market operation and settlement
Unique strength of TSOs to embrace the full responsibility!
12 March 2008
New Tasks, New Tools
4
From National to Regional Planning
- the Nordel example
3 Nordic Grid Master Plans in last 10 years
Reinforcements in 5 prioritized cross
sections proposed in 2004
- Comprehensive analysis based on common
data and models
- 4 projects decided – 1 pending
18
12
10
2
9
Nordic Grid Master Plan 2008
- Nordel Scenarios for 2015 and 2025
- Proposals for internal and external
reinforcements
4
1
Sweden
17
Finland
8
17
5
17
28
3
Norway
11
Great Britain
15
26
25
7
23
6
13
Denmark
24
14
16
20
31
Netherlands
27
21
22
19
Poland
30
Balticum
Germany
12 March 2008
New Tasks, New Tools
5
Nordic Grid Master Plan
Market functioning
- Price formation in the integrated
NordPool spot market – statistics
and modeling
Security of supply
- power and energy balances –
statistics and modeling
- margins to market failure and
system failure – statistics and
modeling
12 March 2008
New Tasks, New Tools
6
Nordic Grid Master Plan
Reinforcements
- Internal and external
reinforcements analyzed
- Reinforcement of external Nordic
interconnections in general shows a
positive cost-benefit
Investments
- Level for infrastructure investments
will be tripled
12 March 2008
New Tasks, New Tools
7
Danish Grid Development
Major reinforcements will be
triggered by international
power market and off-shore
wind
Alternative 1
Norge
Sweden
Skagerrak
SK 1&2
SK 3&4
Konti-Skan
KS 1&2
Vester Hassing
Glentegård
Ishøj
København
Ferslev
OVerloaded connections
Overload > 150 %
Overload > 125 <= 150 %
Overload <= 125 %
Tjele
Idomlund
Urgent need for:
Askær
- New guidelines on the use of
overhead lines/underground
cables
- Efficient and faster public
authorisation procedures
12 March 2008
Trige
New Tasks, New Tools
Endrup
Sweden
Gørløsegård
Hovegård
Landerupgård
Herslev
Storebælt
Bjæverskov
SB 1&2
Fraugde
Kingstrup
Kassø
Germany
Kontek
Rødsand
Germany
8
Detected Bottlenecks during n-1 conditions of UCTE
“Scenario North”
source: EWIS study
Obvious need for planning and investment decisions on European level!
12 March 2008
New Tasks, New Tools
9
From planning to investment decisions
- incentives and criteria’s for investment decisions
New interconnector capacity may cause
considerable redistribution of wealth
compared to the net socio-economic
benefit - distributed in several countries!
Gen
Con
Cap Net
Optimal interconnector capacity differs
significantly between private and socioeconomic welfare criteria’s
Regulation, allocation of congestion rents & compensation mechanisms must
support socio-economic optimal investments on regional/European level!
12 March 2008
New Tasks, New Tools
10
Summary
Some basic prerequisites for the timely development of
infrastructure to support a well-functioning European electricity
market, security of supply and massive integration of RES are:
Efficient TSO-cooperation on European and regional level
- coordinated and qualified planning procedures and investment decisions
Strong national and European regulation
- investment criteria’s based on socio-economic welfare
- incentives for investments supporting goals on regional and European
level
Politically supported guidelines for new infrastructure
Efficient public authorization procedures
12 March 2008
New Tasks, New Tools
11